Excavation and backfilling in trench normal material for Dia 90 m3 150.00 350.00 52,500.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 2.00 1,150.00 2,300.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
-
40 mm diameter m 150.00 130.00 19,500.00
32 mm diameter m 100.00 100.00 10,000.00
25 mm diameter m 250.00 60.00 15,000.00
-
REDUCERS -
40 x32 mm No 1.00 90.00 90.00
32x 25mm No 1.00 90.00 90.00
-
UPVC TEE -
40 X 25 mm No 2.00 337.00 674.00
32 X 25 mm No 2.00 175.00 350.00
25 X 25 mm No 2.00 40.00 80.00
-
TOTAL CARRIED OVER TO GRAND SUMMARY 100,584.00
2 NYAMBURA LINE
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 159.00 350.00 55,650.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 2.00 1,150.00 2,300.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN10 -
40 mm diameter m 150.00 130.00 19,500.00
32 mm diameter m 120.00 100.00 12,000.00
25 mm diameter m 260.00 60.00 15,600.00
-
REDUCERS -
40 x32 mm No 1.00 90.00 90.00
32x 25mm No 1.00 90.00 90.00
-
UPVC TEE -
40 X 25 mm No 2.00 337.00 674.00
32 X 25 mm No 2.00 175.00 350.00
25 X 25 mm No 2.00 40.00 80.00
-
TOTAL CARRIED OVER TO GRAND SUMMARY 106,334.00
KATHERU LINE (right)
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 27.00 350.00 9,450.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 1.00 1,150.00 1,150.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
32 mm diameter m 24.00 100.00 2,400.00
25 mm diameter m 66.00 60.00 3,960.00
-
REDUCERS -
40 x32 mm No 1.00 90.00 90.00
32x 25mm No 1.00 90.00 90.00
-
UPVC TEE -
32 X 25 mm No 3.00 175.00 525.00
-
-
TOTAL CARRIED OVER TO GRAND SUMMARY 17,665.00
KATHERU LINE (left)
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 15.00 350.00 5,250.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 1.00 1,150.00 1,150.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
25 mm diameter m 50.00 60.00 3,000.00
-
UPVC TEE -
25 X 25 mm No 2.00 40.00 80.00
-
-
TOTAL CARRIED OVER TO GRAND SUMMARY 9,480.00
ISIAH LINE (RIGHT)
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 30.00 350.00 10,500.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 1.00 1,150.00 1,150.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
25 mm diameter m 100.00 60.00 6,000.00
-
UPVC TEE -
25 X 25 mm No 2.00 40.00 80.00
-
-
-
TOTAL CARRIED OVER TO GRAND SUMMARY 17,730.00
ISIAH LINE LEFT)
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 54.00 350.00 18,900.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 1.00 1,150.00 1,150.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
25 mm diameter m 180.00 60.00 10,800.00
-
UPVC TEE -
25 X 25 mm No 2.00 40.00 80.00
-
-
TOTAL CARRIED OVER TO GRAND SUMMARY 30,930.00
NJERU NJAGI LINE
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 105.00 350.00 36,750.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 2.00 1,150.00 2,300.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
-
40 mm diameter m 150.00 130.00 19,500.00
32 mm diameter m 100.00 100.00 10,000.00
25 mm diameter m 100.00 60.00 6,000.00
-
REDUCERS -
40 x32 mm No 1.00 90.00 90.00
32x 25mm No 1.00 90.00 90.00
-
UPVC TEE -
40 X 25 mm No 2.00 337.00 674.00
32 X 25 mm No 3.00 180.00 540.00
25 X 25 mm No 2.00 40.00 80.00
-
TOTAL CARRIED OVER TO GRAND SUMMARY 76,024.00
MUSA LINE
Excavation and Backfilling
Excavation and backfilling in trench normal material for Dia 90 m3 240.00 350.00 84,000.00
mm pipe for depth not exceeding 1.5 m
-
E.O for excavation in soft rock (provisional) m3 4.00 1,150.00 4,600.00
-
Pipework -
-
Provide, lay, joint and test the following flexible spigot and socket -
pipe and fittings with rubber ring joints. Rates to include for all
jointly materials, cutting wastage.
-
Note: Pipe dimensions/working pressures shall conform to KS-06- -
149 Part 2:2000.
Upvc Straights -
-
PN8 -
-
50 mm diameter m 470.00 130.00 61,100.00
40 mm diameter m 180.00 130.00 23,400.00
32 mm diameter m 100.00 100.00 10,000.00
25 mm diameter m 50.00 60.00 3,000.00
-
REDUCERS -
50 x 40 mm No 1.00 230.00 230.00
40 x32 mm No 1.00 90.00 90.00
32x 25mm No 1.00 90.00 90.00
-
UPVC TEE -
50 X 25 mm No 4.00 450.00 1,800.00
40 X 25 mm No 1.00 337.00 337.00
32 X 25 mm No 2.00 175.00 350.00
25 X 25 mm No 2.00 40.00 80.00
-
TOTAL CARRIED OVER TO GRAND SUMMARY 189,077.00
SUMMARY SHEET
KANDUVIO DISTRIBUTION LINES.
1.MWAFRIKA LINE 100,584.00
NYAMBURA LINE 106,334.00
KATHERU LINE (right) 17,665.00
KATHERU LINE (left) 9,480.00
ISIAH RIGHT 17,730.00
ISIAH LEFT 30,930.00
NJERU NJAGI LINE 76,024.00
MUSA LINE 189,077.00
TOTAL 547,824.00