Jul-23
Jul-23
Jul-23
ANKUSH RAMA RAMGUDE & PUNAM ANKUSH BILL DATE METER STATUS CYCLE NUMBER TYPE OF SUPPLY
RAMGUDE 22-Jul-2023 Active 04 SINGLE PHASE
20/H1/205 SANGHARSH NAGAR CHANDIVALI FARM
ROADCHANDIVALI ANDHERI E MUMBAI 400072
TARIFF CONNECTION DATE SANCTIONED LOAD (kW) BILL NUMBER
Mobile : 95********07 LT I (B) 29-09-2021 1.00 101265767420
Email : ramg********[email protected]
PAN : BILL DISTRIBUTION NO. BILLING STATUS PRESENT READING DATE PREVIOUS READING DATE
CA NO:153129900 Bill Month Units Consumed Current Month Bill Previous Outstanding
CONSUMPTION TREND Current year Previous year MAJOR BILL COMPONENTS (Rounded off amt)
FAC 0
336
NET OTHER(Cr) 2
252
NET PREV 6
DUTIES/TAXES 203
84
WHEELING 316
143
333
161
325
152
296
146
149
117
133
125
134
118
157
87
61
43
94
60
36
70
67
0 ENERGY 596
Jul Jun May Apr Mar Feb Jan Dec Nov Oct Sep Aug
Join us on:
IMPORTANT MESSAGE
l Please note that all important communication related to your account are being sent on 95******07
registered with us. In case of any change, do inform us immediately to avoid any inconvenience and enjoy
our uninterrupted services
l Tentative meter reading date for your AUG-23 bill is 21/08/2023
6000/H02/6062-218/021/028
D554/A554/B255/S17/R554
CONSOLIDATED STAMP DUTY PAID BY ORDER NO. LOA/CSD/72/2023/ Validity Period Dt. 01/07/2023 to Dt. 31/03/2025 /2955 DT. 20 JUN 2023 E.&O.E.
HOW YOUR BILL WAS CALCULATED
f. Adjustments 0.00 Address: Adani Electricity, Devidas Lane, Off SVP Road, Near Devidas Lane
(B) Net other charges in current bill (Sum of a to f) 2.90Cr Telephone Exchange, Borivali West, Mumbai 400 103
Your security deposit (SD) with us r 70.96 Address: Adani Corporate House, Shantigram, Near Vaishno Devi Circle,
S. G. Highway, Khodiyar Ahmedabad, Gujarat, India-382421
Your unpaid security deposit (SD) r 710.00
CIN: U74999GJ2008PLC107256
PAN: AADCD0086F
As per Electricity Supply Code, you can also opt for your own meter (adhering to BIS standars)
GSTIN: 27AADCD0086F1ZW
YOUR TARIFF STRUCTURE (EFFECTIVE FROM 01.04.2023 ) r
0 - 100 85.00 3.45 2.21 0.00 l Get 7% interest on VDS (reducing balance)
l Rs. 10/-discount per month if you opt for Paperless E-Bill. No hard
101 - 300 125.00 5.55 2.21 0.00
copy will be generated. Log on to our website
301 - 500 125.00 7.45 2.21 0.00 (www.adanielectricity.com) for more details.
>500 150.00 8.55 2.21 0.00 l As per MERC, Interest on Security Deposit is at the bank rate declared by
RBI as on 1st April of the financial year. For FY 2023-24. it is 4.25%
Above fixed charges are for single phase connections. Fixed charge of Rs.150 per month will be levied on residential
consumers availing 3 phase supply. Additional Fixed Charge of Rs. 150 per 10 kW load or part thereof above 10kW load
shall be payable.,Temporary supply consumers shall pay 1.5 times the Fixed Charges applicable for this category. l Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2016/
CR[1]252/Energy-1 of 21.10-2016 ELD-2020/CR-34/Energy-1 of
Bill Days Base Days Total Units 1st Slab 2nd Slab 3rd Slab 4th Slab 14.08.2020. Tax on Sale of Electricity as per Govt. of Maharashtra
l For Cheque payments: Date of realization of cheque or 3 days from submission of cheque (whichever is earlier) shall be deemed to be the date of receipt of payment (subject to realization)
l cheque should be Account payee of local clearing and not post-dated l Mention A/C no and respective amount on back of cheque while making multiple bill payments by
single cheque
l Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.153129900