0% found this document useful (0 votes)
14 views2 pages

Dropped Obj-3

dropped object
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
14 views2 pages

Dropped Obj-3

dropped object
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
XVII-2.1.2 UAP Platform LUAP-2 plat from have one pedestal crane, it is assumed the crane can handle loads up to 20MT, the crane hhas a boom length of 25 meters and the pedestal height above the main deck is 9 meters. Figure 5 UAP-2 Crane Top View XVIL2.1.3 GP/GI Platforms Both platforms don't have cranes, lifting operations from boats will depend on the on-boat cranes and lifting arrangements like mono rails installed at the platforms. There is no information currently available for lftings on GP/GI platform, hence itis not included in this report and shall be carried out during EPC stage. ASRS TPES XVII.3 Frequency Analysis Data XVII.3.1 OGP Data OGP provided the following data for dropped objects based on the following categories for fixed platforms Eko Installation | Sea Vessel 100te Maincrane «9.3.x 10% OF oF Driling Derrick | O* oF oF Other Device 61x10" oF Oo all Main crane 10x05 (28x10 64x 10% Driling Derrick 9.6x10% 12%107 61x10" Other Device 5.7 x10 20x10 58x 107 Total All 14x 10% [88x 107 | 16x 10* = In both of the above tables, either there are no recorded incidents, or the incident Is not credible XVII.3.2 Dropped Objects Tables ‘The following sections list the estimated dropped objects, their weights, shape, dimensions and frequency of lifts of those objects as per the reference document ADI11-WP-501-5-02513 Rev 1, XVIL3.2.1 CDCP Platform The table below lists the items to be lifted with their expected frequency per year at CDCP platform. AS discussed, those are assumed as per AD111-WP-501-S-02513 Rev 1. The dimensions of those objects are estimated in this report as it was not included in the reference document. Dimensions are estimated only for CDCP platform to estimate the frequency of dropped object into the sea that could impact the sub-sea pipeline. ‘Table 3 Estimated Lifts Per Annum at CDCP. Deseri Try Weight (Ka) rT (Handling / Year) Injection Turbine Rotor 0.2, 2000.00 ‘Compressor Gas Generator | 0.33 3000.00 2 2 UP Compressor | 0.33 1000.00 6 3 LP Compressor 0.1 5000.00, 5 3 Bundle HP Compressor 0.33 1400.00 7 3 HP Compressor 0.1 5000.00, 4 2 Bundle Gearbox 033 5000.00 a 2 Injection Turbine Rotor 0.2, 2000.00, 2 1 Compressor SSSR INT PET