Case Study Instructions
Case Study Instructions
Topology
Addressing Table
Device Name Interface/Default Gateway IP address/prefix
S0/1/1 209.165.200.1/30
R1 G0/0 192.168.0.113/29
[[R1N ame]
[[R1N ame]]G0/0
S0/1/0 172.10.0.157/30
S0/1/1 209.165.200.2/30
R2 G0/0.10 192.168.0.65/27
[[R2N ame]]
G0/0.20 192.168.0.1/26
G0/0.99 192.168.0.97/29
G0/1 192.168.0.115/29
R3 G0/0 192.168.0.105/29
[[R3N ame]]
G0/1 192.168.0.116/29
Page 1 of 7
[[R4N ame]]
S0/1/1 172.10.0.150/30
[[R4N ame]]
S0/0/0 172.10.0.154/30
R5 G0/0 172.10.0.129/28
[[R5N ame]]
S0/1/0 172.10.0.145/30
[[R5N ame]]
S0/1/1 172.10.0.153/30
R6 G0/0 172.10.0.1/25
[[R6N ame]]
G0/1
[[R6N ame]]
S0/1/0 172.10.0.146/30
[[R6N ame]]
S0/1/1 172.10.0.149/30
Introduction
Instructions
• HQ LAN-C: 10 hosts
Note: WAN links should be considered when you design your IP addressing. WAN links between Branch and HQ
can use either Branch or HQ’s address range. Wireless Router uses static IP address for the Internet port to R6.
Note: Follow the WLAN part for the HQ LAN-E addresses design.
c. Assign the first valid host address in each subnet to the Default Gateway.
d. Assign the 2nd valid host address in each subnet to the Host PC or Switch.
e. Some IP addresses that are pre-defined or marked as DHCP. Enter the IP addresses in your design to
blanks the IP address table above.
Note: Some interfaces should be changed to obtain IP address from DHCP after implementing DHCP. e.
Disable DNS lookup on the routers.
c. Assign access ports to VLAN 10 and 20, design your own VLAN and interfaces mapping. Describe your
design in your report.
Configure static NAT to translate the address of the Host D on HQ LAN D to the External Host using the
public address 209.165.200.228. Verify that the translations are occurring.
Configure the Internet port of the Wireless Router following the IP addresses designed in Part 1.
a. Use the DHCP pool 192.168.1.0/24, excluding the first 5 host addresses.
b. Use the first valid host address as the Default Gateway.
c. Set the maximum number of users as 100.
Report:
Report should include the following sections:
• Problem Statement
• Project Task Allocation: Task allocation for each member in the group
• Project Weekly schedule and completion: Project plan (weekly) and completion in each week • Project Design
and Implementation: Design ideas and considerations, details in your implementations • Discussion and
Troubleshooting: Problems that you have encountered in the project and the solutions you used to solve them
Marking criteria:
Criteria Pts:10