Directional Drilling
Directional Drilling
Directional Drilling
INPUT DATA
N ft
E ft
HORIZONTAL DEPARTURE TARGET (x3) 2655 ft
TVD TARGET (D3) 9650 ft
KOP (D1) = MD KOP 1600 ft
BUR 2 o / 100
OUTPUT DATA
r1 2,864.79 ft
θ 19.35 o r1 > x3
Ω 20.84 o
MD I TVD H
Description
(ft) o
(ft) (ft)
SURFACE 0 0 0 0
KOP 1,600.00 0 1,600.00 0
BUILD UP SECTION 1,915.64 6.31 1,915.00 17.37
EOB 2,567.34 19.35 2,549.06 161.77
TANGENT SECTION 7,935.41 19.35 7,614.00 1,940.14
TARGET 10,093.26 19.35 9,650.00 2,655.00
ft
BUILD - HOLD - DROP TRAJECTORY
INPUT DATA
N 900 ft
E 600 ft
HORIZONTAL DEPARTURE TARGET(x4=x5) 1081.6654 ft
TVD TARGET (D5=D4) 10000 ft
TVD EOD (D4) 10000 ft
TVD KOP (D1) = MD KOP 2700 ft
BUR1 1 o
/ 100
BUR2 0.75 o
/ 100
OUTPUT DATA
r1 5,729.58 ft
r1 > x3
r2 7,639.44 ft
r1+r2 13,369.02 ft
r1+r2 > x4
θ 10.01 o
MD I TVD H
Description
(ft) o
(ft) (ft)
SURFACE 0 0 0 0
KOP 2,700.00 0 2,700.00 0
BUILD UP SECTION 3,500.00 8.00 3,497.40 55.76
EOB 3,700.80 10.01 3,695.72 87.18
TANGENT SECTION 8,000.00 10.01 7,929.50 834.32
EOT 8,754.35 10.01 8,672.37 965.42
DROP SECTION 8,000.00 15.67 7,937.17 797.89
EOD (TARGET) 10,088.75 0.00 10,000.00 1,081.67
ft
ft
BUILD - HOLD - DROP TRAJECTORY
INPUT DATA
N 1311 ft
E 1511 ft
HORIZONTAL DEPARTURE TARGET(x4=x5) 2000.4604 ft
TVD TARGET (D5) 8100 ft
TVD EOD (D4) 8000 ft
TVD KOP (D1) = MD KOP 2100 ft
BUR1 1 o
/ 100
BUR2 2 o
/ 100
OUTPUT DATA
r1 5,729.58 ft
r1 > x3
r2 2,864.79 ft
r1+r2 8,594.37 ft
r1+r2 > x4
θ 28.07 o
MD I TVD H
Description
(ft) o
(ft) (ft)
SURFACE 0 0 0 0
KOP 2,100.00 0 2,100.00 0
BUILD UP SECTION 3,000.00 9.00 2,996.30 70.54
EOB 4,906.55 28.07 4,795.66 673.74
TANGENT SECTION 6,000.00 28.07 5,760.53 1,188.19
EOT 7,010.47 28.07 6,652.17 1,663.59
DROP SECTION 8,000.00 8.27 7,587.70 1,970.64
EOD 8,413.74 0.00 8,000.00 2,000.46
ft
ft
BUILD - HOLD - DROP - VERTICAL TRAJECTORY
INPUT DATA
N 1500 ft
E 1500 ft
HORIZONTAL DEPARTURE TARGET(x4=x5) 2121.3203 ft
TVD TARGET (D5) 8000 ft
TVD EOD (D4) 6000 ft
TVD KOP (D1) = MD KOP 2000 ft
BUR1 3 o
/ 100
BUR2 2 o
/ 100
OUTPUT DATA
r1 1,909.86 ft
r1 > x3
r2 2,864.79 ft
r1+r2 4,774.65 ft
r1+r2 > x4
θ 50.55 o
MD I TVD H
Description
(ft) o
(ft) (ft)
SURFACE 0 0 0 0
KOP 2,000.00 0 2,000.00 0
BUILD UP SECTION 3,000.00 30.00 2,954.93 255.87
EOB 3,684.98 50.55 3,474.74 696.31
TANGENT SECTION 4,000.00 50.55 3,674.91 939.56
EOT 4,177.81 50.55 3,787.89 1,076.86
DROP SECTION 5,000.00 34.11 4,393.66 1,628.60
EOD 6,705.27 0 6,000.00 2,121.32
VERTICAL SECTION 7,000.00 0 6,294.73 2,121.32
TARGET 8,705.27 0 8,000.00 2,121.32
ft
ft
BUILD - HOLD - PARTIAL DROP- HOLD TRAJECTORY
INPUT DATA
N 1500 ft
E 1500 ft
HORIZONTAL DEPARTURE TARGET(x4=x5) 2121.3203 ft
TVD TARGET (D5) 8000 ft
TVD EOD (D4) 6000 ft
TVD KOP (D1) = MD KOP 2000 ft
BUR1 3 o
/ 100
BUR2 2 o
/ 100
OUTPUT DATA
r1 1,909.86 ft
r1 > x3
r2 2,864.79 ft
r1+r2 4,774.65 ft
r1+r2 > x4
θ 50.55 o
MD I TVD H
Description
(ft) o
(ft) (ft)
SURFACE 0 0 0 0
KOP 2,000.00 0 2,000.00 0
BUILD UP SECTION 3,000.00 30.00 2,954.93 255.87
EOB 3,684.98 50.55 3,474.74 696.31
TANGENT SECTION 4,000.00 50.55 3,674.91 939.56
EOT 4,177.81 50.55 3,787.89 1,076.86
DROP SECTION 5,000.00 34.11 4,393.66 1,628.60
TANGENT SECTION 7,000.00 34.11 6,049.67 2,750.03
TARGET 8,705.27 0 8,000.00 2,121.32
ft
ft
X-Y TRAJECTORY
INPUT DATA
MD FROM 8300
MD TO 8400
∆ MD 100 ft
αA 4 o
/ 100
α A-1 3 o
/ 100
εA 22 o
/ 100
ε A-1 21 o
/ 100
OUTPUT CALCULATION
NORTH/SOUTH LENGTH (L) 5.68 ft
EAST/WEST LENGTH (M) 2.24 ft
TVD (D) 99.81 ft
1 2 3 4 5
DESCRIPTION MD TO αA α A-1 εA
KOP 8000
SEGMENT 1 8100 1 0 20
SEGMENT 2 8200 2 1 20
SEGMENT 3 8300 3 2 21
SEGMENT 4 8400 4 3 22
ft
ft
ft
ft
6 7 8 9 10 11 12 13
DEPART
TVD DEPART
ε A-1 MD N (L) E (M) URE
URE
ANGLE
8000 8000 0 0 0 -
20 8100 8,100.00 0.82 0.30 0.87 20.00
20 8200 8,199.96 3.28 1.19 3.49 20.00
20 8300 8,299.87 7.37 2.72 7.85 20.28
21 8400 8,399.68 13.05 4.96 13.96 20.81
METODE TANGETIAL
INPUT DATA
MD STATION 1 8000 ft
MD STATION 2 8400 ft
∆ MD 400 ft
I2 4 o
/ 400
A2 5 o
/ 400
∆ TVD 399.02562 ft
∆H 27.902589 ft
∆E 2.4318709 ft
∆N 27.796412 ft
METODE BALANCED TANGETIAL
INPUT DATA
MD STATION 1 8000 ft
MD STATION 2 8400 ft
∆ MD 400 ft
I2 4 o
/ 400
I1 5 o
/ 400
A2 4 o
/ 400
A1 5 o
/ 400
∆ D1 17.431149 ft
∆ D2 13.951295 ft
∆ D1 + ∆ D2 31.382443 ft
∆ VD1 199.23894 ft
∆ VD2 199.51281 ft
∆ VD1 + ∆ VD2 398.75175 ft
∆N 31.282128 ft
∆E 2.4924178 ft
METODE ANGLE AVERAGING
INPUT DATA
MD STATION 1 8000 ft
MD STATION 2 8400 ft
∆ MD 400 ft
I2 4 o
/ 400
I1 5 o
/ 400
A2 4 o
/ 400
A1 5 o
/ 400
∆D 31.383638 ft
∆ VD 398.76693 ft
∆E 2.4623319 ft
∆N 31.286893 ft
SURVEY DATA VERTICAL DEPTH
INCLIN. COURSE
MD ANGLE DIRECTION LENGTH
A B C D
7100 0 0 100
7200 10.1 S68W 100
7300 13.4 S65W 100
7400 16.3 S57W 100
7500 19.6 S61W 100
ft
ft
ft
ft
ft
ft
E d G H ε K L M N
0 7,100.00 7,100.00 7100 0 0 0 0 0
5.05 99.61 7,199.61 8.80 248 248 -3.30 -8.16 -3.30
11.75 97.90 7,297.52 20.36 245 246.5 -8.12 -18.68 -11.42
14.85 96.66 7,394.18 25.63 237 241 -12.43 -22.42 -23.84
17.95 95.13 7,489.31 30.82 241 239 -15.87 -26.42 -39.72
ANGETIAL
Departure Final Direction
(N-E)
0.00 N 0 E
99.98 N 1 E
499.63 N 3 E
998.95 N 5 E
1,997.56 N 7 E
2,996.66 N 8 E
3,996.02 N 9 E
TOTAL
TOTAL COORDINATE DEPARTUR DEPARTURE ANGLE
E
(N^2+O^2)
Σ(M) ^0.5 ATAN(O/N)
O P Q
0 0.00 0
-8.16 8.80 S 68 W
-26.84 29.16 S 67 W
-49.25 54.72 S 64 W
-75.67 85.46 S 62 W
BHA - TYPE 2
INPUT DATA
DRILLCOLLAR SPECIFICATION
OD 4 in 4 in 4 in
L DC 3 ft 6 ft 9 ft
STABILIZER
OD 8.25 in in in
L STAB 3 ft
BENT SUB
ft ft B '=α . ( B+CC )
degree 1 o
1.5 o
2 o 57 . 3 S 1
L BS 1 ft 1 ft 1 ft B1 =
24
STEERABLE PDM
OD 4 in in in 57 . 3 S 2
L SPDM 7 ft ft ft B2 =
24
BIT
OD 8.5 in in in Φ=B '−B 1 +
L B 0.5 ft ft ft
BUR (DESIGN) 9 o/100ft 200 Φ
TOLERANSI 0.1 o/100ft BUR=
L1 + L
α X Y Z A B C
1.5 0 0 0 2 2 9
1.5 3 0 0 5 2 9
1.5 3 3 0 5 5 9
1.5 3 0 3 5 2 12
1.5 3 0 6 5 2 15
1.5 3 0 9 5 2 18
1.5 3 0 12 5 2 21
1.5 6 0 9 8 2 18
1.5 9 0 6 11 2 15
2 3 0 0 5 2 9
2 3 3 9 5 5 18
2 3 3 12 5 5 21
2 6 3 12 8 5 21
S1 =Dhole – Dstab-1
S2 = Dhole – Dstab-2
B '=α . ( B+CC )
57 . 3 S 1
B1 =
24 ( )
1 1
+
L1 L2
57 . 3 S 2 1
B2 =
24 L2( )
Φ=B '−B 1 + B2
200 Φ
BUR=
L1 + L2
TRIAL BHA COMBINATION
S1 S2 L1 L2 B' B1 B2 Φ BUR
0.25 0.25 2 11 1.23 0.35 0.05 0.93 14.29
0.25 0.25 5 11 1.23 0.17 0.05 1.11 13.85
0.25 0.25 5 14 0.96 0.16 0.04 0.84 8.89
0.25 0.25 5 14 1.29 0.16 0.04 1.17 12.28
0.25 0.25 5 17 1.32 0.15 0.04 1.20 10.95
0.25 0.25 5 20 1.35 0.15 0.03 1.23 9.85
0.25 0.25 5 23 1.37 0.15 0.03 1.25 8.93
0.25 0.25 8 20 1.35 0.10 0.03 1.28 9.11
0.25 0.25 11 17 1.32 0.09 0.04 1.27 9.07
0.25 0.25 5 11 1.64 0.17 0.05 1.52 18.96
0.25 0.25 5 23 1.57 0.15 0.03 1.45 10.33
0.25 0.25 5 26 1.62 0.14 0.02 1.50 9.65
0.25 0.25 8 26 1.62 0.10 0.02 1.54 9.06
HASIL PENGECEKAN
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA TIDAK DAPAT DIPAKAI
DESIGN BHA DAPAT DIPAKAI