968 Filed Data
968 Filed Data
Name of the Soil testing Firm: CDD SOIL TEST Working date: 21.01.2017.
NOTE: DURING PREPARING The “Sub-soil investigation report” the geo-technical engineering
Should be cheek the above-mentioned Visual Soil identification/plasticity/etc.
Check-List:
Spilt-Spoon:`
Thin-Walled Tube:
Final Depth of Boring : (-) 50’-0”
:…………………………………………………………………………………...
Ground water Level: (-) 13’–0”
:…………………………………………………………………………………...
SPT Values:
…………………………………………………………………………………...
Field Work Done By : CDD SOIL TEST
Supervision Geo-technical Engineer: Md. Amirul Islam.
:…………………………………………………………………………………...
Any Special futures
:…………………………………………………………………………………...
Client’s Sign
Diller’s Sign: Jahagir Supervision Geo-Technical Engineer Sign:
A copy of this Field-Data-Recording-Sheet must be handed-over to the client, after complying
each borehole.
FIELD DATA RECORDING SHEET
(SPT & DISTURBED/UD SAMPLING)
BORE HOLE NO – 02
Scheme: Construction of 06(Six) Storied Commercial Building. Location: Bangalipur, Babupara Saidpur.
Boring started: 12.45 pm. Boring Complete: 2.00.pm
Name of the Soil testing Firm: CDD SOIL TEST Working date: 21.01.2017.
NOTE: DURING PREPARING The “Sub-soil investigation report” the geo-technical engineering
Should be cheek the above-mentioned Visual Soil identification/plasticity/etc.
Check-List:
Spilt-Spoon:`
Thin-Walled Tube:
Final Depth of Boring : (-) 60’-0”
:…………………………………………………………………………………...
Ground water Level: (-) 13’–0”
:…………………………………………………………………………………...
SPT Values:
…………………………………………………………………………………...
Field Work Done By : CDD SOIL TEST
Supervision Geo-technical Engineer: Md. Amirul Islam.
:…………………………………………………………………………………...
Any Special futures
:…………………………………………………………………………………...
Client’s Sign
Diller’s Sign: Jahagir Supervision Geo-Technical Engineer Sign:
A copy of this Field-Data-Recording-Sheet must be handed-over to the client, after complying
each borehole.
FIELD DATA RECORDING SHEET
(SPT & DISTURBED/UD SAMPLING)
BORE HOLE NO – 03
Scheme: Construction of 06(Six) Storied Commercial Building. Location: Bangalipur, Babupara Saidpur.
Boring started: 2.30 pm. Boring Complete: 3.30.pm
Name of the Soil testing Firm: CDD SOIL TEST Working date: 21.01.2017.
NOTE: DURING PREPARING The “Sub-soil investigation report” the geo-technical engineering
Should be cheek the above-mentioned Visual Soil identification/plasticity/etc.
Check-List:
Spilt-Spoon:`
Thin-Walled Tube:
Final Depth of Boring : (-) 50’-0”
:…………………………………………………………………………………...
Ground water Level: (-) 13’–0”
:…………………………………………………………………………………...
SPT Values:
…………………………………………………………………………………...
Field Work Done By : CDD SOIL TEST
Supervision Geo-technical Engineer: Md. Amirul Islam.
:…………………………………………………………………………………...
Any Special futures
:…………………………………………………………………………………...
Client’s Sign
Diller’s Sign: Jahagir Supervision Geo-Technical Engineer Sign:
A copy of this Field-Data-Recording-Sheet must be handed-over to the client, after complying
each borehole.
FIELD DATA RECORDING SHEET
(SPT & DISTURBED/UD SAMPLING)
BORE HOLE NO – 04
Scheme: Construction of 06(Six) Storied Commercial Building. Location: Bangalipur, Babupara Saidpur.
Boring started: 3.40 pm. Boring Complete: 5.00.pm
Name of the Soil testing Firm: CDD SOIL TEST Working date: 21.01.2017.
NOTE: DURING PREPARING The “Sub-soil investigation report” the geo-technical engineering
Should be cheek the above-mentioned Visual Soil identification/plasticity/etc.
Check-List:
Spilt-Spoon:`
Thin-Walled Tube:
Final Depth of Boring : (-) 50’-0”
:…………………………………………………………………………………...
Ground water Level: (-) 13’–0”
:…………………………………………………………………………………...
SPT Values:
…………………………………………………………………………………...
Field Work Done By : CDD SOIL TEST
Supervision Geo-technical Engineer: Md. Amirul Islam.
:…………………………………………………………………………………...
Any Special futures
:…………………………………………………………………………………...
Client’s Sign
Diller’s Sign: Jahagir Supervision Geo-Technical Engineer Sign:
A copy of this Field-Data-Recording-Sheet must be handed-over to the client, after complying
each borehole.