Hazard Identification and Risk Assessment

Title: SCAFFOLD ERECTION AND DISMANTLING.


Project: INDIAN 5 VIZAG Date: 25.11.2019
Contractor: SAPTAGIRI CONSTRUCTIONS. Revision: 0

No. Hazard Assessment Controls Assessment


(no controls) (with controls)
P S R P S R
1 Hazard 1
Pre work start. - Inadequate Planning 4 3 A - Incorporated procedures in Permit To Work System shall be 1 3 D
- Noncompliance with applied to ensure that necessary communication takes place
working Procedures. and hazards are controlled.
- All mandatory and job specific PPE’S should be used.
- Working without proper
PPE. - Trained and Certified scaffolders to be deployed before
- Untrained personnel. starting the particular job.
2 Hazard 2
Loading & - Fall of material on 3 3 B - Prevent people who are not involved from being entering 1 3 D
Unloading of persons. into loading and unloading area.
scaffold - Working over top of - Maximum height of load should not exceed the vehicle
materials trailers and tractors. cabin.
manually. - Struck by moving vehicle. - Scaffold pipe projections should not come out of vehicle
- Manual handling. cabin.
- Slip, trip and fall of - Usage of buddy system for handling the material.
persons. - Securing the load before movement from one location to
- Finger crush, cut and another.
- Have proper access and egress into tractors & trailers.
scratch injury.
Hazard Identification and Risk Assessment
Title: SCAFFOLD ERECTION AND DISMANTLING.
Project: INDIAN 5 VIZAG Date: 25.11.2019
Contractor: SAPTAGIRI CONSTRUCTIONS. Revision: 0

- Wherever possible work from ground and if this was not


possible use proper access and egress to vehicles and
trailers.
- Trailers and tractor beds should be free from grease and oil
surface.
- Workers are prohibited to be carried on trailer bed while
carrying load.
- Deployment of banksman for vehicle movement.
3 Hazard 3
3 Erecting - Improper planning and 3 3 B - Use of full body safety harness with 100% tie-off to be done. 1 3 D
scaffolding execution. - Certified & authorized scaffolders should be deployed.
- Fall or collapse of - Work to be carried out under close supervision.
scaffold. - Work area to be cordoned with soft barricading and TBT
- Physical injury to body awareness to be given among the workers about the work
parts. place hazard & it’s measures.
- Fall hazard due to work at - Full body safety harness with double lanyard to be worn,
height. both the hook to be anchored with fix structure during job,
- Substandard scaffold while movement from one platform to another, at least one
material usage causing hook to be anchored.
property damage. - Appropriate access ladder to be provided during erection
- unprotected platform. phase.
- Only medically fit and trained manpower to be deputed.
Hazard Identification and Risk Assessment
Title: SCAFFOLD ERECTION AND DISMANTLING.
Project: INDIAN 5 VIZAG Date: 25.11.2019
Contractor: SAPTAGIRI CONSTRUCTIONS. Revision: 0

- All PPE to be inspected before used.


- Red tag to be displayed till the completion & final inspection
of scaffolding.
- While shifting the scaffold materials at height ensure no
surrounding pipes, equipment to be touched due to hit by
scaffold pipe.
- Scaffold material to be inspected before use. All scaffold
materials shall be used as per standard. Inspect visually all
scaffold materials for stability and anchoring with
permanent structures.
- Do not overload the scaffold.
- Below area to be cordoned to restrict unauthorized entry.
- Ladders shall extend about 1 m above landing for easy
access.
- Access ladder shall not exceed than 6 m.
- Remove loose materials immediately & Carry the tools in a
tool-kit only.
4 Hazard 4
Dismantling of - Slip, trip & fall hazard. 3 3 B - No overreaching permitted while dismantling. 1 3 D
- Fall from height, hit by - Three point contacts should be maintained while
scaffolding.
the object, failure of tool. ascending/descending
- Excluding scaffolders, no other personnel allowed on the
Hazard Identification and Risk Assessment
Title: SCAFFOLD ERECTION AND DISMANTLING.
Project: INDIAN 5 VIZAG Date: 25.11.2019
Contractor: SAPTAGIRI CONSTRUCTIONS. Revision: 0

scaffold.
- Red tag to be displayed before start of the dismantling job.
- Secure all hand tools/ materials at height.
- full body safety harness to be worn while working at height
and to be anchored properly.
- During dismantling work, work to be carried out minimum
one grating platform.
- Dismantled materials should not be kept on the scaffold and
to be lowered immediately.
- Throwing of materials is not allowed.
- Work to be carried out under proper supervision.
- Ensure that no scaffolding materials (i.e. grating, pipe etc..)
to be touched to any adjacent live panel/ equipment.

Severity (S) Risk level (R) P/S S1 S2 S3 S4

Probability (P)
1 = Very Low 1 = Light P1 - - D C
2 = Low 2 = Medium P2 - D C B B - A = Risk reduction urgently necessary
3 = Medium 3 = Severe P3 D C B A D - C = Risk needs to be reduced
4 = High 4 = Extreme P4 D B A A -- = Risk is acceptable