0% found this document useful (0 votes)
36 views124 pages

Unity Pro

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views124 pages

Unity Pro

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 124

Unity Pro XL Learning

Schneider Electric Thailand


Automation Solution

1
Choose “Unity Pro XL”

2
Program active

3
Create new PLC program

4
Choose PLC type

5
Project creating

6
Choose Hardware config (double click)

7
Existing PLC with blank I/O

8
Double click slot No. 1

9
Choose 16 Input module

10
Choose another slot

11
Choose 16 Output module

12
Click to close Hardware catalog

13
Start MAST task (click)

14
Select section

15
Right click to create new section

16
Choose LD ( Ladder )

17
Apply section name

18
Click OK

19
New section programming area

20
Click to close PLC bus

21
Click to close Project Browser

22
Click to enlarge Programming area

23
Ready to programming

24
Choose NO contact ---| |---

25
Click to place contact on any location

26
Choose NC contact ---|/|---

27
Choose Output ---( )---

28
Place on any location in 1st row

29
Choose vertical line

30
Connect vertical line

31
Change mouse back to pointer

32
Double click to assign tag

33
Assigned “Start” tag

34
Choose “BOOL”

35
Accept change

36
Assign “Stop” tag

37
Assign “Relay” tag

38
Double click to assign tag

39
Choose existing tag

40
Choose “Relay” tag

41
OK to confirm

42
Analyze project

43
Analyze report

44
Rebuild project

45
Rebuild report

46
Connect to PLC

Simulation Mode

47
PLC status “ program difference “

48
Download program

49
Transfer confirm

50
Transferring

51
Transfer complete

52
Place PLC in “RUN”

53
PLC “ RUN “ Confirm

54
PLC “RUN”

55
Right click on “Start” bit set “1”

56
Start bit active

57
Right click on “Start” bit set “0”

58
Start bit “OFF”

59
Right click on “Stop” bit set “1”

60
Stop bit active

61
Bit status monitor (drag mouse cover monitor bits)

62
Bit monitoring showing up

63
Right click then choose “Table”

64
Animation table show bit status

65
Show multiple windows

66
Monitor both Ladder & Table

67
Choose “Modification”

68
Right click on modify bit, set to “0”

69
Stop bit “Inactive”

70
Select “Start bit” and set value to 1

71
Start bit “Active”->Relay bit

72
Reset Start bit

73
Start bit “Inactive” but Relay still “Active”

74
Set Stop bit

75
Stop bit “Active”->Relay bit “Inactive”

76
Reset Stop bit

77
Stop bit “Inactive”

78
Open Project Browser to create Operator screen

79
Right click to create new screen

80
Apply screen name and click ok

81
Screen area

82
Choose Push Button

83
Place on location

84
Select and right click to Copy Button

85
Right click and paste

86
Drag to desired location

87
Choose Text

88
Place on location

89
Copy text

90
Paste

91
Text Done

92
Double click to config button

93
Choose tag and ok

94
Tag assign done

95
Assign another tag

96
OK

97
Config text with “Relay ON”

98
Choose RED color

99
Choose animated object

100
Choose “Relay” tag

101
Show when bit = “1”

102
Choose Standard display

103
Config Text 2 with “Relay OFF”

104
Choose “Green”

105
Choose animated object

106
Choose “Relay” tag

107
Show when bit = “0”

108
Choose Standard display

109
Rearrange screen

110
Add 1st Button label

111
Add 2nd Button label

112
Operator screen ready to test

113
Start graphic monitor

114
Press “Start”

115
Relay “ON”

116
Press Stop

117
Relay “OFF”

118
Save work

119
Enter file name

120
Finish saving

121
Exit program

122
Confirm to exit

123
Thank you

124

You might also like