Scheduling & Tracking

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views46 pages

Scheduling & Tracking

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 46

Software Engineering

Project Scheduling and Tracking


 Why project scheduling
 Interdependency
• Relation among tasks
• Output of a task may be input of another task
 Assessing progress
 Root causes of late delivery of a software
 Unrealistic deadline
• Established by someone outside the software development group
• Forced to the group
 Changing customer requirements
• Schedule not changed
 Underestimating the effort, resources required
 Unconsidered risks
 Technical difficulties
• Could not be foreseen in advance
 Human difficulties
• Could not be foreseen in advance
 Miscommunication among project staff
• Results in delay
Project Scheduling and Tracking
 Root causes of late delivery of a software
 Failure by project management
• Project is falling behind schedule
• Lack of action to correct the problem
 Basic principles of project scheduling
 Compartmentalization
• Project is compartmentalized into a number of manageable activities and tasks
• Product and process are decomposed
 Interdependency
• Interdependency among each task must be determined
• Sequential
• Parallel
 Time allocation
• Allocating some number of work units
• Assigning start date and completion date
 Effort validation
 Defined responsibilities
• Assigning tasks to specific team members
Project Scheduling and Tracking
 Basic principles of project scheduling
 Defined outcomes
• Work products
 Defined milestones
 Degree of rigor
 Casual
• Process framework activities
• Minimum task set
• Minimized umbrella activities
• Reduced documentation requirements
 Structured
• Process framework activities
• Umbrella activities necessary to ensure high quality
• Streamlined documentation
 Strict
• Full process
• All umbrella activities
 Quick reaction
• Emergency situation
• Only tasks essential to maintain good quality
Project Scheduling and Tracking
 Defining a task network/activity network
 Graphic representation of the task flow for a project
 Depicts major software engineering tasks

Figure 1: A task network for concept development


Project Scheduling and Tracking
 Timeline chart/Gantt chart

Figure 2: An example timeline chart


Project Scheduling and Tracking
 CPM (Critical Path Method) Activity Immediate Duration
 Unique Start (tail) Predecessor(s) (Months)
 Unique End (head) A --- 2
B --- 5
C --- 4
D B 5
E A 7
F A 3
G B 3
H C,D 6
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8
https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months)
A --- 2
B --- 5
A(2)
C --- 4 2

D B 5
E A 7 1 B(5)
3
F A 3
G B 3 C(4) 4
H C,D 6
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months)
A --- 2
B --- 5
A(2)
C --- 4 2

D B 5
E A 7 1 B(5)
3
D(5)
F A 3
G B 3 C(4) 4
H C,D 6
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months)
E(7) 5
A --- 2
B --- 5 F(3)
A(2)
2 6
C --- 4
D B 5
E A 7 1 B(5)
3
D(5)
F A 3
G B 3 C(4) 4
H C,D 6
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months)
E(7) 5
A --- 2
B --- 5 F(3)
A(2)
2 6
C --- 4
D B 5 G(3)

E A 7 1 B(5)
3
D(5)
F A 3
G B 3 C(4) 4
H C,D 6
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months)
E(7) 5
A --- 2
B --- 5 F(3)
A(2)
2 6
C --- 4
D B 5 G(3)

E A 7 1 B(5)
3
D(5) H(6)
F A 3
G B 3 C(4) 4
H C,D 6
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months)
E(7) 5
A --- 2
B --- 5 F(3)
A(2)
2 6
C --- 4
D B 5 G(3)

E A 7 1 3 7
B(5)
D(5) H(6)
F A 3
G B 3 C(4) 4
H C,D 6
I(2)
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months) J(5)
E(7) 5
A --- 2
8
B --- 5 F(3)
A(2)
2 6
C --- 4
D B 5 G(3)

E A 7 1 3 7
B(5)
D(5) H(6)
F A 3
G B 3 C(4) 4
H C,D 6
I(2)
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months) J(5)
E(7) 5
A --- 2
8
B --- 5 F(3) K(4)
A(2)
2 6
C --- 4
D B 5 G(3)

E A 7 1 3 7
B(5)
D(5) H(6)
F A 3
G B 3 C(4) 4
H C,D 6
I(2)
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months) J(5)
E(7) 5
A --- 2
N(8)
8
B --- 5 F(3) K(4)
A(2)
2 6
C --- 4 L(3)
9
D B 5 G(3)

E A 7 1 3 7
B(5)
D(5) H(6)
F A 3 M(12)
G B 3 C(4) 4
H C,D 6
I(2)
I C,D 2
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
Activity Immediate Duration
Predecessor(s) (Months) J(5)
E(7) 5
A --- 2
N(8)
8
B --- 5 F(3) K(4)
A(2)
2 6
C --- 4 L(3)
9
D B 5 G(3)

E A 7 1 3 7
B(5)
D(5) H(6)
F A 3 M(12)
G B 3 C(4) 4
H C,D 6
I(2)
I C,D 2 Figure 3: CPM Network
J E 5
K F,G,H 4
L F,G,H 3
M I 12
N J,K 8 https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path
› Longest distance between start and end J(5)
› Earliest Start time (ES) [forward pass] E(7) 5
 𝐸𝑆𝑗 = 𝑀𝑎𝑥𝑖 (𝐸𝑆𝑖 + 𝐷𝑖𝑗 ) 8
N(8)

› Latest Completion time (LC) [backward pass] A(2) F(3)


6
K(4)
2
 𝐿𝐶𝑖 = 𝑀𝑖𝑛𝑗 (𝐿𝐶𝑗 − 𝐷𝑖𝑗 ) L(3)
9
G(3)
LC 1 3 7
B(5)
ES D(5) H(6)
M(12)

C(4) 4

I(2)
Figure 3: CPM Network

https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path L
› Longest distance between start and end E
J(5) L
› Earliest Start time (ES) [forward pass] E(7) 5
E
L
 𝐸𝑆𝑗 = 𝑀𝑎𝑥𝑖 (𝐸𝑆𝑖 + 𝐷𝑖𝑗 ) E 8
N(8)

› Latest Completion time (LC) [backward pass] A(2) F(3)


6
K(4)
2
 𝐿𝐶𝑖 = 𝑀𝑖𝑛𝑗 (𝐿𝐶𝑗 − 𝐷𝑖𝑗 ) L(3)
9
L
L L E
G(3)
LC E E
L 7
1 B(5)
3
ES E
D(5) H(6) L M(12)
E
C(4) 4
L
I(2)
E
Figure 3: CPM Network

https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path L
› ES for Node 1: 0 E
J(5) L
› ES for Node 2 E(7) 5
E
L
𝐸𝑆 = 𝑀𝑎𝑥 0 + 2 = 2 E 8
N(8)
› ES for Node 3 A(2) F(3) K(4)
2 6
𝐸𝑆 = 𝑀𝑎𝑥 0 + 5 = 5 L(3)
9
L
L L
› ES for Node 4 E
G(3)
E
E

𝐸𝑆 = 𝑀𝑎𝑥 0 + 4,5 + 5 = 10 L 7
1 B(5)
3
E
› ES for Node 5 D(5) H(6) L M(12)
𝐸𝑆 = 9 E
› ES for Node 6 C(4) 4
𝐸𝑆 = 𝑀𝑎𝑥 3 + 2,3 + 5,6 + 10 = 16 L
I(2)
› ES for Node 7 E
Figure 3: CPM Network
𝐸𝑆 = 12
› ES for Node 8
𝐸𝑆 = 𝑀𝑎𝑥 5 + 9,4 + 16 = 20
› ES for Node 9
𝐸𝑆 = 𝑀𝑎𝑥 8 + 20,3 + 16,12 + 12 = 28
https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path L
› ES for Node 1: 0 9
J(5) L
› ES for Node 2 E(7) 5
20
L
𝐸𝑆 = 𝑀𝑎𝑥 0 + 2 = 2 2 8
N(8)
› ES for Node 3 A(2) F(3) K(4)
2 6
𝐸𝑆 = 𝑀𝑎𝑥 0 + 5 = 5 L(3)
9
L
L L
› ES for Node 4 5
G(3)
16
28

𝐸𝑆 = 𝑀𝑎𝑥 0 + 4,5 + 5 = 10 L 7
1 B(5)
3
0
› ES for Node 5 D(5) H(6) L M(12)
𝐸𝑆 = 9 12
› ES for Node 6 C(4) 4
𝐸𝑆 = 𝑀𝑎𝑥 3 + 2,3 + 5,6 + 10 = 16 L
I(2)
› ES for Node 7 10
Figure 3: CPM Network
𝐸𝑆 = 12
› ES for Node 8
𝐸𝑆 = 𝑀𝑎𝑥 5 + 9,4 + 16 = 20
› ES for Node 9
𝐸𝑆 = 𝑀𝑎𝑥 8 + 20,3 + 16,12 + 12 = 28
https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path L
› LC for Node 9: 28 9
J(5) L
› LC for Node 8 E(7) 5
20
L
LC = 𝑀𝑖𝑛 28 − 8 = 20 2 8
N(8)
› LC for Node 7 A(2) F(3) K(4)
2 6
LC = 16 L(3)
9
L
L L
› LC for Node 6 5
G(3)
16
28

LC = 𝑀𝑖𝑛 20 − 4,28 − 3 = 16 L 7
1 B(5)
3
0
› LC for Node 5 D(5) H(6) L M(12)
LC = 15 12
› LC for Node 4 C(4) 4
LC = 𝑀𝑖𝑛 16 − 6,16 − 2 = 10 L
I(2)
› LC for Node 3 10
Figure 3: CPM Network
LC = 𝑀𝑖𝑛 16 − 3,10 − 5 = 5
› LC for Node 2
LC = 𝑀𝑖𝑛 15 − 7,16 − 3 = 8
› LC for Node 1
LC = 𝑀𝑖𝑛 8 − 2,5 − 5,10 − 4 = 0
https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path 15
› LC for Node 9: 28 9
J(5) 20
› LC for Node 8 E(7) 5
20
8
LC = 𝑀𝑖𝑛 28 − 8 = 20 2 8
N(8)
› LC for Node 7 A(2) F(3) K(4)
2 6
LC = 16 L(3)
9
28
5 16
› LC for Node 6 5
G(3)
16
28

LC = 𝑀𝑖𝑛 20 − 4,28 − 3 = 16 0 7
1 B(5)
3
0
› LC for Node 5 D(5) H(6) 16 M(12)
LC = 15 12
› LC for Node 4 C(4) 4
LC = 𝑀𝑖𝑛 16 − 6,16 − 2 = 10 10
I(2)
› LC for Node 3 10
Figure 3: CPM Network
LC = 𝑀𝑖𝑛 16 − 3,10 − 5 = 5
› LC for Node 2
LC = 𝑀𝑖𝑛 15 − 7,16 − 3 = 8
› LC for Node 1
LC = 𝑀𝑖𝑛 8 − 2,5 − 5,10 − 4 = 0
https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Critical Path 15
› 𝐸𝑆𝑖 = 𝐿𝐶𝑖 9
J(5) 20
› 𝐸𝑆𝑗 = 𝐿𝐶𝑗 E(7) 5
20
8
› 𝐸𝑆𝑗 − 𝐸𝑆𝑖 = 𝐿𝐶𝑗 − 𝐿𝐶𝑖 = 𝐷𝑖𝑗 2 8
N(8)

A(2) F(3) K(4)


2 6
› 1-3 5 16
L(3)
9
28
28
› 3-4 5
G(3)
16
0
› 4-6 1 B(5)
3 7
0
› 6-8 D(5) H(6) 16 M(12)
› 8-9 12
C(4) 4
› Path 10
I(2)
10
› 1-3-4-6-8-9 Figure 3: CPM Network
› B-D-H-K-N

› Distance (time)
› 5+5+6+4+8=28 months [expected project completion time]

https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Total floats 15
› 𝑇𝐹𝑖𝑗 = 𝐿𝐶𝑗 − 𝐸𝑆𝑖 − 𝐷𝑖𝑗 9
J(5) 20
 Free floats 8
E(7) 5
20
› 𝐹𝐹𝑖𝑗 = 𝐸𝑆𝑗 − 𝐸𝑆𝑖 − 𝐷𝑖𝑗 2 8
N(8)

A(2) F(3) K(4)


2 6 L(3) 28
Activity Duration Total Free Floats 5 16 9
G(3) 28
(Months) Floats 5 16
0 7
A 2 6 (8-0-2) 0 (2-0-2) 1 B(5)
3
0
D(5) H(6)
B 5 0 (5-0-5) 0 (5-0-5) 16 M(12)
12
C 4 6 (10-0-4) 6 (10-0-4) C(4) 4
D 5 0 (16-10-6) 0 (16-10-6) 10
I(2)
10
E 7 6 (15-2-7) 0 (9-2-7) Figure 3: CPM Network
F 3 11 (16-2-3) 11 (16-2-3)
G 3 8 (16-5-3) 8 (16-5-3)

https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
 Total floats 15
› 𝑇𝐹𝑖𝑗 = 𝐿𝐶𝑗 − 𝐸𝑆𝑖 − 𝐷𝑖𝑗 9
J(5) 20
 Free floats 8
E(7) 5
20
› 𝐹𝐹𝑖𝑗 = 𝐸𝑆𝑗 − 𝐸𝑆𝑖 − 𝐷𝑖𝑗 2 8
N(8)

A(2) F(3) K(4)


2 6 L(3) 28
Activity Duration Total Free Floats 5 16 9
G(3) 28
(Months) Floats 5 16
0 7
H 6 0 (16-10-6) 0 (16-10-6) 1 B(5)
3
0
D(5) H(6)
I 2 4 (16-10-2) 0 (12-10-2) 16 M(12)
12
J 5 6 (20-9-5) 6 (20-9-5) C(4) 4
K 4 0 (20-16-4) 0 (20-16-4) 10
I(2)
10
L 3 9 (28-16-3) 9 (28-16-3) Figure 3: CPM Network
M 12 4 (28-12-12) 4 (28-12-12)
N 8 0 (28-20-8) 0 (28-20-8)

https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 CPM (Critical Path Method)
15
Activity Duration Total F. Free F.
9
J(5) 20
A 2 6 (8-0-2) 0 (2-0-2) E(7) 5
8 20
B 5 0 (5-0-5) 0 (5-0-5) N(8)
2 8
C 4 6 (10-0-4) 6 (10-0-4) A(2) F(3) K(4)
2 6 L(3) 28
D 5 0 (16-10-6) 0 (16-10-6) 5 16 9
G(3) 28
E 7 6 (15-2-7) 0 (9-2-7) 5 16
0 7
1 B(5)
3
F 3 11 (16-2-3) 11 (16-2-3) 0
D(5) H(6) 16 M(12)
G 3 8 (16-5-3) 8 (16-5-3) 12
C(4) 4
H 6 0 (16-10-6) 0 (16-10-6)
10
I 2 4 (16-10-2) 0 (12-10-2) 10
I(2)

J 5 6 (20-9-5) 6 (20-9-5) Figure 3: CPM Network


K 4 0 (20-16-4) 0 (20-16-4)
L 3 9 (28-16-3) 9 (28-16-3)
M 12 4 (28-12-12) 4 (28-12-12)
N 8 0 (28-20-8) 0 (28-20-8)
https://www.youtube.com/watch?v=vUMGvpsb8dc&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A
2
B --- 1 3 5
C --- 1 4 7
D A 1 2 3 1 B
3

E B 1 2 9
F C 1 5 9 C 4
G C 2 2 8
H E,F 4 4 10
I D 2 5 8
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A D
2 5
B --- 1 3 5
C --- 1 4 7
D A 1 2 3 1 B
3

E B 1 2 9
F C 1 5 9 C 4
G C 2 2 8
H E,F 4 4 10
I D 2 5 8
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A D
2 5
B --- 1 3 5
C --- 1 4 7
E
1 3 6
D A 1 2 3 B
E B 1 2 9
F C 1 5 9 C 4
G C 2 2 8
H E,F 4 4 10
I D 2 5 8
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A D
2 5
B --- 1 3 5
C --- 1 4 7
E
1 3 6
D A 1 2 3 B
E B 1 2 9
F C 1 5 9 C 4
F
G C 2 2 8
H E,F 4 4 10
I D 2 5 8
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A D
2 5
B --- 1 3 5
C --- 1 4 7
E
1 3 6
D A 1 2 3 B
E B 1 2 9
F C 1 5 9 C 4
F
G C 2 2 8
7
H E,F 4 4 10 G
I D 2 5 8
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A D
2 5
B --- 1 3 5
C --- 1 4 7
E
1 3 6
D A 1 2 3 B
E B 1 2 9
H
F C 1 5 9 C 4
F
G C 2 2 8
7
H E,F 4 4 10 G
I D 2 5 8
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 CPM: Each activity---One estimate
 PERT: Each activity---Three estimates (optimistic, most likely, pessimistic)

Activity Immediate Duration (Months)


Predecessor(s) O M P
A --- 5 6 7 A D
2 5 I
B --- 1 3 5
C --- 1 4 7
E
1 3 6
D A 1 2 3 B
8
E B 1 2 9
H
F C 1 5 9 C 4
F
G C 2 2 8 J
7
H E,F 4 4 10 G
I D 2 5 8
Figure 4: Project Network
J H,G 2 2 8

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
𝑡0 +4𝑡𝑚 +𝑡𝑝
 Mean (expected duration): 𝑡𝑒 =
6
𝑡𝑝 −𝑡0 2
 Variance: 𝜎 2 = ( )
6

Activity Immediate Duration (Months)


Predecessor(s) O M P Mean Variance A D
2 5 I
A --- 5 6 7 6 0.11
B --- 1 3 5 3 0.44 E
1 3 6
C --- 1 4 7 4 1.00 B
8
D A 1 2 3 2 0.11 H
C 4
E B 1 2 9 3 1.78 F
F C 1 5 9 5 1.78 J
7
G C 2 2 8 3 1.00 G

H E,F 4 4 10 5 1.00 Figure 4: Project Network


I D 2 5 8 5 1.00
J H,G 2 2 8 3 1.00
https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
𝑡0 +4𝑡𝑚 +𝑡𝑝
 Mean (expected duration): 𝑡𝑒 =
6
𝑡𝑝 −𝑡0 2
 Variance: 𝜎 2 = ( )
6

Activity Immediate Duration (Months)


Predecessor(s) O M P Mean Variance A(6) D(2)
2 5 I(5)
A --- 5 6 7 6 0.11
B --- 1 3 5 3 0.44 E(3)
1 3 6
C --- 1 4 7 4 1.00 B(3)
8
D A 1 2 3 2 0.11 H(5)
C(4) 4
E B 1 2 9 3 1.78 F(5)
F C 1 5 9 5 1.78 J(3)
7
G C 2 2 8 3 1.00 G(3)

H E,F 4 4 10 5 1.00 Figure 4: Project Network


I D 2 5 8 5 1.00
J H,G 2 2 8 3 1.00
https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
𝑡0 +4𝑡𝑚 +𝑡𝑝
 Mean (expected duration): 𝑡𝑒 =
6
𝑡𝑝 −𝑡0 2
 Variance: 𝜎 2 = ( )
6

Activity Immediate Duration (Months)


Predecessor(s) O M P Mean Variance A(6) D(2)
2 5 I(5)
A --- 5 6 7 6 0.11
B --- 1 3 5 3 0.44 E(3)
1 3 6
C --- 1 4 7 4 1.00 B(3)
8
D A 1 2 3 2 0.11 H(5)
C(4) 4
E B 1 2 9 3 1.78 F(5)
F C 1 5 9 5 1.78 J(3)
7
G C 2 2 8 3 1.00 G(3)

H E,F 4 4 10 5 1.00 Figure 4: Project Network


I D 2 5 8 5 1.00
J H,G 2 2 8 3 1.00
https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› Longest distance between start and end
› Earliest Start time (ES) [forward pass]
 𝐸𝑆𝑗 = 𝑀𝑎𝑥𝑖 (𝐸𝑆𝑖 + 𝐷𝑖𝑗 )
› Latest Completion time (LC) [backward pass]
D(2)
 𝐿𝐶𝑖 = 𝑀𝑖𝑛𝑗 (𝐿𝐶𝑗 − 𝐷𝑖𝑗 ) A(6)
2 5 I(5)
LC
E(3)
ES 1 3 6
B(3)
8
H(5)
C(4) 4
F(5)
J(3)
7
G(3)

Figure 4: Project Network

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› Longest distance between start and end
› Earliest Start time (ES) [forward pass]
 𝐸𝑆𝑗 = 𝑀𝑎𝑥𝑖 (𝐸𝑆𝑖 + 𝐷𝑖𝑗 ) L L
E E
› Latest Completion time (LC) [backward pass]
D(2)
 𝐿𝐶𝑖 = 𝑀𝑖𝑛𝑗 (𝐿𝐶𝑗 − 𝐷𝑖𝑗 ) A(6)
2 5 I(5)
LC L
L E(3)
ES 1 3 6 E
E B(3)
L L
8
E E
H(5)
C(4) 4
F(5)
L L J(3)
E E 7
G(3)

Figure 4: Project Network

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› ES for Node 1: 0
› ES for Node 2: 6
› ES for Node 3: 3 L L
E E
› ES for Node 4: 4
D(2)
› ES for Node 5: 8 A(6)
2 5 I(5)
› ES for Node 6: 9
› ES for Node 7: 14 L
L E(3)
6 E
› ES for Node 8: 17 E 1 B(3)
3
L L
8
E E
H(5)
C(4) 4
F(5)
L L J(3)
E E 7
G(3)

Figure 4: Project Network

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› ES for Node 1: 0
› ES for Node 2: 6
› ES for Node 3: 3 L L
6 8
› ES for Node 4: 4
D(2)
› ES for Node 5: 8 A(6)
2 5 I(5)
› ES for Node 6: 9
› ES for Node 7: 14 L
L E(3)
6 9
› ES for Node 8: 17 0 1 B(3)
3
L L
8
3 17
H(5)
C(4) 4
F(5)
L L J(3)
4 14 7
G(3)

Figure 4: Project Network

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› LC for Node 8: 17
› LC for Node 7: 14
› LC for Node 6: 9 L L
6 8
› LC for Node 5: 12
D(2)
› LC for Node 4: 4 A(6)
2 5 I(5)
› LC for Node 3: 6
› LC for Node 2: 10 L
L E(3)
6 9
› LC for Node 1: 0 0 1 B(3)
3
L L 8
3 17
H(5)
C(4) 4
F(5)
L L J(3)
4 14 7
G(3)

Figure 4: Project Network

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› LC for Node 8: 17
› LC for Node 7: 14
› LC for Node 6: 9 10 12
6 8
› LC for Node 5: 12
D(2)
› LC for Node 4: 4 A(6)
2 5 I(5)
› LC for Node 3: 6
› LC for Node 2: 10 0 E(3)
9
6 9
› LC for Node 1: 0 0 1 B(3)
3
6 17
8
3 17
H(5)
C(4) 4
F(5)
4 14 J(3)
4 14 7
G(3)

Figure 4: Project Network

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path
› 𝐸𝑆𝑖 = 𝐿𝐶𝑖
› 𝐸𝑆𝑗 = 𝐿𝐶𝑗
› 𝐸𝑆𝑗 − 𝐸𝑆𝑖 = 𝐿𝐶𝑗 − 𝐿𝐶𝑖 = 𝐷𝑖𝑗 10 12
6 8
A(6) D(2)
› 1-4 2 5 I(5)
› 4-6
9
› 6-7 0 E(3)
1 3 6 9
› 7-8 0 B(3)
6 17
8
3 17
› Path 4
H(5)
C(4)
› 1-4-6-7-8 F(5)
4 14
› C-F-H-J 4 7
J(3)
14
G(3)
› Distance (time)
Figure 4: Project Network
› 4+5+5+3=17 months [expected project completion time]

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Critical Path →Probability of completing the work on or before 19 months
› C-F-H-J
Activity Immediate Duration (Months)
10 12
Predecessor(s) O M P Mean Variance 6 8
A --- 5 6 7 6 0.11 A(6) D(2)
2 5 I(5)
B --- 1 3 5 3 0.44
9
C --- 1 4 7 4 1.00 0 E(3)
1 3 6 9
D A 1 2 3 2 0.11 0 B(3)
6 17
8
E B 1 2 9 3 1.78 3
H(5)
17

F C 1 5 9 5 1.78 C(4) 4
F(5)
G C 2 2 8 3 1.00 4 14 J(3)
4 14 7
H E,F 4 4 10 5 1.00 G(3)

I D 2 5 8 5 1.00 Figure 4: Project Network


J H,G 2 2 8 3 1.00
∑ 17 4.78
https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
Project Scheduling and Tracking
 PERT (Project Evaluation and Review Technique)
 Probability of completing the work on or before 19 months
𝑥−𝜇 19−17
 𝑃 𝑥 ≤ 19 = 𝑃 ≤ = 𝑃 𝑧 ≤ 0.91 = 0.3186 [Normal distribution]
𝜎 4.78
 Probability of completing the work on or before 19 months is 31.86%

Activity Duration
(Months)
Mean Variance
C 4 1.00
F 5 1.78
H 5 1.00
J 3 1.00
∑ 17 4.78

https://www.youtube.com/watch?v=WrAf6zdteXI&ab_channel=KauserWise
https://www.mathsisfun.com/data/standard-normal-distribution-table.html