Eitp Pressure Part PDF
Eitp Pressure Part PDF
COLD ROLLING AND PROCESSING FACILITIES FOR GRAIN ORIENTED ELECTRICAL STEEL
PROJECT NAME :
AT AURANGABAD INDUSTRIAL CITY, MAHARASHTRA
PROJECT OWNER : NLMK INDIA COATING PRIVATE LIMITED (A GROUP COMPANY OF NLMK, RUSSIA)
Review Code 3 - Document does not confirm to the Basic requirements as marked. Resubmit for review
Page 1 of 5
Exhibit No - 14
EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER
Issue : 8.0
EITP No. 34 / Rev. No.: NIL Item: EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER Job No.: CB 2185 & CB 2186
Inspec on Authority : CIB / CP Drg No./Rev No.: As Applicable
Inspection Stages
Reference Documents/ Extent of
S No. Activities Report Formats Comments / Remarks
Acceptance Criteria Check CBL CIB/CP JMC NLMK
/DCPL
Drawings,IBR with
1.2 EITP EITP 100% H R
latest amendments
Approved Drawings,IBR
1.3 WPS, WPQR, WOPQ with latest WPS & PQR 100% H R
amendments, CO
Qualification
1.4 NDE Operators Qualifications SNT-TC-1A - 2016 100% H R
Certificates
CALIBRATION
Procedure
1.8 Procedure for Calibration Applicable Standards 100% H R
No.CBL/CAL/06 Rev.
06
Page 2 of 5
Exhibit No - 14
EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER
Issue : 8.0
EITP No. 34 / Rev. No.: NIL Item: EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER Job No.: CB 2185 & CB 2186
Inspec on Authority : CIB / CP Drg No./Rev No.: As Applicable
Inspection Stages
Reference Documents/ Extent of
S No. Activities Report Formats NLMK Comments / Remarks
Acceptance Criteria Check CBL CIB/CP JMC
/DCPL
2.0 MATERIAL INSPECTION
a) Review of MTC/Test Reports H W
b) Material specification, Drawing,
Dimensions; thickness, length, rolling H W
margin etc. Customer Purchase
c) Visual ; Pitting, laminations and any order, IBR Code with Material Identification
H W
2.1 transit damages. latest amendments, Report 100%
d) Correlation of marking / stamping Approved Drawings, (Exhibit No - 13)
H W
with MTC. TDC.
e) Identification co-relation & transfer
of original marking, Identification of H W
weld test coupon.
3.0 Forming & Marking ( Boiler Shell )
Page 3 of 5
Exhibit No - 14
EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER
Issue : 8.0
EITP No. 34 / Rev. No.: NIL Item: EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER Job No.: CB 2185 & CB 2186
Inspec on Authority : CIB / CP Drg No./Rev No.: As Applicable
Inspection Stages
Reference Documents/ Extent of
S No. Activities Report Formats Comments / Remarks
Acceptance Criteria Check NLMK
CBL CIB/CP JMC
/DCPL
6.0 Fit-Up (Piping, Down Comer, Riser, Headers)
a) Pipe to Pipe/ Elbow/ Reducer butt
joint, Pipe to endplate joint.
(As applicable) Inspect :
6.1 H R
Root Gap, weld groove , offset,
dimensions as per drawing.
Page 4 of 5
Exhibit No - 14
EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER
Issue : 8.0
EITP No. 34 / Rev. No.: NIL Item: EITP FOR PACKAGED TYPE NATURAL GAS FIRED STEAM BOILER Job No.: CB 2185 & CB 2186
Inspec on Authority : CIB / CP Drg No./Rev No.: As Applicable
Inspection Stages
Reference Documents/ Extent of
S No. Activities Report Formats NLMK Comments / Remarks
Acceptance Criteria Check CBL CP JMC
/DCPL
12.0 SURFACE INSPECTION, FINAL DOSIER & FINAL DOCUMENTS REVIEW
Surface Preparation, Inside and
12.1 H -
External by mechanical Cleaning
Painting as per specification,
DFT/Shade :
Shell : 2 coats of silver oxide zinc
12.2 phosphate on external surface H -
Water Wall Panel & Economizer
Assembly : 2 coats of black oxide zinc Surface Preparation/
phosphate on external surface Painting Report
Approved drawings. (Exhibit No-49), Final 100%
Final inspection, punching verification
12.3 Inspection Report H H
& stamping
(F-QAD-31).
Document verification & submission:
Material Traceability records with mtc,
NDE Reports, Hydro test report,
12.4 Dimension report, Painting Report, H -
Testing & Measuring instruments
calibration records, final Release
Inspection Note
Final Dosier :
IBR with latest
12.5 Endorsement of final documents & Final Dossier 100% H H
addenda.
issue of certificate, Issuance IBR Form
4. During Hydrostatic Testing; Test water temperature shall be ambient but not less than 20°C. Maintain test pressure for at least 30 minutes minimum.
5. Packing And Dispatch; Ends of tube stubs shall be covered with rubber caps after applying easily removable good quality rust preventive oil & placed VCI pallets. Nozzle ends
shall be covered with wooden blanks.
6. Verify packing and loading of Boiler on the trailer before dispatch.
7. In addition to General Note : 1 to 6, drawing notes shall be followed strictly.
LEGENDS:
CP : Competent Person, CBL : Cheema Boilers Limited, A : Approval, CO : Customer Order, EITP : Examination, Inspection & Test Plan, CUS : Customer, H : Hold, RW :
Random Witness, R : Review,UT : Ultrasonic Thickness, RT : Radiography Test LPT : Liquid Penetrant Test,VT : Visual Test, HTP : Hydrostatic Test Procedure, NDE : Non
Destructive Examination, WPS : Welding Procedure Specification, PQR : Procedure Qualification Record, MTC : Material Test Certificate,TDC : Technical Delivery Condition,
A/R : After Root Run, FPW : Final Penetration Weld, HAZ : Heat Affected Zone, MM : Millimeter, X : Not Applicable, P1 : SA106 Gr B/SA105/SA210 Gr A1/SA516 Gr 70, WPQR
: Welder Performance Qualification, WPOQ : Welder Performance Operator Qualification Record
Page 5 of 5