Vol-II Price Proposal
Vol-II Price Proposal
Volume-II
(Price Proposal)
For
“CONSTRUCTION OF FOUNDATIONS, SUBSTRUCTURE &
SUPERSTRUCTURE ALONG WITH RIVER TRAINING/PROTECTION
WORK, TEMPORARY & ALLIED WORKS FOR 2 IMPORTANT /
MAJOR BRIDGES IN BETWEEN CHAINAGE KM 36+100 TO KM
40+480, IN CONNECTION WITH BHANUPALI-BILASPUR-BERI NEW
RAILWAY LINE IN DISTRICT BILASPUR OF HIMACHAL PRADESH
STATE, INDIA”.
Tel+91-11–26738517
Fax + 91-11-26738592; Mobile No. 9560697779
Note: Cement consumption coefficients for any item of work if not mentioned above, is to be taken from latest
CPWD DSR.
13. In case of difference in terms and conditions of payment in BOQ and else wherein the Bid document, the
terms and conditions of payment as laid down in BOQ shall prevail.
14. CONCRETE WORKS
14.1 Bill 2A.1, 2A.2 and Bill H : All Concrete works include cost of cement, aggregates or any
admixtures including Super plasticizers/accelerators/ curing agents/releasing agents etc.
or other additives like silica fume etc. For Reinforced cement concrete M25 and
above, minimum cementitious content shall not be less than 350 Kg/cum. For
reinforced cement concrete of lesser grades minimum cementitious content shall
not be less than 300 kg/cum. For Plain cement concrete minimum cementitious
content shall not be less than 250 Kg/cum. For super structure concrete,
preferably, OPC 53 shall be used to ensure early gain of strength.
15. Rates shall always include for testing where specified except where testing is scheduled separately for
payment.
16. Technical Specification reference mentioned in BOQ is for guidance only, as there are references to the
item under various clauses and the work are to be executed as per the requirement of the various clauses
in the Technical Specification.
17. While quoting the rates, Bidder is required to take into account the cost of deployment of minimum
machinery and manpower fulfilling requirements specified in Section 5: Work’s requirements. Idling
charges for man power and machinery will not be payable to the bidder on any account.
18. In respect of BOQ Item no. 2059 & 2076 the stage payment shall be as follows:
SN Stage Extent of Payment
(i) On supply of material within railway area against production of 60% of accepted rate for the
invoice item
(ii) On use / consumption in position of the material 40% of accepted rate for the
item
Note:
(a) The above stages of payment are subject to production of
required test(s) reports.
(b) Self attested Invoice is to be produced in original.
(c) In case the Contractor fails to use the quantity of item in the
lot within a period of 04 months after the month in which
payment has been released, the Contractor shall submit
Bank Guarantee for an amount equivalent to the value of
***
Bill of Quantities
Bill No. Description of Schedule Estimated Cost
in Rs.
1 2 3
Earthwork in Formation
1.1 1,11,01,508.30
(Standard Rates)
Earthwork in Formation
1.2 2,35,13,388.00
(Site Specific Rates)
Bridge work (Other than Steel works)
2A.1 12,52,22,841.86
(Standard Rates)
Bridge work (Other than Steel works)
2A.2 151,34,61,011.58
(Site Specific Rates)
Bridge Work (Steel items involving Fabrication and Erection)
2B.1 87,61,03,420.17
(Standard Rates)
Bridge Work (Steel items involving Fabrication and Erection)
2B.2 49,59,33,150.89
(Site Specific Rates)
Bridge Work (Supply of Steel items)
2C.1 212,00,88,616.74
(Standard Rates)
Supply of Cement
8.2 23,74,300.00
(Site Specific Rates)
Site Facilities
9.1 3,30,15,285.92
(Standard Rates)
10.2 Other items of work not covered in Bill no. 1 to 9 50,00,000.00
Road Work
H 2,19,84,596.50
(Site Specific Rates)
Environment Management Plan
J 22,58,430.50
(Site Specific Rates)
Total Estimated Price 523,00,56,550.46