0% found this document useful (0 votes)
103 views19 pages

Vol-II Price Proposal

Uploaded by

Ajay Jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views19 pages

Vol-II Price Proposal

Uploaded by

Ajay Jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

First Floor, Railway Recruitment Board Building

Railway colony, Near Chandigarh Railway Station,


Chandigarh 160002
Tele FAX - 0172-2730197
Email- [email protected]

Volume-II
(Price Proposal)
For
“CONSTRUCTION OF FOUNDATIONS, SUBSTRUCTURE &
SUPERSTRUCTURE ALONG WITH RIVER TRAINING/PROTECTION
WORK, TEMPORARY & ALLIED WORKS FOR 2 IMPORTANT /
MAJOR BRIDGES IN BETWEEN CHAINAGE KM 36+100 TO KM
40+480, IN CONNECTION WITH BHANUPALI-BILASPUR-BERI NEW
RAILWAY LINE IN DISTRICT BILASPUR OF HIMACHAL PRADESH
STATE, INDIA”.

IFB No: RVNL/BBB/Major Bridges/PK-4/Works Date: 28.10.2024


OCT - 2024

RAIL VIKAS NIGAM LIMITED


1ST Floor, August Kranti Bhawan, Bhikaji Cama Place,
Africa Avenue, New Delhi – 110066

Tel+91-11–26738517
Fax + 91-11-26738592; Mobile No. 9560697779

Email : [email protected]; [email protected]

Page 357 of 375


Page 358 of 375
RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
Bill of Quantities
PREAMBLE
1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General Conditions,
Particular Conditions of Contract, Works Requirement (Technical Specifications, and Drawings).
2. The quantities given in the Bill of Quantities are estimated and provisional and are given to provide a
common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried
out including spares to be handed over to Railway, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where applicable,
and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract. If any
quantities which have been supplied by the contractor and paid by RVNL are determined to be
surplus by the Engineer (except those quantities which become surplus due to change in
planning/scheme by Railway/RVNL) during the progress of the work or at the completion of the
work, shall be taken back by the contractor, and the payment made for such materials shall be
recovered from the pending claims. The materials which have become surplus due to change in
planning/scheme by Railways/RVNL and are still in usable condition shall be taken over by RVNL
and any part payment still to be made shall be released to the contractor.
3. In the Bill of Quantities, quantity and unit rates and thereby the amount against each item have been
indicated. From this, the estimated price of each bill has been worked out and indicated in the summary
sheet in BOQ. The Bidder shall quote rates as percentage above/below/at par for each schedule in the
summary sheet.
4. Deleted
5. General directions and descriptions of work and materials are not necessarily repeated or detailed in the
Bill of Quantities. References to the relevant specifications and sections of the contract documentation
should be made before quoting rates in the Bill of Quantities.
6. The rates and prices Bid in the priced Bill of Quantities shall, except as otherwise provided under the
Contract, include all construction equipment, plant, labour, supervision, materials, erection, maintenance,
insurance, profit, royalty, octroi, taxes and duties, together with all general risks, liabilities and obligations
set out or implied in the Contract.
7. The rates are deemed to be inclusive of all lead (except as otherwise specifically provided in the
description of the particular item), lifts, ascend, descend, handling, rehandling crossing of
nallah/streams/tracks any other obstructions.
8. All enabling works for executing the work e.g. access road to site (as different from approach road),
launching arrangements, procuring right of way, arrangement of water and electricity etc is to be arranged
by the contractor at his own cost and deemed to be included in the quoted rates.
9. Storage of Material: All the material at site will have to be properly stacked &stored so as to facilitate
inspection. The material should be properly protected from the detrimental effects of nature and fire, theft
etc. The contractor shall be responsible for watch & ward and any loss or deterioration on account of
above shall lead to rejection of material and contractor has to replace the same at his own cost.
10. The method of measurement of completed work for payment shall be in accordance with provisions in
Works Requirements (Specifications) except as otherwise specifically provided in the description of item
or particular bill of quantities or explanatory notes to the particular bill of quantities.
11. (a) In items of Bill No. 6.2: (Building and related items) and Bill No.9.1: (Site facilities), the rates are
inclusive of cost of all materials including cement, steel, etc. required to deliver the final product.
(b) Deleted.
(c) Deleted
12. NOTES SPECIFIC TO EACH BILL OF QUANTITIES.
12.1. BILL NO.1.1 & 1.2 FOR EARTH WORK IN FORMATION
12.1.1 The earth work in formation and blanketing has to be executed as per latest RDSO guidelines for
earthwork in railway projects with upto date correction slips. If naturally available material in the project
Vol-II (Price Proposal) Page 1 of 17

Page 359 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
area is not suitable for using as blanketing material directly then the blanketing material conforming to
RDSO specification has to be produced by blending various naturally available materials in required
proportion in a pug mill.
12.1.2 Obtaining prior permission for felling of trees including payment of royalty and taxes etc shall be
contractor’s responsibility and deemed to be included in the rates.
12.1.3 Joining of new formation with existing embankment has to be done with benching of 30 cm (V), 60 cm (H)
in the existing bank slope. The rate of earthwork includes the cost of benching.
12.1.4 Locations where blasting is warranted, prior permission of the employer must be obtained to ascertain
whether blasting is permitted or prohibited. Rate of rock cutting includes the cost of all precautionary
measures necessary for safety during blasting of rock.
12.2 BILL NO.2A.1, 2A.2, 2B.1, 2B.2 & 2C.1 : BRIDGES.
12.2.1 All material, equipment, labour, casting beds, stress frames, form work, staging, scaffolding, etc is to be
arranged by the contractor within the quoted rates.
12.2.2 1:4:8, 1:3:6 and 1:2:4 indicates concrete prepared using volumetric mix in proportion of cement: coarse
sand: stone aggregate of specified size, respectively.
12.2.3 All design mix concrete shall be machine batched with automatic weigh batcher, machine mixed and
machine vibrated or Ready Mix Concrete prepared in depot and transported by transit mixer to the site of
work.
12.2.4 Prior to demolishing of any structure measurements have to be taken, scheme of dismantling has to be
got approved from the Engineer.
12.3 BILL NO.4: (PERMANENT WAY SUPPLY)
DELETED
12.4 BILL NO.5: (PERMANENT WAY LINKING)
DELETED
12.5 Bill No.8.2 : (Supply of Cement):
Payment for supply shall only be made after the quantity is consumed in the related item of work. The
consumption of cement for payment on provisional basis in IPCs shall be worked out based on cement
consumption coefficients as given below or the coefficients determined in the mix design, whichever is
less. In order to find out actual consumption, periodical audit shall be conducted at an interval not
exceeding six months. In case, the actual consumption is found to be less than the quantity paid up to last
IPC and proposed to be paid in the current IPC, on provisional basis, the payment shall be restricted to
actual consumption. In the subsequent audit, the comparison of actual consumption and quantity paid on
provisional basis shall be done for the period after the previous audit.

COEFFICIENTS FOR CEMENT CONSUMPTION


Cement consumption coefficients
S.No. Item Unit
per unit in Kg. (Maximum)
Cement Concrete
1. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone
Cum 220
aggregate)
2. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
Cum 320
aggregate)
3. M20 Cum 400
4. M25 Cum 410
5. M30 Cum 420
6. M35 Cum 428
7. M40 Cum 435
8. M45 Cum 480
9. M50 Cum 500
Cement Mortar

Vol-II (Price Proposal) Page 2 of 17

Page 360 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
COEFFICIENTS FOR CEMENT CONSUMPTION
Cement consumption coefficients
S.No. Item Unit
per unit in Kg. (Maximum)
10. CementMortar 1:2 (1 Cement: 2 Sand) Cum 680
11. CementMortar 1:3 (1 Cement: 3 Sand) Cum 510
12. CementMortar 1:4 (1 Cement: 4 Sand) Cum 380
13. CementMortar 1:5 (1 Cement: 5 Sand) Cum 310
14. CementMortar 1:6 (1 Cement: 6 Sand) Cum 250
Brick Work
15. Cement Mortar 1:4 (1 cement: 4 coarse sand) Cum 95
16. Cement Mortar 1:6 (1 cement: 6 coarse sand) Cum 62.5
17. Cement Mortar 1:3 (1 cement: 3 coarse sand) half brick Sqm 14.28
18. Cement Mortar 1:4 (1 cement: 4 coarse sand) half brick Sqm 10.64

Note: Cement consumption coefficients for any item of work if not mentioned above, is to be taken from latest
CPWD DSR.
13. In case of difference in terms and conditions of payment in BOQ and else wherein the Bid document, the
terms and conditions of payment as laid down in BOQ shall prevail.
14. CONCRETE WORKS
14.1 Bill 2A.1, 2A.2 and Bill H : All Concrete works include cost of cement, aggregates or any
admixtures including Super plasticizers/accelerators/ curing agents/releasing agents etc.
or other additives like silica fume etc. For Reinforced cement concrete M25 and
above, minimum cementitious content shall not be less than 350 Kg/cum. For
reinforced cement concrete of lesser grades minimum cementitious content shall
not be less than 300 kg/cum. For Plain cement concrete minimum cementitious
content shall not be less than 250 Kg/cum. For super structure concrete,
preferably, OPC 53 shall be used to ensure early gain of strength.
15. Rates shall always include for testing where specified except where testing is scheduled separately for
payment.
16. Technical Specification reference mentioned in BOQ is for guidance only, as there are references to the
item under various clauses and the work are to be executed as per the requirement of the various clauses
in the Technical Specification.
17. While quoting the rates, Bidder is required to take into account the cost of deployment of minimum
machinery and manpower fulfilling requirements specified in Section 5: Work’s requirements. Idling
charges for man power and machinery will not be payable to the bidder on any account.

18. In respect of BOQ Item no. 2059 & 2076 the stage payment shall be as follows:
SN Stage Extent of Payment
(i) On supply of material within railway area against production of 60% of accepted rate for the
invoice item
(ii) On use / consumption in position of the material 40% of accepted rate for the
item
Note:
(a) The above stages of payment are subject to production of
required test(s) reports.
(b) Self attested Invoice is to be produced in original.
(c) In case the Contractor fails to use the quantity of item in the
lot within a period of 04 months after the month in which
payment has been released, the Contractor shall submit
Bank Guarantee for an amount equivalent to the value of

Vol-II (Price Proposal) Page 3 of 17

Page 361 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
unused quantity of the item or the amount shall be
recovered for 1/3rd of the amount equivalent to the value of
unused quantity of item every month.
(d) Complete responsibility of the safe keep and custody of
material at site shall rest with Contractor and the Engineer
will not have any responsibility on this account for loss or
damage. The Contractor shall make good any loss or
damage to the material at his own cost.
(e) The stage payment as in item (i) above shall be applicable
to minimum applicable quantity of lot as shown against
each item below:
BOQ Item No. Minimum Applicable Quantity of
Lot at site
2076 400 MT

***

Vol-II (Price Proposal) Page 4 of 17

Page 362 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT

Name of Work:-Construction of Foundations, Substructure & Superstructure along With River


Training/Protection Work, Temporary & Allied works for 2 Important / Major Bridges in between
Chainage Km 36+100 To Km 40+480, in connection with Bhanupali-Bilaspur-Beri New Railway Line in
District Bilaspur of Himachal Pradesh State, India.

Bill of Quantities
Bill No. Description of Schedule Estimated Cost
in Rs.
1 2 3
Earthwork in Formation
1.1 1,11,01,508.30
(Standard Rates)
Earthwork in Formation
1.2 2,35,13,388.00
(Site Specific Rates)
Bridge work (Other than Steel works)
2A.1 12,52,22,841.86
(Standard Rates)
Bridge work (Other than Steel works)
2A.2 151,34,61,011.58
(Site Specific Rates)
Bridge Work (Steel items involving Fabrication and Erection)
2B.1 87,61,03,420.17
(Standard Rates)
Bridge Work (Steel items involving Fabrication and Erection)
2B.2 49,59,33,150.89
(Site Specific Rates)
Bridge Work (Supply of Steel items)
2C.1 212,00,88,616.74
(Standard Rates)
Supply of Cement
8.2 23,74,300.00
(Site Specific Rates)
Site Facilities
9.1 3,30,15,285.92
(Standard Rates)
10.2 Other items of work not covered in Bill no. 1 to 9 50,00,000.00
Road Work
H 2,19,84,596.50
(Site Specific Rates)
Environment Management Plan
J 22,58,430.50
(Site Specific Rates)
Total Estimated Price 523,00,56,550.46

Vol-II (Price Proposal) Page 5 of 17

Page 363 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
BILL No.1.1 :EARTHWORK IN FORMATION
Standard Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 1002 Earthwork in excavation by mechanical means (Hydraulic
excavator) in cutting, in formation, trolley refuges, side drains, yard
drains, catch water drains, etc. including leading usable cut spoils up to
200 M and making formation in filling using the cut spoils, site
clearances, setting out and demarcation, disposing off surplus unusable
cut spoils as per directions of the engineer, and top and side dressing
and compaction of cutting formation to provide final formation as per
designed profile. The rate shall include compaction of cutting formation
and initial compaction of sub-soil where cut-spoils are used in filling. The
rate shall not include cutting of trees with girth above 30 cm and
compaction of cut spoils in filling, which shall be paid separately.
Note-
(1) Rock spoils such as stones, boulders, pebbles, gravels etc available
from excavation, if are found suitable for use in works as per required
specifications even after modifications etc., can be used free of cost but
the legally payable royalty and taxes are to be paid by the contractor to
the concerned authorities.
(2) Payment for earthwork in excavation for pucca drains shall not be
payable under this item and the same shall be paid under item no. NS-6
of Bill 1.
1002a Soil excluding rock. Cum 6,000.00 277.51 16,65,060.00
1002b Rock not requiring blasting. Cum 5,000.00 537.38 26,86,900.00
1002c Hard Rock requiring blasting. Cum 3,000.00 928.95 27,86,850.00
1002d Hard Rock requiring blasting, but blasting not permitted hence to be Cum 500.00 1,547.47 7,73,735.00
excavated by chiselling.
2 1003 Incremental rate for every Km or part thereof over item 1002 for Cum- 1,45,000.00 19.99 28,98,550.00
leading cut spoils beyond 200 M for making formation in filing. Km
Note : The earth from the cut spoils may be disposed off in identified
dumping locations.
3 1006 Mechanical Compaction of Earth and Blanket materials in layers of about Cum 1,000.00 39.98 39,980.00
30 CM (or more or less) in loose state using vibratory compactor (of
adequate capacity) so as to achieve compaction as per RDSO
Guidelines and Specification for Design of Formation for Heavy Axle
Load – Nov 2009. Minimum EV2 Criteria as mentioned in the guidelines
is not applicable.
Note: The payment for compaction shall be based on the computed
quantity of earth work/blanket work from the cross sections. The
payment, however, will be restricted only to the approved design profiles
furnished by the Engineer; or the actual quantity executed whichever is
less.
4 1009 Cutting down trees and uprooting of roots including transporting the
wood to nearby railway store or forest godown as per direction of the
engineer.
Note:(i) Cutting of trees with girth less than 30 cm and their clearance is
covered under item No. 1001 & 1002. Girth will be measured at a height
of 1 M above ground level.(ii) Contractor will arrange necessary forest
clearance on behalf of RVNL before cutting/felling trees.
1009 a Girth above 30 CM and up to 60 CM Each 100.00 184.61 18,461.00
1009 b Girth above 60 CM and up to 90 CM Each 100.00 450.37 45,037.00
1009 c Girth above 90 CM and up to 180 CM Each 50.00 1,124.15 56,207.50
1009 d Girth above 180 CM and up to 270 CM Each 20.00 2,302.39 46,047.80
5 1024 Compaction of embankment slope using hydraulic slope compactor Sqm 4,000.00 21.17 84,680.00
attached to Excavator by doing 2 or more passes as required to get firm
and neat compacted slope of embankment as directed by Engineer. The
item is inclusive of all men, materials, equipment, watering arrangement,
fuel etc. complete.
Note:
Daily record of compaction in chainage from… to… shall be jointly signed
by representatives of Engineer and Contractor.
Total for Bill No. 1.1 1,11,01,508.30

Vol-II (Price Proposal) Page 6 of 17

Page 364 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
BILL NO. 1.2 : EARTHWORK IN FORMATION
Site Specific rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 1007 Turfing / planting, including all lead and lift, and watering as required until
properly rooted, with. Note - Initially payment of only 40% will be made.
Balance 60% will be paid only after 3 months of maintenance period if
the turfing is properly rooted.
1007a Turfing with sods, 10cm thick and 20 cm square closely laid Sqm 4,000.00 72.97 2,91,880.00
2 NS-1 (Dry Stone pitching) Providing and laying Pitching with stone boulders Cum 1,000.00 2,978.77 29,78,770.00
weighing not less than 35 kg each with the voids filled with spalls on
slopes laid over prepared filter media including boulder apron laid dry in
front of toe of embankment complete as per drawing and Technical
specification.
3 NS-2 (Stone pitching in 1:4) Providing and laying Pitching with stone boulders Cum 4,200.00 3,585.10 1,50,57,420.00
weighing not less than 35 kg each with the voids filled with cement sand
mortar 1:4 on slopes laid over prepared filter media including boulder
apron laid dry in front of toe of embankment complete as per drawing
and technical specification.
4 NS-3 Earthwork in filling in Embankment Fill and Prepared Sub-grade of Cum 52,000.00 92.75 48,23,000.00
formation including guide bunds, around buried type abutments, bridge
approaches, trolley refuges etc using Railway's earth/ Muck generated
from excavation of Underground & other works and dumped at the
location of the bank or nearby, of approved quality as per RDSO
guidelines for design /Construction of formation on Indian Railway track
issued vide RDSO specification RDSO/2020/GE:IRS-0004 dated
September, 2020, procured from railway land including site clearances,
setting out and demarcation, benching, initial compaction of subsoil after
leveling the surface after site clearance, spreading loose earth in layers
of maximum 30 cm thickness using grader up to extra width of 0.5 m
beyond designed profile, compaction using vibratory compactors, top
and side dressing and removal of extra earth from sides to provide final
formation as per designed profile as per RDSO Guidelines. The rate
shall include cutting of trees with girth upto 30 cm, making good the
pockets and depressions left in soil during clearing and uprooting of
jungle/trees at site and initial compaction of sub-soil thereafter. The rate
shall not include cutting of trees of girth beyond 30 cm and compaction
(excluding initial compaction of sub-soil mentioned above), which shall
be paid separately.
The rate shall include cost of all field and laboratory tests including those
required for subsoil but excluding CBR tests which will be paid vide
separate BOQ item. The rates include segregation of Boulders from the
Tunnel Muck. However, the mechanical compaction in layers shall be
paid separately under relevant item.
Note:
1. Lead for the muck generated from excavation of Underground and
other works.
2. Lead for railway's earth includes up to 200 m.
3. Royalty on Railway's earth/Muck (being used for formation filling), if
applicable will be borne by RVNL.
5 NS-4 Earth work in cutting in foundation, trenches, pucca drains in station
area/block section etc in all kinds of soil including dressing of sides,
ramming of bottoms, back filling of trenches, getting out the excavated
soil and disposal of surplus excavated soil with all lead and lift as
directed by the Engineer.
NS-4 a In all kinds of soil Cum 500.00 179.26 89,630.00
NS-4 b In ordinary rock Cum 250.00 289.73 72,432.50
NS-4 c Hard Rock (requiring blasting) Cum 250.00 520.05 1,30,012.50
NS-4 d Hard Rock ( blasting prohibited) Cum 100.00 702.43 70,243.00
Total for Bill No. 1.2 2,35,13,388.00

Vol-II (Price Proposal) Page 7 of 17

Page 365 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
Bill No. 2A.1: Bridge work (Other than Steel items)
Standard Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 2001 Earth work in excavation in foundation of bridges to desired profile.
Payment for backfilling shall be made separately.
2001a Soil excluding rock. Cum 24,432.00 383.76 93,76,024.32
2001b Rock not requiring blasting. Cum 16,288.00 681.85 1,11,05,972.80
2001c Hard Rock requiring blasting Cum 120.00 1,109.03 1,33,083.60
2001d Hard Rock requiring blasting, but blasting not permitted, hence to be Cum 120.00 1,650.04 1,98,004.80
excavated by chiselling.
2 2002 Dewatering of natural or accumulated water from any location. Payment HP 2,500.00 109.14 2,72,850.00
to be done for Horse power of pump multiplied by pumping hours. The Hour
rates include the cost of pumping or bailing out water with the contractor‘s
pump(s), tools, plants, fuel and labour etc complete.
Note:
1) In case any work is to be executed in or under water and/or liquid
mud/under foul position which requires pumping out, the contractor shall
deploy pump(s) of required capacity as directed by the Engineer. The
payment under this item shall be permissible for the works which require
pumping but the rates of pumping are not included in the item.
2) Whenever pumping out is ordered by the Engineer, a log book shall be
maintained duly recording the capacity of the pump(s) deployed and
timing of starting and stopping of each pump to arrive at the number of
hours for which the pump has worked. This log book has to be signed on
daily basis by authorised representative of PMC and contractor till pump
is deployed.
3) For payment purposes cumulative time in minutes for each capacity of
pump is to be added and divided by 60 to arrive at the number of hours
ignoring upto 0.5 hours and rounding off to one hour beyond 0.5 hour.
3 2019 Providing two coats of coal tar epoxy of 150 to 200 microns on Sqm 1,200.00 296.91 3,56,292.00
R.C.C. substructures of bridges by roller or by airless spray after
surface preparation.
4 2020 Providing and fixing bridge plaque (750 MM base, 720 MM height Each 4.00 402.54 1,610.16
triangular section with 400 MM thickness) on both sides of parapet using
cement concrete of specified mix including engraving bridge number,
direction of flow and other details including painting the letters with
enamel paint of black colour of approved quality with white back ground
as per standards of railway as directed by the engineer.
5 2021 Providing and fixing river name boards of size 2.10 M x 1.0 M made of Each 4.00 7,844.16 31,376.64
MS sheet 6 MM thick and ISA 50 x 50 x 5 MM frame all around, fixed on
rail posts erected with railway's rails fixed in cement concrete base of size
60 CM x 60 CM x 75 CM of CC 1:2:4 including painting with two coats of
paint of approved quality and colour over one coat of primer, writing the
name of the river in vernacular and English in black colour with yellow
back ground as directed by the engineer.
6 2024 Conducting load testing on single pile or on separate test pile in
accordance with IS: 2911(Part IV) including installation of loading
platform, kentledge, preparation of pile head, construction and dismantling
of test cap, etc.
Note: Boring and installing of test piles shall be paid under item No.2022.
2024a Initial vertical load test. Each 4.00 8,43,718.16 33,74,872.64
2024b Routine test. Each 9.00 1,88,548.62 16,96,937.58
7 2025 Non destructive integrity testing of cast -in- situ piles of Each 533.00 4,028.88 21,47,393.04
1500mm/1800mm dia as per specifications and submitting reports in the
approval format.
8 2026 Conducting Dynamic load testing on selected piles of routine pile load Each 45.00 1,20,854.57 54,38,455.65
test, all as per specifications.
9 2031 Providing and fixing of 100 MM dia PVC pipe for weep holes in Meter 1,268.00 379.06 4,80,648.08
abutments, wing walls, return walls, face wall, retaining wall etc at suitable
intervals as directed by the Engineer-in-charge.
10 2033 Providing and placing sand/earth filled bags in layers for protection of Each 5,00,000.00 12.91 64,55,000.00
existing embankment.
11 2036 Metalising of girder components with sprayed aluminium and painting Sqm 11,319.00 1,233.43 1,39,61,194.17
the metalised surface with four coats of approved paint conforming to IRS:
BI-2001 including surface preparation by sand blasting.
Note:
Payment for the item shall be released in two stages: (i) 80% on
metalising of girder components with sprayed aluminium and painting the
metalised surface with three coats of approved paint conforming to IRS:

Vol-II (Price Proposal) Page 8 of 17

Page 366 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
BI-2001 including surface preparation by sand blasting; and (ii) 20% after
balance one coat of aluminum paint and completion of erection in all
respect.
12 2040 Manufacturing, supplying and fixing of granite plaque of size 600 x No. 17.00 4,715.42 80,162.14
600 mm with a thickness of 19mm as per details shown in the bridge
manual including engraving foundation details, viz. Bridge No., abutment
no., pier no., classification of soil, depth of foundation etc., including
painting the letters duly fixing over CC platform of size 700 x 700 mm with
a thickness of 75mm with all materials including cement, labour, lead and
lifts etc., as directed by Engineer in charge
13 2041 Manufacturing , providing boulder crates and placing the stone boulders in cum 10,000.00 3,857.54 3,85,75,400.00
crates for construction of coffer dam in Pond/jheel/ or any other water
body for purpose of filling the water bodies with sand etc in above/under
water conditions as per approved drawing furnished including supplying of
8 SWG GI wire netting 150x150 mm mesh with proper securing. Boulder
will be supplied by the contractor of approved quality of suitable sizes of
weight not less than 30 Kg and stacking the same at desired locations
including loading, unloading, handling and all lead, lift and freight charges
etc complete as directed by the engineer in charge. The rate shall include
cost of royalty, all sorts of taxes etc. complete in all respect as per the
direction of Engineer-in -charge.
Rate includes all lead, lift, descent and crossing the track etc. to complete
the work in all respects. This item does not include cost of sand required
in backfill and the same will be paid separately.
14 2042 Providing & laying non pressure NP-4 Class RCC pipe with collars,
jointing with 1:2 Cement and ordinary sand mortar including testing of
joints but excluding earth work with all labour and material as a complete
job. Cement for mortar will be paid separately.
2042b 600mm dia Meter 800.00 6,008.69 48,06,952.00
2042e 1000 mm dia Meter 1,000.00 9,726.57 97,26,570.00
15 2043 Supplying and driving hard wood piles approx 5 to 7 m long without joint Meter 3,200.00 372.02 11,90,464.00
of 125 mm average diameter for the protection of bank slope, if required
as per directions of Engineer-in-charge. The rate includes supply and
erecting derrick and monkies for driving piles in any type of soil. The rate
also includes cost of all materials, labour, lead, lift and two coats of coal
tar paint complete in all respect.
16 2044 Driving ‘Z’ section MS sheet piles, upto 10mm thickness, side by side in Sqm 4,416.00 2,450.42 1,08,21,054.72
all kinds of soil mechanically or manually as per directions of Engineer-in-
charge and removing after the work. The rate shall include all labour,
materials, tools and plants, lead and lift as per site condition including ‘Z’
section sheet pile.
Note: Measurement will be based on area covered i.e. depth of pile
actually driven in the earth along the trench multiplied by length of such
protection along the trench.
17 2046 Conducting lateral load testing on single pile or on separate test pile in Each 4.00 1,14,365.88 4,57,463.52
accordance with IS: 2911(Part IV) with all labour, material, tool & plants,
equipment, machinery etc. complete as per drawing and specification as
directed by Engineer
18 2047 Exploratory drilling of Boreholes down to required depth up to 50 M, drilling of Meter 680.00 2,733.25 18,58,610.00
150mm diameter boreholes in all type of soils except hard rock and large
boulders (boulder core more than 30 cm), including refilling and reinstating
surface, and disposing off surplus material including use of mechanical rigs
with power operated winches as well as percussion / chiselling tool for
advancing through occasional seams of hard strata to be employed, where
necessary in Dry area. The rates include taking out samples and conducting all
tests as per requirement of relevant IS codes and preparation of final report
giving complete and comprehensive record of investigations, laboratory reports
and calculations in approved format. The report shall include recommended
foundation type for each important and major/minor bridge along with reasons.
19 2048 Drilling of NX size borehole (75 mm dia) in all types of hard rock (fresh rock) Meter 300.00 8,921.50 26,76,450.00
and collection of rock core samples from boreholes and preserving in boxes for
depth upto 30 m. The rates include taking out samples and conducting all tests
as per requirement of relevant IS codes and preparation of final report giving
complete and comprehensive record of investigations, laboratory reports and
calculations in approved format. The report shall include recommended
foundation type for each important and major/minor bridge along with reasons.
Total for Bill No. 2A.1 12,52,22,841.86

Vol-II (Price Proposal) Page 9 of 17

Page 367 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
Bill No. 2A.2: Bridge work (Other than Steel items)
Site Specific Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 NS-2003 Providing and laying M 15 cement concrete in foundation and floor Cum 1,569.00 7,018.95 1,10,12,732.55
using well graded stone aggregate of 40 MM nominal size. (Rates is
inclusive of cement)
2 NS-2004 Providing and laying design mix control concrete M20/M25 in piers, Cum 1,000.00 12,913.97 1,29,13,970.00
retaining walls, wing walls, return walls, bottom/top plug of wells
and protection work etc. using well graded stone aggregate of 40MM/20
MM nominal size. (Rate is inclusive of cement.)
3 NS-2005 Providing and laying Design mix control concrete
M25/M30/M35/M40/M45/M50 in cast-in-situ RCC works of raft, pile
cap, pier, abutment, well steining, RCC well kerb, well cap, pier cap,
Jacketing, dirt wall, return wall, wing wall, fly wing wall, retaining
wall, approach slab, foot path slab, wearing course, ballast
retainers, RCC railing, inspection platform, pedestal, boxes and
other miscellaneous works using well graded stone aggregate of 20
MM nominal size. (Rate are inclusive of cement.)
Note:1 Extra @ 32% of the rate for concreting done for the jacketing work
under this item shall be payable and shall deem to include cost of surface
preparation, drilling of holes, insertion of dowel bars and grouting of holes
etc. required for the work but exclude cost of dowel bars which shall be
payable separately under relevant BOQ item.
Note:2 Extra @30% of the rate for the concreting done in pier cap at
height more than 20m (height shall be measured from top of well/pile cap
to top of pier cap) and Deck slab of composite girder in superstructure
under this item shall be payable.
Note:3 Wherever the concrete in piers is executed with use of slip form
shuttering, the same shall be payable under NS-2 of this Bill.
NS- Providing and laying Design mix control concrete M25 in cast-in-situ RCC Cum 500.00 14,967.03 74,83,515.00
2005a work
NS- Providing and laying Design mix control concrete M30 in cast-in-situ RCC Cum 1,000.00 15,245.47 1,52,45,470.00
2005b work
NS- Providing and laying Design mix control concrete M35 in cast-in-situ RCC Cum 1,000.00 15,570.81 1,55,70,810.00
2005c work
NS- Providing and laying Design mix control concrete M40 in cast-in-situ RCC Cum 30,968.00 15,850.27 49,08,51,161.36
2005d work
NS- Providing and laying Design mix control concrete M45 in cast-in-situ RCC Cum 865.00 16,081.78 1,39,10,739.70
2005e work
4 2014 Providing and laying Cement concrete or RCC M25/M30/M35/M40 in Cum. 200.00 14,548.87 29,09,774.00
pre-cast for raft, abutment, dirt wall, return wall, wing wall, fly wing
wall, retaining wall, approach slab, slab for inspection steps, slab for
inspection path, coping slab for bridge, slab for bank slope, foot
path slab, wearing course, ballast retainers, RCC railing, inspection
platform, pedestal, boxes and other miscellaneous works using well
graded stone aggregate of 20mm nominal size. Transportation to site
from casting yard, launching, laying, aligning and jointing the pre-cast
items including road movement upto the nearest approachable point and
short leading by rail lorry etc., wherever required as directed by Engineer-
in-charge. The rate is inclusive of cost of all men, machinery, materials
and construction/repair of approach roads as per requirements for which
no extra payment will be made).Payment to be released in two stages:
(i) 50% on casting of precast components;
(ii) 45% on transportation and launching of precast components to the
site; and
(iii) balance 5% on completion of balance works.
5 2015 Providing and laying dry stone backing behind abutments, wing Cum 1,166.00 2,171.37 25,31,817.42
walls, return walls, RCC boxes with stones not less than 15 CM in any
direction and not less than 15 KG (except smaller boulders required for
filling voids) in weight.
6 2016 Providing and laying backfill material behind boulder filling of Cum 293.00 489.64 1,43,464.52
abutments, wing walls, return walls consisting of granular materials of
GW, GP, SW groups as per IS 1498-1970 in required profile .
7 2017 Providing and laying 300 MM thick dry stone pitching in flooring, Cum 600.00 1,112.33 6,67,398.00
exposed slopes, etc. with boulders of not less than 30 KG each in
weight, hand packed with surface levelled off to the correct section with
hammer dressing as necessary including filling the gaps with quarry
spalls.

Vol-II (Price Proposal) Page 10 of 17

Page 368 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
8 NS-2022 Providing, Driving and installing Bored cast in situ Reinforced
Cement Concrete piles of specified diameter and length below pile
cap in M-40/50 grade Design Mix Cement Concrete, using 20 mm
graded crushed stone aggregate and coarse sand of approved quality, to
carry a safe working load not less than specified, excluding the cost of
casing pipe but including the cost of shoe and length of pile to be
embedded in pile cap etc complete, concreting by machine batching
machine mixing, scaffolding, using Admixture in recommended
proportions as per IS 9103), approved in design Mix, placing with tremie
pipe, chipping off of pile top to remove laitance concrete above cut off
level etc, pumping and bailing out water, with all labour material complete
including crossing of tracks if required as per approved drawing,
specification and direction of the Engineer in charge. The rate shall
include Boring in all soils except Hard Rock and Big Boulders. The Boring
in Hard Rock and Big Boulder larger than 30cm depth shall be paid as per
the item NS-2023. Length of the pile for payment shall be measured Up to
the bottom of pile cap excluding the mud mat. Payment for casing pipe &
steel reinforcement shall be paid extra. (Rates are inclusive of cement).
NS- 1500 MM dia pile Meter 6,128.00 19,724.80 12,08,73,574.40
2022a
NS- 1800 MM dia pile Meter 7,750.00 37,126.00 28,77,26,500.00
2022b
9 NS-2023 Extra for chiselling over Item no. NS-2022 above of this Bill in addition to
boring of piles if chiselling is resorted to in hard rock or big stone boulders
larger than 30 cm depth by any means i.e. by hydraulic chisel or
mechanical chisel and hammer method.
NS- 1500 mm Diameter Metre 2,043.00 7,106.67 1,45,18,926.81
2023a
NS- 1800 mm Diameter Metre 2,584.00 10,233.60 2,64,43,622.40
2023b
10 2039 Random rubble masonry with mix 1:5 for drains including pointing in CM Cum. 600.00 2,584.36 15,50,616.00
1:3 with all labour, materials etc. Note : Random rubble masonary work in
Breast wall shall be payable under this item.
11 NS- Extra over 2024a for every 50T(or part thereof) of test load beyond 500T Each 60.00 99,664.02 59,79,841.20
2024c
12 NS-1 Conducting Pile integrity test with cross hole ultra sonic monitoring Each 533.00 21,459.14 1,14,37,721.62
CHUM of 1500/1800 mm dia pile (Sonic Logging) by approved
specialized agencies including the cost of providing and installation of
access tubes ( as per the specifications of ASTM D6760-16) for the entire
length of pile to be tested as per specification, mobilization of test
apparatus and submission of test results in duplicate clearly indicating the
nature and extend of defect in the shaft, if and, in and approved format.
13 NS-2 Providing and laying RCC In M-35/M-40/M45/M50 grade with 20 mm Cum. 17,398.00 27,111.70 47,16,89,356.60
graded crushed stone aggregates and sand of approved quality in
hollow/solid pier shafts of all shapes/sizes for all heights to be cast
by SLIP FORM method including cost of all labour, material, admixtures
(if any), leads & lift, mechanical/electrical vibrators, dewatering, curing,
leveling of surface and finishing in all respects as per approved drawings
& specifications and as directed by Engineer-In-Charge. The rates shall
also include provision of ventilation holes, opening, marking of level
gauge from top to bottom of pier shaft as a complete job. (Rates are
inclusive of cement)
Note:1. Payment for supply of reinforcement steel shall be paid as per
approved drawing (excluding all wastages) separately under relevant
item.
Note-2. Use of jump Form Shuttering shall also be permitted as an
alternative to slip Form Shuttering.
Note-3. Normally, piers of height approximately 20m or more are to be
cast by use of slip Form/ Jump Form Shuttering under this item. However,
the payment shall be made under relevant item based on form work
method used for casting of concrete as per instruction of Engineer-in-
charge.
Total for Bill No. 2A.2 1,51,34,61,011.58

Vol-II (Price Proposal) Page 11 of 17

Page 369 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
BILL No.2B.1: BRIDGES
Bill No. 2B.1 Bridge work: (Steel items Involving Fabrication and Erection )
Standard Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 2056 Providing trolley/men refuges, inspection ladder, hand railing, other MT 50.00 1,53,493.60 76,74,680.00
miscellaneous components made of GI pipe/structural steel
conforming to IS: 226 bolted/welded construction including fixing on
bridges as per drawing and painting with one primer coat of red lead
paint conforming to IS: 102 or zinc chromate paint conforming to IS:104
(with total DFT of 160 microns). Work shall be carried out as per I.S. 800.
Note: Payment under this item shall be done on the lines of schedule of
stage payments for fabrication & erection of girders as specified in para
8.2 of part (h) ‘Steel Works’ of Chapter-3 (Bridges) of RVNL Standard
Specifications for Material and Works - Vol.-I, Engineering Works.
Payment for any stage as indicated in para 8.2, if not required for the
works under the item, shall be combined with next stage payment.
2 2059 Supplying, fabrication, assembling of all types of steel girders of
specified spans with structural steel conforming to Quality "B0" Grade
Designation E250 conforming to IS:2062, erection / slewing / end
launching of steel girders with cranes or any other approved launching
methods as per site conditions (not requiring traffic block) on sub-
structure including provision of trolley refuges etc., complete as per
approved QAP and drawings conforming to IRS-B1-2001 and other
relevant codes and specifications.
Note:
1. Detailed fabrication and erection drawings & launching methodology
will be prepared by the contractor and got approved from Employer.
2. The item includes fabrication of all types of battens, bracings, ties,
stiffeners, packing, diaphragms, shop rivets / welding, T&F bolts, drifts,
SAW, templates, jigs, fixtures, accessories, transporting various
components from fabrication shop to site including loading & unloading,
assembly of girders with drifts/bolts, field riveting /welding /HSFG Bolting,
assembling of temporary support for side slewing, raising of girders to the
bed block level, providing sliding arrangements and slewing the girder in
position, lowering of girder on bearings and bed plates with all temporary
arrangements or any other method of launching complete.
3. The bearing sets to be provided with the girders will be paid separately
as per relevant item.
4. Payment for addition in weight for rivets / welds shall be made as per
para 8.1 of Volume I – Part A - Bridges of RVNL Standard Specifications.
5. The rate for this item do not include Galvanising and painting of girder
components including surface preparation, charpy test, steel channel/ H
beam sleepers, chequered plate pathways, and railings, which shall be
paid separately under relevant items.
6. Payment to be made in stages as per RVNL standard specifications
Vol-I, Part: A- Chapter 3 "Bridges" (h) Steel Works Clause 8.2, para 8.2.2
along with up to date A&Cs.
7. In terms of Railway Board guidelines the 3rd party for inspection of
Structural Steel Fabrication and Erection work of steel girders will be
engaged and the cost will be borne by RVNL.
2059 b Open Web Girder MT 4,509.00 1,81,827.28 81,98,59,205.52
2059 e Extra for Charpy tested steel plates over and above item no. 2059a & MT 4509.00 2,953.36 1,33,16,700.24
2059b.
Note: Payment will be made on the basis of steel plates used in girders
excluding wastages etc.
3 2060 Providing pathways of galvanized steel chequered plates conforming MT 227.00 1,55,298.83 3,52,52,834.41
to IS:3502 including fixing on steel sleepers with nuts and bolts as per
drawing.
Total for Bill No. 2B.1 87,61,03,420.17

Vol-II (Price Proposal) Page 12 of 17

Page 370 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
Bill No. 2B.2 Bridge work: (Steel items Involving Fabrication and Erection )
Site Specific Rates
S. Item Description of Item Unit Quantity Rate Amount
No. No. (in Rs.) (in Rs.)
1 NS-1 Supply and installing Casing pipe of MS sheet for bored piles as
directed by the engineer.
Note: The collar provided for strengthening of casing pipe shall also be
measured under the same item for payment purposes, in addition to the
casing pipe.
NS-1a Supply and installing Casing pipe of MS sheet for bored piles as directed Meter 990.00 35,966.63 3,56,06,963.70
by the engineer for 1500mm dia pile (MS Sheet 10mm Thick)
NS-1b Supply and installing Casing pipe of MS sheet for bored piles as directed Meter 3,078.00 43,159.96 13,28,46,356.88
by the engineer for 1800mm dia pile (MS Sheet 10mm Thick)
2 NS- Extra to Item 2059a for use of steel of following grades: E-350 Ccu MT 4,509.00 10,733.13 4,83,95,683.17
2059b Note: The rate of item NS 2059b shall be payable with stage payment of
item 2059a against procurement of material
3 NS-2 Providing bearings on piers and abutments conforming to latest
RDSO drawing including manufacture, supply, testing & fixing in position
for steel girders suitable for 25 Ton loading standards
Note: 80% of the rate shall be paid on supply of complete set of bearings
along with all fittings and fixtures at site as per RDSO Drawing and
submission of test certificates as per contract provisions. The balance
20% of the rate will be paid after fixing on to pier/abutment in satisfactory
manner and launching of the girder.
NS-2a Two fixed type and Two roller type bearings for 30.5 m span Set 1.00 6,14,985.86 6,14,985.86
NS-2b Two fixed type and Two roller type bearings for 61.0 m span Set 14.00 16,12,099.50 2,25,69,393.00
4 NS-3 Supplying and fixing of high strength friction grip bolts 10.9 grade KG 2,25,406.00 333.38 7,51,45,852.28
finish zinc phosphate as per IS 3757/1985 and IS 4000 : 1992 including
HSFG nuts as per IS 6623 : 2004 and washers to IS 6649 : 1985 as per
drawings, specifications and directed by engineer in-charge.
5 NS-4 Providing temporary working Platform using driven hollow steel MT 1,316.00 1,37,351.00 18,07,53,916.00
pipes / floating caissons as foundations and steel plates as platform.
The rates include design, with contractors steel conforming to IS:2062-
1999 including fabrication, assembly, erection, launching, riveting/welding,
bolting, initial coats of zinc chromate priming conforming to relevant IS
specification on all surfaces complete. Rate is inclusive of all steel
components as per design.The average width of temporary working
platform shall be about 4.5m to facilitate construction of foundation & sub-
structure. The temporary working platform has to be maintained in
motorable condition throughout the contract period.The item also includes
the dismantling of temporary working platform and taking dismantled
materials as property of the contractor.Stage Payment: 90% of accepted
rate shall be payable after construction of temporary working platform.
Balance 10% shall be payable after period of completion.
Total for Bill No. 2B.2 49,59,33,150.89

Vol-II (Price Proposal) Page 13 of 17

Page 371 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
Bill No. 2C.1: Supply of Steel items
Standard Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 2076 Supplying TMT Fe-500/Fe-500D* reinforcement steel conforming to MT 19,818.00 1,06,977.93 2,12,00,88,616.74
IS:1786-1985 including decoiling, straightening, cutting, bending, placing
in position, binding with 1MM dia GI binding wire.
Note :
1. Reinforcement, shall be measured in length for different diameters
used in the works and then paid as per standard weights as per IS 1732.
Wastages, overlaps, coupling, welded joints, space bars, chairs and
binding wire shall not be measured and cost of these items shall be
deemed to be included in the rates.
2. * For seismic zone III, IV & V, only TMT Fe-500D steel shall be used.
3. Payment will be made on completion of scope of the item and the
same is not linked to concreting.
Total for Bill No. 2C.1 2,12,00,88,616.74

BILL No.8.2 : Supply of cement


Site Specific Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 8002 Supply of 53 grade cement OPC conforming to IS: 12269 with latest Bag of 5,000.00 474.86 23,74,300.00
amendments and using the same in the work as per RVNL's approved mix 50 kg
design as per RVNL's prescribed rates of consumption including all lead
lift, labour, loading unloading, ascent, descent, crossing of Railway
lines(s), royalty, taxes, transport (contractor's own), tools and plant
complete.
Total for Bill No. 8.2 23,74,300.00

Vol-II (Price Proposal) Page 14 of 17

Page 372 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
BILL NO. 9.1: SITE FACILITIES
Standard Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 9001 Providing site offices for Employer with Contractor's material, Sq.m. of 200.00 28,297.38 56,59,476.00
Labour, Tools and Plant, Equipment etc. including provision of Water Plinth
Supply, Drainage, Power arrangements, office maintenance as per the area
details mentioned in clauses 3.1 to 3.2.8 & 3.5 to 3.5.2 of Chapter 3
(Site Facilities for the Employer and the Engineer) of Section 5 (Work's
Requirement) of Tender Documents.
Note 1: This item is provided with the contention that new site offices
will be constructed for this purpose and 75% payment of the accepted
rates will be made after making available functional office, balance 15%
payment shall be made at the end of the completion period and the
remaining 10% will be paid after clearance of site by the contractor.
Note 2: Alternatively if suitable accommodation is available on hire
basis at suitable location acceptable to the employer, the contractor can
arrange the same under the item but in such a case the payment shall
be regulated as below.
(a) 10% payment shall be made on completion of one month from the
date of making available the office fit for functioning.
(b) Remaining 90% payment shall be paid in equal monthly installments
that is (0.9xQuoted rate) / (Stipulated Completion period in months +
defect liability period in months).
Note 3: In case stipulated period gets extended, payment on monthly
basis, under this item, in such extended period, shall be made as
under;
(i) in case of new construction @ [(54% of Quoted rate) / (Stipulated
Completion period in months + defect liability period in months)] per
Sq.m. of Plinth area.
(ii) in case of accommodation on hire @ [(90% of Quoted rate) /
(Stipulated Completion period in months + defect liability period in
months)] per Sq.m. of Plinth area.
2 9002 Providing Furniture as given under clauses 3.3, 3.3.1 of Chapter 3 L S Per 1.00 21,97,823.90 21,97,823.90
(Site Facilities for the Employer) of Section 5 (work's Requirement) of Site Office
Tender Documents.
Note: Payment shall be made @ 75% of the accepted rate after making
available the furniture items in functional office, balance 15% payment
shall be made at the end of the completion period and the remaining
10% will be paid after clearance of site by the contractor.
3 9003 Providing Road Vehicle mentioned below for the use of
Engineer/Employer as per the Conditions mentioned in Clause 3.4.3,
i..e 3.4.3.1 to 3.4.3.3 of Chapter 3 (Site Facilities for the Employer and
the Engineer) of Section 5 Work's Requirement) of Tender Documents.
9003a INNOVA, MAHINDRA XUV500 or similar Vehicle 60.00 1,18,133.06 70,87,983.60
months
9003b BOLERO, SCORPIO, ERTIGA, MARAZZO or similar Vehicle 150.00 1,01,648.74 1,52,47,311.00
months
9003c Extra for running and maintenance of every additional km over and Per km 1,000.00 27.23 27,230.00
above 4000 kms as specified in item 9003 (a)
9003d Extra for running and maintenance of every additional km over and Per Km 1,000.00 22.49 22,490.00
above 4000 kms as specified in item 9003 (b)
4 9004 Providing computers with software, printers and other office LS per 1.00 19,63,772.66 19,63,772.66
equipment as given under Clause 3.6 of Chapter.3 (Site facilities For site office
the Employer)of Section-5 (Work's requirement) Of bidding documents.
Note:i) Payment shall be made @ 85% of the rate after making
available the office equipment in functional condition.ii) Next 10% of the
rate shall be paid at the end of the completion period.
5% of the rate shall be paid after the equipment is taken back by the
contractor and the site is cleared by the contractor.
5 NS-1 Providing and fixing Porta cabin of approved make (20 ft x 10 ft) with Nos. 2.00 4,04,599.38 8,09,198.76
furnishing and toilet block facilities at designated places including the
cost of all materials, Labour, equipments etc. required for the
completion of job.
Note: Contractor shall arrange for preparation of plinth for proper
placement of these porta cabins.
Total for Bill No. 9.1 3,30,15,285.92

Vol-II (Price Proposal) Page 15 of 17

Page 373 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
Bill No.10.2 : Other Items
Site Specific Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 10001 Execution of items of work covered by USSOR -2019 of IR. 1 Lump 50,00,000.00 50,00,000.00
Note: This will be operated for only those works which cannot be executed Sum
by operation of items in other schedule of the contract.
Total for Bill No. 10.2 50,00,000.00

Bill No. H : Road work


Site Specific Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 H1 Construction of Embankment with materials deposited from Roadway/Hill KM 2.5 14,32,693.00 35,81,732.50
side cutting: Construction of embankment with approved/suitable
materials deposited at site i.e. obtained from road way & hill cutting and
excavation from drain, if any and foundation of other structures and
compacted to meet requirement of table No.300-2 of MORT&H including
all leads and lifts all complete as per drawings and Technical
Specifications Clause 305 of MORT&H as applicable for hill roads.
Materials as obtained from excavation and hill cutting will be used for
construction of embankment on approval of Engineer in Charge. The rate
shall include the cost of cutting from hill side, cost of filling / using the cut
material in embankment and compaction to the required profile.
Note:
(i) For the purpose of payment, this item shall be applicable to new
approach / access road to tunnel /bridge locations and muck dumping
locations.
(ii) For widening of existing kutcha / pucca road, payment @ of 80% of
accepted rate shall be made.
(iii) The average width of approach road shall be about 5m from toe of hill
side to edge of berm.
(iv) The measurement shall be along the centre line of road.
(v) The road has to be maintained in motorable condition throughout the
contract period.
Stage Payment: 90% of accepted rate shall be payable after construction
of road. Balance 10% shall be payable after period of completion.
2 H2 Stone masonry work in cement mortar (1:3) in substructure, retaining
walls, breast walls and parapets, culverts etc all complete as per drawing
and Technical Specifications section 1400 & 2706 of MORT&H including
providing weep hole of size 110mmx80mm or 110 mm diameter. (Rate is
inclusive of cement and form work as required)
H2.1 Random Rubble Masonry Cum 500.00 4,586.80 22,93,400.00
3 H3 Granular Sub-Base with Coarse Graded Material (Table: 400-2):-
Construction of granular sub base by providing coarse graded material,
spreading in uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with
vibratory roller to achieve the desired density, complete as per Technical
specifications clause 401 and Grading Table:400-1 of MORT&H as
decided by Engineer in Charge.
H3.1 For grading-I material Cum 800.00 2,649.66 21,19,728.00
H3.2 For grading-III material Cum 800.00 2,748.84 21,99,072.00
4 H4 Water Bound Macadem:- Providing, laying, spreading and compacting Cum 2000.00 2,974.48 59,48,960.00
stone aggregates of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling with
vibratory roller 8-10 tonnes in stages to proper grade and camber,
applying and brooming requisite type of screening/binding materials to fill
up the interstices of coarse aggregate, watering and compacting to the
required density all complete as per Technical Specifications clause
No.406 of MORT&H. By Mechanical means Grading-I (Using Screening
Crushable type such as Moorum or Gravel) Using Screening Type-A
(13.2mm Agg.)
5 H5 Dense Graded Bituminous Macadam:- Providing and laying dense
bituminous macadam with 100-120 TPH batch type HMP producing an
average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix of mix and filler, transporting the hot mix to work site,

Vol-II (Price Proposal) Page 16 of 17

Page 374 of 375


RVNL/BBB/Major Bridges/PK-4/Works
BHANUPALI-BILASPUR-BERI NEW RAIL LINE PROJECT
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
laying with a hydrostatic paver finisher with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desire compaction as per MORT&H
specification clause No.507 complete in all respect.
H5.1 For grading II (19 mm nominal size) Cum 400.00 10,367.96 41,47,184.00
6 H6 Prime Coat: Providing and applying primer coat with bitumen emulsion on Sqm 6000.00 30.18 1,81,080.00
prepared surfaces of granular base including clearing of road surfaces
and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means
all complete as per Technical Specifications Clause 502 of MORT&H.
7 H7 Tack Coat: Providing and applying tack coat with bitumen emulsion using Sqm 6000.00 10.78 64,680.00
emulsion pressure distributor at the rate of 0.20 Kg per Sqm on the
prepared bituminous/granular surface cleaned with mechanical broom all
complete as per Technical specification Clause 503 of MORT&H.
8 H8 Open-Graded Premix Surfacing: Providing, laying and rolling of open-
graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6
mm aggregates either using penetration grade bitumen or cut back or
emulsion to required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant, laying and
rolling with a smooth wheeled roller 8-10 tonne capacity, finished to
required level and grades all complete as per Technical Specifications
clause 510 of MORT&H.
H8.1 Mechanical method using Penetration grade Bitumen and HMP of Sqm 6000.00 167.08 10,02,480.00
appropriate capacity not less than 75 tonnes/hour.
9 H9 Seal Coat: Providing and laying seal coat sealing the voids in bituminous
surface laid to the specified levels, grade and cross fall using Type A and
B seal coats all complete as per Technical Specifications clause 511 of
MORT&H.
H9.1 Seal Coat - Type A Sqm 6000.00 74.38 4,46,280.00
Total for Bill No. H 2,19,84,596.50

Bill No. J: Environment Management Plan


Site Specific Rates
S. Item No. Description of Item Unit Quantity Rate Amount
No. (in Rs.) (in Rs.)
1 J1 Monitoring of Environmental Attributes during Construction Activity
J1.1 Air Quality (Ambient Air Quality monitoring, as per NAAQM guide lines)
and assess parameters such as Sulphur Dioxide (SO2), Oxides of
Nitrogen (NOX), Carbon Monoxide (CO), Hydro-Carbons (HC),
Suspended Particulate Matter (SPM), Respirable Particulate Matter
(RPM), Ammonia (NH3), Ozone (O3), Lead (Pb), Benzo (a) pyrene
(BaP), Arsenic (As) and Nickel (Ni)).
J1.1.1 Monitoring of Air Quality Each 50.00 14,420.42 7,21,021.00
Sample
2 J1.2 Noise Levels (Noise level monitoring for monitoring Noise level on db (A)
scale as per CPCB standard specifications)
J1.2.1 Monitoring of Noise Levels at Equipment Yards Each 50.00 21,640.11 10,82,005.50
Sample
3 J1.3 Water Quality (Water Quality (As per IS 10500 and IS 2296) for Each 50.00 9,108.08 4,55,404.00
parameters such as pH, BOD, COD, TDS, Pb, Oil & Grease and Sample
detergents for surface water, Water pH, TDS, Total hardness, Sulphate,
Chloride, Fe and Pb ).
Total for Bill No. J 22,58,430.50

Vol-II (Price Proposal) Page 17 of 17

Page 375 of 375