TPR Mould Toso Ceilling Wall Dan Ceilling 19 Sept
TPR Mould Toso Ceilling Wall Dan Ceilling 19 Sept
TPR Mould Toso Ceilling Wall Dan Ceilling 19 Sept
SLIDER
MATERIAL 100.00%
MILLING 70.00%
CNC 50.00%
HARDENT 50.00%
50.00%
GRINDING 50.00%
1 CNC AF
50.00%
HARDENT
EDM 30.00%
POLISHING 0.00%
50.00%
NOTE
INSERT CAVITY
CNC 50.00%
2 POLISHING 0.00%
50.00%
NOTE
INSERT CORE
CNC 50.00%
EDM 45.00%
POLISHING 0.00%
31.67%
3
31.67%
3
31.67%
NOTE
HOUSING
MILLING 50.00%
CNC 30.00%
40.00%
40.00%
NOTE
INSERT PIN
STD 0.00%
BUBUT 0.00% 0.00%
5 CNC
0.00%
NOTE
ASSY
SPOTONG 0.00%
ASSEMBELING 0.00%
6 0.00%
PHOLESING 0.00%
6 0.00%
0.00%
Resume
H1 CEILLING BRACKET PROJECT - MOLD MANUFACTURING PROGRESS
Part Name : H1 CEILLING BRACKET
Part No : 40101-COUEB-000
Updated :-
PROGRESS REPORT PHOTO
NO ITEM STATUS PLAN ( from 3D view )
SLIDER
MATERIAL 100.00%
MILLING 80.00%
CNC 60.00%
HARDENT 40.00%
45.00%
GRINDING 50.00%
1 CNC AF
30.00%
HARDENT
EDM 0.00%
POLISHING 0.00%
45.00%
NOTE
INSERT CAVITY
CNC 20.00%
31.67%
NOTE
INSERT CORE
CNC 60.00%
EDM 50.00%
POLISHING 0.00%
36.67%
3
36.67%
3
36.67%
NOTE
HOUSING
MILLING 50.00%
CNC 50.00%
68.33%
68.33%
NOTE
INSERT PIN
STD 100.00%
5 CNC 100.00%
100.00%
NOTE
ASSY
SPOTONG 0.00%
ASSEMBELING 0.00%
6 0.00%
PHOLESING 0.00%
Resume
EILLING BRACKET PROJECT - MOLD MANUFACTURING PROGRESS
PHOTO
ACT ( picture )
19-09-24
Bottom dan top plate Ceilling Slider,driver block,reel ceilling Ejector plate dan ejector retainer plate ceilling