S9i Server Installation Guide

S9i Server Installation


Guide
Document Version 0.1
Nov 2019
© Copyright Bitmain Technologies Holding Company 2007 – 2022. All rights reserved.
Bitmain Cayman (hereinafter referred to as ‘Bitmain’) reserves the right to make corrections,
modifications, enhancements, improvements, and other changes to its products and services at any time
and to discontinue any product or service without notice.
Customers should obtain the latest relevant information before placing orders and should verify that such
information is current and complete. All products are sold subject to Bitmain's terms and conditions of sale
supplied at the time of order acknowledgment.
Bitmain warrants performance of its products to the specifications applicable at the time of sale in accordance
with Bitmain's standard warranty. Testing and other quality control techniques are used to the extent
Bitmain deems necessary to support this warranty. Except where mandated by government requirements,
testing of all parameters of each product is not necessarily performed.
Bitmain assumes no liability for third-party applications assistance. Customers are responsible for their
products and applications using Bitmain components. To minimize the risks associated with customer
products and applications, customers should provide adequate design and operating safeguards.
Bitmain does not warrant or represent that any license, either express or implied, is granted under any
Bitmain patent right, copyright or other Bitmain intellectual property right relating to any combination,
machine, or process in which Bitmain products or services are used. Information published by Bitmain
regarding third-party products or services does not constitute a license from Bitmain to use such products or
services or a warranty or endorsement thereof. Use of such information may require a license from a third
party under the patents or other intellectual property of the third party, or a license from Bitmain under the
patents or other intellectual property of Bitmain.

-1-
S9i Server Installation Guide

Resale of Bitmain products or services with statements different from or beyond the parameters stated by
Bitmain for that product or service voids all express and any implied warranties for the associated Bitmain
product or service and is an unfair and deceptive business practice. Bitmain is not responsible or liable for any
such statements.
All company and brand products and service names are trademarks or registered trademarks of their respective
holders.
All text and figures included in this publication are the exclusive property of Bitmain, and may not be copied,
reproduced, or used in any way without the express written permission of Bitmain. Information in this
document is subject to change without notice and does not represent a commitment on the part of Bitmain.
Although the information in this document has been carefully reviewed, Bitmain does not warrant it to be
free of errors or omissions. Bitmain reserves the right to make corrections, updates, revisions or changes to
the information in this document.

Bitmain
Tel:+86-400-890-8855
www.bitmain.com

-2-
S9i Server Installation Guide

Table of Contents
1. Overview...................................................................................................................................................... 4
1.1 S9i Server Components.......................................................................................................................5
1.2 Specifications...................................................................................................................................... 6
2. Connecting to the Power Supply................................................................................................................. 7
3. Setting Up the Server................................................................................................................................... 8
4. Configuring the Server............................................................................................................................... 10
5. Monitoring Your Server............................................................................................................................. 11
6. Administering Your Server.........................................................................................................................12
6.1 Checking Your Firmware Version......................................................................................................12
6.2 Upgrading Your System.................................................................................................................... 12
6.3 Modifying Your Password................................................................................................................. 13
6.4 Restoring Initial Settings................................................................................................................... 13
Environmental Requirements........................................................................................................................14
Regulations.....................................................................................................................................................16

-3-
S9i Server Installation Guide

1. Overview

1. Overview
The S9i server is one of the products in Bitmain’s S9 miner series. All S9i servers are tested and configured
prior to shipping to ensure easy set up.

You must provide your own ATX power supply.

-4-
S9i Server Installation Guide

1. Overview

1.1 S9i Server Components

The S9i server main components and controller front panel are shown in the following figure:

-5-
S9i Server Installation Guide

1. Overview

1.2 Specifications

Hash Rate
S9i-13 TH/s, 13.5 TH/s, 14 TH/s, 14.5 TH/s
Power Consumption
1290 W (13 TH/s)
1310 W (13.5 TH/s)
1320 W (14 TH/s)
1365 W(14.5 TH/s)
Power Efficiency
99 J/TH (13 TH/s)
97 J/TH (13.5 TH/s)
94 J/TH (14 TH/s)
94.14 J/TH (14.5 TH/s)
Rated Voltage
11.60 ~13.00 V
Frequency
Auto-frequency
Network connection mode Ethernet
Operating temperature
0 - 40 °C
Storage temperature -40 - 85°C
Operating humidity
5%RH-95%RH, No condensation
Product weight (without package)
4.2 kg
Product dimensions
350mm(L) x 135mm(W) x 158mm(H)

-6-
S9i Server Installation Guide

2. Connecting to the Power Supply

2. Connecting to the Power Supply


Ten PCI-e connectors are located at the top of the S9i server for connecting the PSU as follows:

● Nine PCI-e connectors for the hash boards. Each hash board has three PCI-e connectors.
● One PCI-e connector located on the controller.

Each hashboard must be powered by the same PSU to prevent possible damage and instability.

To connect the power supply:

1. Connect PSU power cable connectors to each of the nine PCI-e connectors on the top of the S9i server,
ensuring that each hash board is powered by the same PSU.

A. Front fan (intake fans); B. Rear fan (exhaust fans); C. Miner model; D. Serial number (SN) of miner, to review
warranty status; E. Estimated hash rate of miner model; F. Rear fan connector; G. Front fan connector; H. Chain
#8 connector; I. Chain #7 connector; J. Chain #6 connector; K. 6-pin power connector; L. Control board chain
connector; M. 6-pin power connector

2. Connect a PSU power cable connector to the S9i PCI-e connector on the controller.
3. Connect the network cable to the ETH port.
4. To power up your S9i server, connect the PSUs to the power wall outlet.

If you are using more than one PSU,power up the PSU connected to the controller AFTER you have
Powered up the other PSU(s).

-7-
S9i Server Installation Guide

3. Setting Up the Server

3. Setting Up the Server


To set up the server:

The file IPReporter.zip is supported by Microsoft Windows only.

1. Go to the following site: https://shop.bitmain.com/support/download

2. Choose ‘Others’ and download the following file: IPReporter.zip


3. Extract the file.

The default DHCP network protocol distributes IP addresses automatically.

4. Right-click IPReporter.exe and run it as Administrator.


5. Select one of the following options:
■ Shelf, Step, Position – suitable for farm servers to mark the location of the servers.
■ Default – suitable for home servers.
6. Click Start.

-8-
S9i Server Installation Guide

3. Setting Up the server

7. On the controller board, click the IP Report button. Hold it down until it beeps (about 5 seconds).

The IP address will be displayed in a window on your computer screen.

8. In your web browser, enter the IP address provided.


9. Proceed to login using root for both the username and password.
10. In the Network section, you can assign a DHCP IP address (optional).
11. Click Save & Apply.

-9-
S9i Server Installation Guide

4. Configuring the Server

4. Configuring the Server


Setting Up the Pool

To configure the server:

1. click General Settings. (Here takes S9i-14T running under the firmware with “Normal” mode as an example)

2. Set the options according to the following table:

Option Description

Pool URL Enter the URL of your desired pool.

The S9i server can be set up with three mining pools, with decreasing
priority from the first pool (pool 1) to the third pool (pool 3).
The pools with low priority will only be used if all higher priority pools are
offline.

Worker Your worker ID on the selected pool.

Password The password for your selected worker.

3. Click Save & Apply to save and restart the server.

- 10 -
S9i Server Installation Guide

5. Monitoring Your Server

5. Monitoring Your server


To check the operating status of your server:

1. Click the status marked below. (Here takes S9i-14T running under the firmware with “Normal” mode as an example)

2. monitor your server according to the descriptions in the following table:


Option Description

ASIC# Number of chips detected in the chain.

Frequency ASIC frequency setting.

GH/S(RT) Hash rate of each hash board ( GH/s)

Temp(PCB) Temperature of each hash board (°C).(Applied only to server with fixed frequency)

Temp(Chip) Temperature of the chips on each hash board (°C).

ASIC status One of the following statuses will appear:

● O - indicates OK
● X - indicates error
● - - indicates dead

Note: The S9i server is with automatic frequency. Firmware will stop running when the Temp
(PCB) reaches to 90℃,there will be an error message “Fatal Error: Temperature is too high!”
shown in the bottom of kernel log page.

- 11 -
S9i Server Installation Guide

6. Administering Your Server

6. Administering Your Server


6.1 Checking Your Firmware Version
To check your firmware version:

1. In System, click the Overview tab.


2. File System Version displays the date of the firmware your server use. In the example below, the server is
using firmware version 20190730.

6.2 Upgrading Your System

Make sure that the S9i server remains powered during the upgrade process. If power fails before
the upgrade is completed, you will need to return it to Bitmain for repair.

To upgrade the server’s firmware:

1. In System, click Upgrade.

- 12 -
S9i Server Installation Guide

6. Administering Your Server

2. For Keep Settings:


■ Select the check box to keep your current settings (default).
■ Clear the check box to reset the server to default settings.
3. Click the (Browse) button and navigate to the upgrade file. Select the upgrade file, then click
Flash image. A message appears notifying you if the S9i firmware can be upgraded and if yes, will then
proceed to flash the image.
4. When the upgrade is completed, the following message appears:

5. Click one of the following options:


■ Reboot - to restart the server with the new firmware.
■ Go Back - to continue mining with the current firmware. The server will load the new firmware next
time it is restarted.

6.3 Modifying Your Password


To change your login password:

1. In System, click the Administration tab.


2. Set your new password, then click Save & Apply.

6.4 Restoring Initial Settings


To restore your initial settings

1. Turn on the server and let it run for 5 minutes.


2. On the controller front panel, press and hold the Reset button for 10 seconds.

Resetting your server will reboot it and restore its default settings. The red LED will automatically
flash once every 15 seconds if the reset is operated successfully.

- 13 -
S9i Server Installation Guide

Environmental Requirements

Please run your server in accordance with the following requirements


1. Basic Environmental Requirements:
1.1. Climatic Conditions:
Description Requirement
Operating Temperature 0-40℃
Operating Humidity 10-90%RH (non-condensing)
Storage Temperature -20-70℃
Storage Humidity 5-95%RH(non-condensing)
Altitude <2000m

1.2. Site Requirements of the Server Running Room:


Please keep the server running room away from industrial pollution sources:
For heavy pollution sources such as smelters and coal mines, the distance should be more than 5km.
For moderate pollution sources such as chemical industries, rubber and electroplating industries, the distance
should be more than 3.7km.
For light pollution sources such as food factories and leather processing factories, the distance should be more
than 2km.
If unavoidable, the site should be chosen in the perennial upwind direction of the pollution source.
Please do not set your location within 3.7km from the seaside or the salt lake. If unavoidable, it should be built
as airtight as possible, equipped with air conditioning for cooling.
1.3. Electromagnetic Environmental Conditions:
Please keep your site away from transformers, high-voltage cables, transmission lines and high-current
equipment, for example, there should be no high-power AC transformers (>10KA) within 20 meters, and no
high-voltage power lines within 50 meters.
Please keep your site away from high-power radio transmitters, for example, there should be no high-power
radio transmitters (>1500W) within 100 meters.

2. Other Environmental Requirements:


The server running room shall be free of explosive, conductive,magnetically conductive and corrosive dust. The
requirements of mechanical active substances are shown below:
2.1 Requirements of Mechanical Active Substances

Mechanical Active Substance Requirement


Sand <= 30mg/m3

Dust (suspended) <= 0.2mg/m3

Dust (deposited) <=1.5mg/m2h

- 14 -
S9i Server Installation Guide

2.2 Requirements of Corrosive Gas

Corrosive Gas Unit Concentration


H2S ppb <3
SO2 ppb < 10
Cl2 ppb <1
NO2 ppb < 50
HF ppb <1
NH3 ppb < 500
O3 ppb <2

Note: ppb (part per billion) refers to the unit of concentration,1ppb stands for the volume ratio of
part per billion.

- 15 -
S9i Server Installation Guide

Regulation:

FCC Notice (FOR FCC CERTIFIED MODELS):

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This
device may not cause harmful interference, and (2) this device must accept any interference received, including
interference that may cause undesired operation.

Note:

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part
15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference
when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate
radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause
harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause
harmful interference in which case the user will be required to correct the interference at his own expense.

EU WEEE: Disposal of Waste Equipment by Users in Private Household in the European Union

This symbol on the product or on its packaging indicates that this product must not be disposed
of with your other household waste. Instead, it is your responsibility to dispose of your waste
equipment by handling it over to a designated collection point for the recycling of waste
electrical and electronic equipment. The separate collection and recycling of your waste
equipment at the time of disposal will help to conserve natural resources and ensure that it is
recycled in a manner that protects human health and the environment. For more information
about where you can drop off your waste equipment for recycling, please contact your local city office, your
household waste disposal service or the shop where your purchased the product.

台湾 ROHS:
設備名稱: S9i 服务器
有害物质

單元 鉛 汞 鎘 六價鉻 多溴聯苯 多溴二苯醚


(Pb) (Hg) (Cd) (Cr+6) (PBB) (PBDE)

外殼 ○ ○ ○ ○ ○ ○

電路板組件 — ○ ○ ○ ○ ○

其他線材 — ○ ○ ○ ○ ○

備考 1.〝超出 0.1 wt %〞及〝超出 0.01 wt %〞係指限用物質之百分比含量超出百分比含量基準


值。
備考 2.〝○〞係指該項限用物質之百分比含量未超出百分比含量基準值。
備考 3.〝-〞係指該項限用物質為排除項目

- 16 -

You might also like