Annual Production Report produced by Zahid Ahmed

250k
AC System: 0.5% Shading: 1.5%
Inverters: 1.5%
200k
Reflection: 3.2%
Clipping: 0.0%

150k Wiring: 1.6%


kWh

Mismatch: 4.1% Soiling: 2.0%


100k

Irradiance: 0.4%

50k

Temperature: 6.8%
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

© 2022 Folsom Labs 1/4 June 22, 2022


Annual Production Report produced by Zahid Ahmed

© 2022 Folsom Labs 2/4 June 22, 2022


Annual Production Report produced by Zahid Ahmed

© 2022 Folsom Labs 3/4 June 22, 2022


Annual Production Report produced by Zahid Ahmed

© 2022 Folsom Labs 4/4 June 22, 2022