• Answer: The primary objective is to train and certify 15 participants as BPC SMEs to meet
annual demands and create a succession plan.
2. How many participants will undergo the training, and what is their expected outcome upon
completion?
• Answer: 15 participants will be trained, and the outcome is their certification as BPC SMEs.
3. Who will be the primary resources involved in delivering the training, and what is their time
allocation?
4. What is the estimated timeline for completing the BPC SME training, and what are the major
milestones?
• Answer: The project will take 4 weeks. Major milestones include the kickoff, mid-term
assessments, hands-on training, and final certification.
5. What are the in-scope deliverables for this project?
6. What are the identified risks for this project, and what mitigation strategies are in place to
address them?
7. What are the assumptions made in this project regarding participants and organizational
support?
• Answer: Assumptions include participant availability for the full 4 weeks and organizational
support for certification.
8. Can you outline the key constraints that might affect the project’s execution?
• Answer: Constraints include the 4-week duration, limited instructor time (0.10 FTE), and a
focus on SME-level training only.
9. What social impact does this project aim to achieve, particularly at the Philippine site?
• Answer: The project builds local BPC capability, ensuring operational continuity and
reducing reliance on external resources.
10. How does the succession plan ensure the continuity of BPC expertise beyond the training?
• Answer: The succession plan establishes a pipeline of newly certified SMEs to meet future