Perhitungan Settlement Tanah.

ISI HANYA PADA HURUF WARNA MERAH SAJA

CALCULATION OF SETTLEMENT OASIS PROJECT PT DJARUM KUDUS PROJECT


B(m) : 5 (assumption) LOCATION : DB6
P(t/m2) : 8 (assumption)
Water Level (m) : 0
where : b1 = Tan-1((-X-B/2)/Z)
S= Cc.H Po + dp dp = (P/p)x(2e+Sin(2e)+Cos(2f) b2 = Tan-1((-X+B/2)/Z)
---------- log ---------- e = (b2-b1)/2 Edge -> X = B/2
1+eo Po f = (b2+b1)/2 Center -> X = 0

Layer Depth Thickness gt g't eo Cc Cv


(m) (m) (t/m3) (t/m3) assumption
1 0 -5 5 1.859 0.859 0.971 0.136 0.001
2 5 - 10 5 1.871 0.871 0.963 0.122 0.001
3 10 - 15 5 1.76 0.76 1.025 0.282 0.001
4 15 - 20 5 2.236 1.236 0.315 0.649 0.001
5 20 - 25 5 1.71 0.71 1.144 0.398 0.001
6 25 - 30 5 1.998 0.998 0.696 0.249 0.001
7 30 - 35 5 1.763 0.763 1.17 0.221 0.001
8 35 - 40 5 1.714 0.714 1.395 0.225 0.001
Average Cv' 0.001

Layer Depth Center of Thickness g't Po


(m) Layer (Z) H
(m) (m) (t/m3) (t/m2)
1 0 -5 2.5 5 0.859 2.1475
2 5 - 10 7.5 5 0.871 6.4725
3 10 - 15 12.5 5 0.76 10.55
4 15 - 20 17.5 5 1.236 15.54
5 20 - 25 22.5 5 0.71 20.405
6 25 - 30 27.5 5 0.998 24.675
7 30 - 35 32.5 5 0.763 29.0775
8 35 - 40 37.5 5 0.714 32.77
40

Center of Settlement
Layer Depth Layer (Z) Edge
(m) (m) b1 b2 e f dp Se (m)
1 0 -5 2.5 -1.107 0 0.554 -0.554 3.838 0.154
2 5 - 10 7.5 -0.588 0 0.294 -0.294 2.673 0.047
3 10 - 15 12.5 -0.381 0 0.190 -0.190 1.847 0.049
4 15 - 20 17.5 -0.278 0 0.139 -0.139 1.381 0.091
5 20 - 25 22.5 -0.219 0 0.109 -0.109 1.096 0.021
6 25 - 30 27.5 -0.180 0 0.090 -0.090 0.906 0.011
7 30 - 35 32.5 -0.153 0 0.076 -0.076 0.771 0.006
8 35 - 40 37.5 -0.133 0 0.066 -0.066 0.671 0.004
Total 0.383
Center of Settlement
Layer Depth Layer (Z) Center
(m) (m) b1 b2 e f dp Sc (m)
1 0 -5 2.5 -0.785 0.785 0.785 0.000 6.546 0.210
2 5 - 10 7.5 -0.322 0.322 0.322 0.000 3.167 0.054
3 10 - 15 12.5 -0.197 0.197 0.197 0.000 1.985 0.052
4 15 - 20 17.5 -0.142 0.142 0.142 0.000 1.436 0.095
5 20 - 25 22.5 -0.111 0.111 0.111 0.000 1.123 0.022
6 25 - 30 27.5 -0.091 0.091 0.091 0.000 0.921 0.012
7 30 - 35 32.5 -0.077 0.077 0.077 0.000 0.780 0.004
8 35 - 40 37.5 -0.067 0.067 0.067 0.000 0.677 0.004
Total 0.451

TIME OF CONSOLIDATION
t = Tv x H2/Cv'
where :
Tv = (p/4) x (U[%]/100)2 ( U[%]<53% )
= 1.781-0.933 log (100-U{%] ( U[%]>53% )
Settlement
U Tv time of settlement Center Edge Center Edge
t Sc Se Year Avg Sc Avg Se
(%) (day) (year) (cm) (cm) cm/year cm/year
10 0.008 1454 4.0 4.51 3.83 0 - 4.0 1.12 0.95
20 0.031 5818 16.2 9.02 7.66 4.0 - 16.2 0.37 0.32
30 0.071 13090 36.4 13.53 11.48 16.2 - 36.4 0.22 0.19
40 0.126 23271 64.6 18.04 15.31 36.4 - 64.6 0.16 0.14
50 0.196 36361 101.0 22.56 19.14 64.6 - 101.0 0.12 0.11
60 0.286 53014 147.3 27.07 22.97 101.0 - 147.3 0.10 0.08
70 0.403 74601 207.2 31.58 26.80 147.3 - 207.2 0.08 0.06
80 0.567 105026 291.7 36.09 30.62 207.2 - 291.7 0.05 0.05
90 0.848 157037 436.2 40.60 34.45 291.7 - 436.2 0.03 0.03
Settlement (cm)

Sc
45.00
Se
40.00
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0
Time (Years)