K038-Pic-Checklist For Hammering Drill Machine

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project Management Group

CHECKLIST FOR HAMMERING DRILL MACHINE

Project Name: Equipment No.:


Contractor Name: Inspection Date:
Equipment Specs.: Next Inspection Date:

SL NO DESCRIPTION YES NO REMARKS

Equipment double insulated. (written in the


1
machine body)

Equipment free from any defect like broken


2
handle, broken parts etc

3 Electrical cable free from defects.

Industrial plug top available and in working


4
condition.

5 Drilling Bit without any damage.

Drilling bit holder is availabe and in working


6
condition

7 Switch in working condition

Name Signature Date


Checked by Contractor Safety Officer

Name Signature Date


Checked by Contractor PNM Engineer & Electricean

CBRE Reviewed Accepted…………………. Rejected……………..


Name Signature Date
Checked by CBRE / Client

Format No. K038-OHS-HDM-Ch-39/Rev00/May 2019

CBRE South Asia Pvt Ltd Page 1 of 1

You might also like