013 Internal Rotary Inspection System

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

ASIC OFFSHORE & MARINE SDN.BHD.

Lot G02-G07, Level 3,


Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

INTERNAL ROTARY INSPECTION SYSTEM (IRIS)

Nidhin Venkatesh
Rev. Rev. Date Description Prepared By Reviewed By Approved By

Page 1 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

INDEX

Section Description Page

1 Scope 04

2 Reference 04

3 Personnel Qualification 04

4 Principle Of Iris System 05

5 Components Of The Iris System 05

6 Pre Inspection Preparation 05

7 Site Requirements 06

8 Iris Inspection Procedure 06

Appendix 1 Data Recording 07

Appendix 2 Data Analysis 08

Acceptance Criteria 08

Page 2 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

Reporting Of Results 08

Attachment Report Format 09

1.0 SCOPE:

1.1 This procedure describes the method of applying Internal Rotary Inspection System
(IRIS) to test heat exchanger/boiler tubing.

1.2 This procedure is suitable for tube having tube ID 0.49” to 3” and wall thickness 12.5mm
to 75mm.

2.0 REFERENCES:

2.1 ASME Section V, 2019 Edition Non Destructive Examination.

Guidelines for Personnel Qualification &


2.2 ASNT SNT TC –1A, 2016 Edition
Certification.

2.3 QE HSE Procedures Procedure for General Safety Practices.

CLIENT SPECIFICATIONS
2.4

3.0 PERSONNEL QUALIFICATION:

3.1 The personnel who operate the IRIS test equipment with the exception of the probe
positioner / puller technician shall be a minimum Level-II in Ultrasonic Testing Method.

3.2 Certification of the personnel shall be according to PCN/ASNT written practice.

3.3 The evaluation of the result of the IRIS must be conducted by personnel qualified to at
least Level II.

Page 3 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

4.0 PRINCIPLE OF IRIS SYSTEM:

4.1 The operating principle of the system is based upon the ultrasonic pulse echo Immersion
technique.

4.2 Two pulses (inner wall reflection and outer wall reflection) reflected back to the
transducer generate electrical signals which are separated by the time required to make a
round trip through the tube walls.

4.3 Since this time proportional to the wall thickness the thickness can be measured by
measuring the time delay between the inner and outer wall reflection.

5.0 COMPONENTS OF THE IRIS SYSTEM:

The IRIS system model MS 5800 manufactured by M/s R/D Tech Canada or equivalent working
on the IRIS principle.

The system shall be consisting of following three functional elements:

5.1 Water Supply unit.

5.2 The inspection head assembly.

5.3 Laptop with IRIS inspection software i.e. Multiview Software.

6.0 SURFACE PREPARATION:

6.1 All tubes inner surface shall be adequately cleaned to remove any dust, loose foreign
particles, internal deposits or contaminants by a suitable process such as pressurized
water jet cleaning.

6.2 It is also recommended to clean the outer surface of tube if possible.

7.0 SITE REQUIREMENT:

7.1 IRIS system requires a 110-240 V, 50-60 Hz AC supply at work location.

Page 4 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

7.2 The main requirement of the IRIS is the provision of a clean, relatively high pressure
water supply.

7.3 The IRIS turbine requires a drive pressure of maximum 45 PSI to operate system at the
recommended 1800 RPM.

8.0 IRIS INSPECTION PROCEDURE:

8.1 The IRIS system shall be calibrated on the standard calibration sample as per Standard
operating procedure.

8.2 Calibration standards shall be manufactured from a tubing of the same material
specification, same heat treatment, and same nominal size.

8.3 Inspection head should be connected to the water supply kit.

8.4 The inspection head with centering device should be installed within the tube.

8.5 Then water valve can be opened.

8.6 The operator shall check all water hose and electrical connections are made good, and
that the electronic units are protected from spray.

8.7 The inspection is conducted with the probes and turbine assembly located at the far end
of the tube.

8.8 The assembly is pushed to the end of the tube by feeding the hose through the end plate
of the adaptor.

8.9 To start the inspection, the assembly is gradually pulled along the tube towards the
operator.

8.10 The rate at which the inspection head assembly is moved along the tube governs the
degree of coverage of the tube, if flooding is there water supply should be turned off.

Page 5 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

8.11 The inspection head assembly can then be withdrawn from the tube.

8.12 The above procedure can be repeated for as many tubes are to be inspected during the
operating session.

8.13 The equipment dismantle procedures are to be inspected during the operating session.

8.14 The equipment dismantle procedures are the reverse of those carried out during the
setup of the inspection.

8.15 The pulling speed of the probe shall be kept constant during the inspection.

8.16 The pulling speed shall be at 40-80mm/s depending on the rotating speed of the turbine.

9.0 DATA RECORDING:

9.1 For the purposes of this procedure all test results will be recorded on suitable data
acquisition system.

9.2 Each data storage unit shall contain the following information.

9.2.1 Positive identification of the item under test.

9.2.2 Data storage unit number.

9.2.3 A reference to the contents.

9.2.4 Date.

9.2.5 Probe identification.

9.3 Each trace shall be identified according to zone / row / tube number as applicable.

10.0 DATA ANALYSIS:

10.1 All indications shall be evaluated based on the client’s acceptance criteria.

Page 6 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

10.2 All indications shall be evaluated and reported in the form of wall thickness loss.

11.0 ACCEPTANCE CRITERIA:

11.1 The acceptance criteria or rejection of tubes based on wall loss is at the discretion of the
client.

12.0 REPORTING RESULTS:

12.1 Report shall be prepared with the information gathered using the computer data files.

12.2 Report all tubes wall with a wall loss reading and all reports issued to the clients shall be
signed by the person performing the inspection and endorsed by the Inspector.

12.3 The test reports to contain the following information

12.3.1 Client's name and address.

12.3.2 Information of equipment tested.

12.3.3 Information of test instruments used.

12.3.4 Information on instruments settings.

12.3.5 Date and place of inspection.

12.3.6 Test System Calibration.

12.3.7 Inspection Summary.

12.3.8 Job reference Number, Comments,

12.3.9 Signature of testing officer and Inspector.

Page 7 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

ATTACHMENT
REPORT FORMAT

Page 8 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

Page 9 of 10
ASIC OFFSHORE & MARINE SDN.BHD. Lot G02-G07, Level 3,
Platinum Sentral, Jalan Stesen Sentral 2, Kuala Lumpur Sentral 50470 Kuala Lumpur, MALAYSIA Tel.:
(+603) 2721 2183 | Fax: (+603) 2721 2184 | Website: www.asicoffshore.com

ASIC Doc. Name: NDT-UT - IRIS ASIC Rev: Page


ASIC Doc. No.: ASIC‐ED/OP/WI/NDT-UT-IRIS-013 00

Page 10 of 10

You might also like