0% found this document useful (0 votes)
16 views1 page

Konspro Thifal

Uploaded by

anwar soleh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

Konspro Thifal

Uploaded by

anwar soleh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROFILE CONSTRUCTION

SIDE VIEW

NAVAL ARCHITECTURE
INSTITUT TEKNOLOGI KALIMANTAN

TOP DECK

NAVIGATION DECK

BRIDGE DECK SUPERSTRUCTURE


BOAT DECK

POOP DECK

FORECASTLE
TOP DECK
DECK
DWL

SB

SB

SB

SB

SB

SB

SB
1500.0000

Baseline
150 155 170 175 180 185 190
AP AP MS FP

20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200
-5 0 5 10 15 115
ACCOMMODATION
FRAME SPACING : 600 mm DECK NAVIGATION DECK
FRAME SPACING : 600 mm FRAME SPACING : 600 mm

SB

SB

SB

SB

SB

SB

SB
MAIN FRAME : L 200 X 100 X 12 MAIN FRAME : L 160 X 80 X 14

MAIN FRAME : L 160 X 80 X 12

WEB FRAME : T 600 X 250 X 12 WEB FRAME : T 350 X 100 X 12

STRINGER : T 350 X 100 X 12


9
STRINGER : T 600 x 350 x 12
9
WEB FRAME : T 360 X 180 X 12

9
CANTILEVER : T 180 X 70 X 12

CANTILEVER : T 170 X 50 X 12

SENTA : T 360 X 180 X 12


9
9
SB

SB

SB

SB

SB

SB

SB

SB

SB

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT

DT
9
BHD

BHD

BHD

DT
WT

WT

DT
WT
9

DT

DT
90 95

DT
100 105
130 135 140

DT

SB
9 9 9 9

SB
9 9 9 9 10 10 10 10 10 10 10 10 10 10 10
POOP DECK

SB
9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10

BOAT DECK

SB
9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10
6000.0000

SB

SB

SB

SB

SB

SB

SB

SB

SB
9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10

SB

SB

SB

SB

SB

SB
10 10 10 10 10 10 10 10 10 10 10 10

9 9 9 9
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200
9 9 9 9 9 9

9 9 9 9 9 9
FRAME SPACING : 600 mm
FRAME SPACING : 600 mm FRAME SPACING : 600 mm
9 9 9 9 9 9

9 9 9 9 9 9

MAIN FRAME : L 160 X 80 X 12


MAIN FRAME : L 200 X 100 X 12 MAIN FRAME : L 160 X 80 X 14

15 45 50 55 60 65 70 75
-5 0 5 10 20 25 30 35
WEB FRAME : T 600 X 250 X 12

WEB FRAME : T 350 X 100 X 12


WEB FRAME : T 360 X 180 X 12

STRINGER : T 600 x 350 x 12


STRINGER : T 350 X 100 X 12

SENTA : T 360 X 180 X 12

CANTILEVER : T 170 X 50 X 12 CANTILEVER : T 180 X 70 X 12

DOUBLE BOTTOM INNER BOTTOM/BOTTOM LONGITUDINAL


SF
SF

SF
SF
SF

SF
SF

SF
SF

SIDE GIRDER
WT F

SF

SF
SF

SF
SF
SF

SF

SF
SF

SF
WEB FRAME
SF

SF

SF
SF

SF
MAIN FRAME

SF
SF

SF
SF
10 10 10 10 10 10 10 10 10 10

SF
LAJUR LAS
PRINCIPAL DIMENSION

SF
SF

SF
10 10 10 10 10 10 10 10 10 10 10 10

SF

SF
10 10 10 10 10 10 10 10 10 10 10 10 10 TYPE TANKER
SF

10 10 10 10 10 10 10 10 10 10 10 10 10 10 CLASS BKI

10
10 LENGTH PERPANDICULAR 108 METRE
BREADTH 20.52 METRE
DEPTH 13.2 METRE
DRAUGHT 9.28 METRE
COEFFISIEN BLOCK 0.783
FRAME SPACING : 600 mm INNER BOTTOM/BOTTOM LONGITUDINAL DEADWEIGHT 19100 TON
FRAME SPACING : 600 mm FRAME SPACING : 600 mm

GROSS TONNAGE 15634.06


SIDE GIRDER
NET TONNAGE 6307.123
MAIN FRAME : L 160 X 80 X 12
MAIN FRAME : L 200 X 100 X 12 MAIN FRAME : L 160 X 80 X 14
WEB FRAME
HOLD CRUDE OIL

WEB FRAME : T 600 X 250 X 12 MAIN FRAME HOLD CAPACITY 23747.618 CUBIC METRE
WEB FRAME : T 350 X 100 X 12
WEB FRAME : T 360 X 180 X 12

LAJUR LAS
STRINGER : T 600 x 350 x 12
STRINGER : T 350 X 100 X 12

SENTA : T 360 X 180 X 12

CANTILEVER : T 170 X 50 X 12 CANTILEVER : T 180 X 70 X 12


INSTITUT TEKNOLOGI KALIMANTAN
JURUSAN SAINS, TEKNOLOGI PANGAN DAN KEMARITIMAN
PROGRAM STUDI TEKNIK PERKAPALAN

DETAIL CONSTRUCTION
KERTAS : A0/1:200 TTD KET :

DIGAMBAR : AHMAD THIFAL HABIBURRAHMAN

DIPERIKSA : ALAMSYAH, S.T.,M.T MK : DESAIN KONSTRUKSI KAPAL

DISETUJUI : ALAMSYAH, S.T.,M.T. KODE MK : TP 201427 NIM : 09201002

You might also like