0% found this document useful (0 votes)
156 views39 pages

PLATFORM WALL DESIGN-f

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
156 views39 pages

PLATFORM WALL DESIGN-f

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 39

Ref.

No.:

Doc.
Client: SOUTH WESTERN RAILWAY
No.

Construction of Electrified Double Line Track between Penukonda


Project: Junction (KM 136.694) to Dharmavaram (KM 176.600) including
Telecommunication & Electrical works

DESIGN OF PLATFORM WALL

ASEEF
Digitally signed by
Digitally signed by ASEEF SHEIKH
MEHUL PATEL
DN: cn=ASEEF
MEHUL DN: cn=MEHUL PATEL,
o=GEO DESIGNS AND
RESEARCH PVT LTD, ou,
SHEIK
SHEIKH, o=DESIGN
DIRECTOR, ou,

PATEL
email=DESIGNBRIDGEE email=ASEEFSHEIKH
[email protected],

H
c=IN
@GMAIL.COM, c=IN
Date: 2024.08.10 Date: 2024.08.10
09:42:55 +05'30' 09:42:34 +05'30'
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

TOP WIDTH = 400

Formation level R.L. 1.602

EARTH FILL SIDE

Bed level R.L. 0

Top of foundation R.L. -0.25


Bottom of foundation R.L. -
0.55
0
325 300
400

TOTAL WIDTH OF FOUNDATION = 1025 MM


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

INPUT DATA

Reduced levels

Top of wing wall 1.60


Top of foundation -0.25
Bottom of foundation -0.55
R.L of bed level 0.00
Proposed formation level 1.60

Wing wall details

Height of wall from top of foundation 1.852 m


Prop. top width 0.40 m
Front offset in wall 0.00 m
Back batter ( 1 H : ? V) 0
Int. front batter ( 1 H : ? V) 0.00
Second front batter ( 1 H : ?V) 0.00
Height of second batter 0.93 m
TYPE OF STRUCTURE RCC/PCC

Foundation details

Foundation block depth (below batter) 0.30 m


Foundation batter ( 1V : ?H) / steps no & distance 0.0000
Foundation front offset 0.30 m
Back offset of foundation 0.33 m

Earth pressure details


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Angle of friction of wall with soil ( d ) 10.6667 deg 0.186 rad


Passive height from bottom of foundation 0.55 m
Type of soil DRY
Coff of friction ( m ) 0.58
Angle of repose of soil back ( f ) 32 deg 0.559 rad
Angle of repose of soil front ( f ) 30 deg 0.524 rad
Angle of surcharge ( i ) 0 deg 0.000 rad
Cohesion 0.00 t/m2
Density of front soil 1.80 t/m3
Density of front soil with factor of safety 0.60 t/m3
Density of back fill 1.80 t/m3
Density of submerged soil 0.80 t/m3
F.O.S For Passive Earth Pressure 3.00
Front delta 10 deg 0.175 rad
Angle of back batter ( a ) 0.000 rad
Angle of front batter ( a ) 0.000 rad
SBC of soil 10.00 t/m2
SBC of soil in earthquake 15.00 t/m2 ( as per table 5 of IITK-RDSO guidelines for Seismic
Design of Railway Bridges page-35)
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Loading details

Live load surcharge 0.61 t/m2


Dead load surcharge 6.20 t/m2
Distance form c/l of track to back face of wall 2.400 m
Width of sleeper 2.74 m
Depth of ballast cushion 0.350 m
Depth from formation lvl. to top of wall 0.00 m
Density of CONCRETE 2.50 t/m3
Total length 550.00 m
TYPE OF WALL STRAIGHT RETAINING WALL / RETURN WALL
Grade of concrete M 20 N/mm2

Seismic parameter :-
Zone = III
Z = 0.16
Type Of Soil For Foundation = MEDIUM SOIL
R 2.5
Sa/g 2.5
I = 1.00

2
Permissible comp. stress 760 t/m
2
Permissible tensile stress -68.0 t/m
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Result
Stresses in wall
Normal case
1) At Int. checking level
P max = 5.17 t/m2 SAFE
P min = -0.34 t/m2 SAFE
2) At top foundation
P max = 28.91 t/m2 SAFE
P min = -18.57 t/m2 SAFE

Foundation pressure
Normal case

P max = 6.42 t/m2 SAFE

P min = 1.71 t/m2 SAFE


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Foundation pressure

Normal case + Buoyancy

P max = 6.27 t/m2 SAFE

P min = 1.57 t/m2 SAFE

Factor of safety Normal

1) Against overturning = 2.06 SAFE

2) Against sliding = 1.77 SAFE

Factor of safety Normal case + Buoyancy

1) Against overturning = 2.00 SAFE

2) Against sliding = 1.70 SAFE


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

1 Active earth pressure

For calculation of active earth pressure on wall, Coulomb's Theory will be used.
following value will be assumed.
(As per Cl 5.7.1 Sub structure)
Ka = cos^2(f - a)

cos^2(a) cos(a + d ) [1+ sin(f + d) sin(f - I ) ] ^2


cos(a+ d) cos (a - I)

a = 0.000 rad
f = 0.559 rad
a = 0.000 rad
d = 0.1862 rad
i = 0.000 rad
Ka = 0.284
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

i
Horizontal component of active earth pressure
Pah = Pa X cos( a + d )
Acting at Y1= (h/3) above section considered
a
Vertical component of active earth pressure
Pav = Pa X sin( a + d )
Pah Acting at Y1 X cot (90-a) from face of wall
a
Y1 =h /3 d
Pa
Pav f
Earth pressure due to seismic effect

(As per Cl 9.4.1 of IRS Code for EQ Resistant design of railway bridges)
Ah = 0.080
Av = 0.053
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

(As per Cl 22.1.1 of IRS Code for EQ Resistant design of railway bridges)
Case-1
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.053

( 1 + A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)

l = 0.0758
Ca = 0.348

Case-2
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.053

( 1 + A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)

l = 0.0843
Ca = 0.354
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Case-3
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.053

( 1 - A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)

l = 0.0843
Ca = 0.313

Case-4
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.053

( 1 - A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)

l = 0.0758
Ca = 0.269
Final Ca = 0.354
Dynamic increment = Ca - Ka = 0.069
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

1.(i) Active earth pressure at int. checking level

Pa = Ka X W X h X h
2
Where h = 0.926 m . 0
Pa = 0.5 X 0.28 X 1.8 X 0.926 X 0.926
= 0.219 t
Horizontal component

Pah = 0.22 X cos ( 0 + 0.18617 ) = 0.22 t/m


Will act at = Y = 0.30867 m
Vertical component

Pav = 0.22 X sin ( 0+ 0.18617 ) = 0.04 t/m


Will act at = X = 0.31 X cot(1.57- 0) = 0.00 m

1.(ii) Active earth pressure at top of foundation

Pa = Ka X W X h X h
2
Where h = 1.852 m . 0
Pa = 0.5 X 0.28 X 1.8 X 1.852 X 1.852
= 0.88 t
Horizontal component

Pah = 0.88 X cos ( 0 + 0.18617 ) = 0.86 t/m


Will act at = Y = 0.61733 m
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Vertical component

Pav = 0.88 X sin ( 0+ 0.18617 ) = 0.16 t/m


Will act at = X = 0.62 X cot(1.57- 0) = 0.0005 m

1.(iii) Active earth pressure at bottom of foundation

Pa = Ka X W X h X h
2
Where h = 2.15 . 0
Pa = 0.5 X 0.284 X 1.8 X 2.15 X 2.152
= 1.18 t
Horizontal component
Pah = 1.18 X cos ( 0 + 0.18617 ) = 1.16 t/m
Will act at = Y = 0.72 m

Vertical component
Pav = 1.18 X sin ( 0.00 + 0.18617 ) = 0.22 t/m
Will act at = X = 0.72 X cot(1.57- 0) = 0.000 m
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

2 Earth pressure due to surcharge


2.(i) At int. checking level

FOR STRAIGHT RETURN


(AS per Cl 5.8.3 of Sub Structure)
2.400

0 1.03
Formation level
B= 2.74
D 1.38

0.926
45 0

h1 -0.10
Checking level

Psur. = ( S + V ) X h1 X Ka Live Load Sur =S= 0.614 t/m2


( B + 2D ) Dead Load Sur=V= 6.2 t/m2
D= 1.38 m
Psur. = 0.00 t/m B= 2.74 m
h1 = 0.00 m
( assuming that psur will act horz. at h1/2 height as per CL 5 . 8 . 3 )
Y1 = h1 / 2 = 0.00 m
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Horizontal component
Pah = 0.00 X cos ( 0.000 + 0.186 ) = 0.00 t/m
Will act at = Y = 0.000 m

Vertical component
Pav = 0.00 X sin ( 0.00 + 0.186 ) = 0.00 t/m
Will act at = X = 0.400 m
Active Dynamic earth pressure due to Uniform Surchage
Psur. = ( S + V ) X h1 X( Ca -Ka) Live Load Sur =S= 0.614 t/m2
( B + 2D ) Dead Load Sur=V= 6.2 t/m2
D= 1.38 m
Psur. = 0.00 t/m B= 2.74 m
h1 = 0.00 m
( assuming that psur will act horz. at h1/2 height as per CL 5 . 8 . 3 )
Y1 = h1 / 2 = 0.00 m

FINAL
Psur. H = 0 H = 0

Psur. V = 0.000 H = 0.400


Active Dynamic earth pressure due to Uniform Surchage

Psur. = 0 H = 0
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

2.(ii) At top of foundation


(AS per Cl 5.8.3 of Sub Structure)
2.400

0.00 1.03
Formation level
B= 2.74

D 1.38

45 0

1.852
h1 0.82

Top of foundation

Psur. = ( S + V ) X h1 X Ka
( B + 2D ) D= 1.38 m
B= 2.74 m
Psur. = 0.289 t/m h1 = 0.82 m

Horizontal component
Pah = 0.29 X cos ( 0.000 + 0.186 ) = 0.28 t/m
Will act at = Y = 0.411 m
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Vertical component
Pav = 0.29 X sin ( 0.00 + 0.186 ) = 0.05 t/m
Will act at = X = 0.400 m
Active Dynamic earth pressure due to Uniform Surchage
Psur. = ( S + V ) X h1 X( Ca -Ka) Live Load Sur =S= 0.614 t/m2
( B + 2D ) Dead Load Sur=V= 6.2 t/m2
D= 1.38 m
Psur. = 0.07 t/m B= 2.74 m
h1 = 0.82 m
( assuming that psur will act horz. at h1/2 height as per CL 5 . 8 . 3 )
Y1 = h1 / 2 = 0.41 m

FINAL
Psur. H = 0.284 H = 0.411

Psur. V = 0.054 H = 0.400


Active Dynamic earth pressure due to Uniform Surchage

Psur. = 0.070747642 H = 0.411


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

At bottom of foundation

(AS per Cl 5.8.3 of Sub Structure)


2.400

0.3250 0.71
Formation level
B= 2.74

D= 1.06

45 0

2.152
h1 = 1.45

Top of foundation

Psur. = ( S + V ) X h1 X Ka D= 1.06 m
( B + 2D ) B= 2.74 m
h1 = 1.45 m
Psur. = 0.6 t/m

Horizontal component
Pah = 0.58 X cos ( 0.000 + 0.186 ) = 0.57 t/m
Will act at = Y = 0.724 m

Vertical component
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Pav = 0.58 X sin ( 0.00 + 0.186 ) = 0.11 t/m


Will act at = X = 0.700 m
Active Dynamic earth pressure due to Uniform Surchage
Psur. = ( S + V ) X h1 X( Ca -Ka) Live Load Sur =S= 0.614 t/m2
( B + 2D ) Dead Load Sur=V= 6.2 t/m2
D= 1.06 m
Psur. = 0.14 t/m B= 2.74 m
h1 = 1.45 m
( assuming that psur will act horz. at h1/2 height as per CL 5 . 8 . 3 )
Y1 = h1 / 2 = 0.72 m

FINAL
Psur. H = 0.568 H = 0.724

Psur. V = 0.107 H = 0.700


Active Dynamic earth pressure due to Uniform Surchage

Psur. = 0.14123087 H = 0.724


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

BUOYANCY FORCE

2
Area at HFL (A) = 0.4000 m
2
Area at check level (A1) = 0.4 m
2
Area at top of found. (A2) = 0.400 m
2
Area at btm of found. (A3) = 1.025 m
2
Area at LWL = 0.4000 m

HFL = -0.4
Chcek level = 0.68
Top of fund. Level = -0.25
Btm of found. Level = -0.55
LWL = 0

Buoyant force at HFL

3
Volume of retaining wall at check level = 0m

Buoyant force = volume x density of water

= 0t

3
Volume of retaining wall at Top of foundation = -0.060 m

X1 = 0.200 m
Buoyant force = volume x density of water

= -0.060 t
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

3
Volume of retaining wall at btm of foundation = 0.20653 m

X2 = 0.507 m
Buoyant force = volume x density of water

= 0.20653 t

Buoyant force at LWL

3
Volume of retaining wall at check level = 0m

Buoyant force = volume x density of water

= 0t
3
Volume of retaining wall at Top of foundation = 0.1 m

X1 = 0.200 m
Buoyant force = volume x density of water

= 0.1 t
3
Volume of retaining wall at Btm of foundation = 0.20653 m

X2 = 0.507 m
Buoyant force = volume x density of water

= 0.20653 t
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

4 Passive earth pressure on wall


(AS per Cl 5.7.1.6 of Sub Structure)

Following values has been assumed for passive earth pressure.


Pp = 0.5 X Kp X W X H^2

a = 0.000 rads i = 0 rads


f = 0.524 rads d = 0.175 rads

Kp = cos^2(f+ a)
cos^2(a) cos(a - d ) [1- Sin(f + d) Sin(f + i ) ] ^2
cos(a- d) cos (a - i)

Kp = 4.14
Only horz component of passive pressure will be effective . Vert component will be imaginary

Horizontal component of passive earth pressure


Pph = Pp X cos( d- a) will act at H/3

Earth pressure due to seismic effect

Ah = 0.080 (As per Cl 9.4.1 of IRS Code for EQ Resistant design of railway bridges)
Av = 0.053
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

(As per Cl 22.1.1 of IRS Code for EQ Resistant design of railway bridges)
Case-1
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.05333

( 1 + A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)

l = 0.0843
Cp = 4.086

Case-2
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.05333

( 1 + A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)

l = 0.0758
Cp = 4.115
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Case-3
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.05333

( 1 - A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)

l = 0.0758
Cp = 3.698
Case-4
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.05333

( 1 - A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)

l = 0.0843
Cp = 3.672

Final Cp = 3.672
Dynamic increment = Cp - Kp = -0.471
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

4.(i) At top of foundation

(AS per Cl 5.7.1.6 of Sub Structure)

Pp = 0.5 X Kp X W X H X H
Pp = 0.5 X 4.14 X 0.60 X 0.25 ^2 = 0.08 t/m

Factor of safety for passive earth pressure = 1

Net passive pressure with F.O.S = 0.08


= 0.08 t/m
1
Horizontal component of passive earth pressure

Pph = 0.07769 X cos ( 0.175 - 0.0000 = 0.08 t/m


It will act @ = 0.383 m
4.(ii) At bottom of foundation

(AS per Cl 5.7.1.6 of Sub Structure)

Pp = = 0.5 X Kp X W X H X H
Pp = 0.5 X 4.14 X 0.60 X 0.55 ^2 = 0.38 t/m

Horizontal component of passive earth pressure

Pph = 0.376 X cos ( 0.175 - 0.0000 = 0.37 t/m


It will act @ = 0.183 m

5 Self weight
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

5.(i) Up to int. checking level

0
5
0.4
Back fill 4 Passive
0.00
1 0.926
6
6
0.0
3 2

0.00 0.4 0.00

L.A L.A
W (t) horizontal vertical Area (A)
(m) (m)
Sec 1= 1 x 0.4 x 0.926 x 2.5 = 0.93 0.20 0.463 0.37
Sec 2 Part A= 0.5 x 0 X 0.926 x 2.5 = 0.00 0.00 0.309 0
Sec 3 Part A= 0.5 x 0 X 0.926 x 2.5 = 0.00 0.40 0.309 0
Sec 4 Part A= 0.5 x 0 X 0.926 x 1.8 = 0.00 0.40 0.617 0
Sec 5= 0.5 x 0.00 x 0 x 1.8 = 0.00 0.00 0.926 0
Filling load
Sec 6= 0.5 x 0.00 x 0.0 x 1.80 = 0.00 0.00 0 0
FINAL CG 0.2 0.463
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

5
0.40
4
0.93

1 2
1010 SEC 14

0.93
3
Bed level
15
0.00 0.00 16
10A 0.00
8 6 7 0.3
A 12 0.30
0.3 0.40 0.30

1.03
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

5.(ii) Up to the top of foundation


L.A L.A
W (t) horizontal vertical Area (A)
(m) (m)
Sec 1= 1 x 0.40 x 1.85 x 2.5 = 1.85 0.20 0.926 0.741
Sec 2 Part A= 0.5 x 0 X 1.852 x 2.5 = 0.00 0.00 0.617 0
Sec 3 Part A= 0.5 x 0 X 1.852 x 2.5 = 0.00 0.40 0.617 0
Sec 4 Part A= 0.5 x 0 X 1.852 x 1.8 = 0.00 0.40
1.235 0
SEC 5= 0.5 x 0.00 x 0.00 x 1.80 = 0.00 0.00 1.852 0
Filling load
Sec 14= 0.5 x 0.00 x 0.25 x 1.80 = 0.00 0.00 0.167 0
FINAL CG 0.2 0
At the bottom of foundation
L.A L.A
W (t) horizontal vertical Area (A)
(m) (m)
Sec 1= 1 x 0.40 x 1.85 x 2.50 = 1.85 0.50 1.226 0.741
Sec 2 Part A= 0.5 x 0 X 1.852 x 2.50 = 0.00 0.300 0.917 0
Sec 3 Part A= 0.5 x 0 X 1.852 x 2.50 = 0.00 0.700 0.917 0
Sec 4 Part A= 0.5 x 0 X 1.852 x 1.80 = 0.00 0.700 1.535 0
Sec 6= 1 x 0.40 x 0.00 x 2.50 = 0.00 0.50 0.3 0
Sec 7= 0.5 x 0.30 x 0.00 x 2.50 = 0.00 0.20 0.3 0
Sec 8= 0.5 x 0.325 X 0 x 2.50 = 0.00 0.81 0.3 0
Sec 10= 1 x 0.325 X 1.852 x 1.80 = 1 0.86 1.226 0.602
Sec 10A= 0.5 x 0.325 X 0 x 1.80 = 0.00 0.92 0.3 0
Sec 5= 1 x 0.33 x 0 x 1.8 = 0.00 0.7 2.152 0
Sec 12= 1 x 1.03 x 0.30 x 2.50 = 0.77 0.51 0.15 0.308
Filling load
Sec 14= 0.5 x 0.00 x 0.25 x 1.80 = 0.0000 0.30 0.467 0
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Sec 15= 1 x 0.30 x 0.25 x 1.80 = 0.14 0.15 0.15 0.075


Sec 16= 0.5 x 0.3 X 0 x 1.80 = 0.00 0.10 0.3 0
Live load Surcharge = 0.46 0.86 2.152 0.00325
FINAL CG 0.61 0.99

Vertical LL & DL on heel


UDL/RM = (S+V)/(2*TRACK CENTRE DISTANCE) = 1.42
7.(l) Calculation of stresses at int. checking level

S.No. L. A.
FROM
Description of load
Load FRONT Moment
Vert Horz (m) (t-m)
1 Earth pressure
Horz. component Ph 0.22 0.31 0.07
Vert. component Pv 0.04 0.00 0.00
2 Earth pressure due to surcharge Psur 0.00 0.00 0.00
3 Vertical Load Due Surcharge 0.00 0.40 0.00
4 Self weight & back fill
Sec 1= 1 x 0.4 x 0.926 x 2.5 0.93 0.20 0.19
Sec 2 Part 0.5 x 0 X 0.926 x 2.5 0.00 0.00 0.00
A=
Sec 3 Part 0.5 x 0 X 0.926 x 2.5 0.00 0.40 0.00
A=
Sec 4 Part
0.5 x 0 X 0.926 x 1.8 0.00 0.40 0.00
A=
Sec 5= 0.5 x 0 x 0 x 1.8 0.00 0.00 0.00
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Filling load
Sec 6= 0.5 x 0 x 0 x 1.8 0.00 0.00 0.00
Total = 0.97 0.12
Due to seismic effect 0.05 -0.05
Combined load with seismic 1.02 0.07

Without seismic

Sum of moment 0.12


Z = = 0.123 m
Vert. load 0.97

e= B/2 - Z = 0.20 ~ 0.12 = 0.077 m

A = 0.400 SQM.

Z = 0.027

P M 0.97 0.074
Pmax = + = + = 5.173 t/m2
A Z 0.400 0.027

P M 0.97 0.074
Pmin = + = - = -0.34 t/m2
A Z 0.400 0.027
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

7.(II) Calculation of stresses at top of foundation

S.No. Load L. A. Moment


Description of load
Vert Horz (m) (t-m)
1 Earth pressure
Horz. component Ph 0.86 0.62 0.53
Vert. component Pv 0.16 0.00 0.00
2 Earth pressure due to surcharge Psur 0.28 0.41 0.12
3 Vertical load due to surcharge 0.05 0.40 0.02
4 Self weight & back fill
5 Passive Earth Fill 0.08 0.38 0.03
Sec 1= 1 x 0.40 x 1.852 x 2.5 1.85 0.20 0.37
Sec 2 Part 0.5 x 0 X 1.852 x 2.5 0.00 0.00 0.00
A=
Sec 3 Part 0.5 x 0 X 1.852 x 2.5 0.00 0.40 0.00
A=
Sec 4 Part 0.5 x 0 X 1.852 x 1.8 0.00 0.40 0.00
A=
SEC 5= 0.5 x 0.00 x 0 x 1.8 0.00 0.00 0.00

Filling load
Sec 14= 0.5 x 0.00 x 0.25 x 1.8 0.00 0.00 0.00
Total = 2.07 -0.23
Due to seismic effect 0.10 -0.35
Combined load with seismic 2.17 -0.58

Without seismic
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

CG from Sum of moment -0.23 = -0.11 m


A= Vert. load 2.07

A = 0.400 SQM.

Z = 0.027

e= B/2- CG = 0.2 - -0.11 = 0.31018

P M 2.07 0.641
Pmax = + = + = 28.911 t/m2
A Z 0.400 0.027

P M 2.07 0.641
Pmin = + = - = -18.571 t/m2
A Z 0.400 0.027
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Calculation of stresses at bottom of foundation

Load L. A. Moment
Sr.No. Description of load
Vert Horz (m) (t-m)
1 Earth pressure
Horz. component Ph 1.16 0.72 0.84
Vert. component Pv 0.219 0.700 0.15
2 Earth pressure due to surcharge Psur 0.57 0.72 0.41
Vertical load due to surcharge 0.11 0.70 0.07
3 Passive earth pressure 0.37 0.18 0.07
4 Self weight & back Fill
Sec 1= 1 x 0.40 x 1.852 x 2.5 1.85 0.50 0.93
Sec 2 Part
0.5 x 0 X 1.852 x 2.5 0.00 0.30 0.00
A=
Sec 3 Part
0.5 x 0 X 1.852 x 2.5 0.00 0.70 0.00
A=
Sec 6= 1 x 0.40 x 0 x 2.5 0.00 0.50 0.00
Sec 7= 0.5 x 0.30 x 0 x 2.5 0.00 0.20 0.00
Sec 8= 0.5 x 0.325 X 0 x 2.5 0.00 0.81 0.00
Sec 4 Part
0.5 x 0 X 1.852 x 1.8 0.00 0.70 0.00
A=
Sec 10= 1 x 0.325 X 1.852 x 1.8 1.08 0.86 0.93
Sec 10A= 0.5 x 0.325 X 0 x 1.8 0.00 0.92 0.00
Sec 5= 1 x 0.33 x 0 x 1.8 0.00 0.70 0.00
SEC 12=
Steps 1 x 1.03 x 0.30 x 2.5 0.77 0.51 0.39
0 0.00 0.00 0.00
Filling load
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Sec 14= 0.5 x 0.00 x 0.25 x 1.80 0.00 0.30 0.00


Sec 15= 1 x 0.30 x 0.25 x 1.8 0.14 0.15 0.02
Sec 16= 0.5 x 0.3 X 0 x 1.8 0.00 0.10 0.00
Live load Surcharge 0.46 0.86 0.40
Normal case (Total) = 4.17 1.72

Bouyancy force effect


Total force (HFL)
up to top of foundation 0.06 0.500 0.03
From top to btm of found. -0.21 0.50716 -0.10

Total force (LWL)


up to top of foundation -0.10 0.500 -0.05
From top to btm of found. -0.21 0.50716 -0.10

Considering bouyancy effect (HFL) 4.02 1.65


Considering bouyancy effect (LWL) 3.86 1.57
Due to seismic effect 0.22 -0.90
Combined load with seismic 4.39 0.83
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Without seismic (Normal case)

CG from Sum of moment 1.72 = 0.41 m


A= Vert. load 4.17

A = 1.025 SQM.

Z = 0.175

e= B/2- CG = 0.5125 - 0.41 = 0.09883

P M 4.17 0.412
Pmax = + = + = 6.418 t/m2
A Z 1.025 0.175

P M 4.17 0.412
Pmin = + = - = 1.71 t/m2
A Z 1.025 0.175
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Normal case + buoyancy effect

CG from Sum of moment 1.65 = 0.41 m


A= Vert. load 4.02

e= B/2- CG = 0.5125 - 0.41 = 0.10235

P M 4.02 0.411
Pmax = + = + = 6.269 t/m2
A Z 1.025 0.175

P M 4.02 0.411
Pmin = - = - = 1.572 t/m2
A Z 1.025 0.175

8 Calculation for stability of wall (Normal case)


8.(i) Against overturning

Mo = Moment due to E.P.(horizo. component) + Moment due to surcharge(horizo.component)

Mo = 0.84 + 0.41 = 1.25 t-m

Ms = Moment due to vert comp.earth pressure + Moment due to vert. load due to surcharge +
Moment due to self wt. & earth fill + Moment due to passive
Ms = 2.57 t-m
Factor of safety = Ms 2.57
= = 2.06 SAFE
Mo 1.25

8.(ii) Against sliding


CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

Total horz. force = 1.16 + 0.57 - 0.37 = 1.36 t

Total vert. force = 4.17 t

Coff of friction = m = 0.58


Base width = 1.025 m
2
Cohesion = 0.00 t/m
Total resisting force = 2.405 + 0
Vert. force x Coff of friction Width x Cohesion
= 2.405 t

Factor of safety = Resisting force 2.405


=
Horz. force 1.36

= 1.77 SAFE
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

9 Calculation for stability of wall (Normal case+buoyancy effect)

9.(i) Against overturning

Mo = Moment due to E.P.(horizo. component) + Moment due to surcharge(horizo.component)

Mo = 0.84 + 0.41 = 1.25 t-m

Ms = Moment due to vert comp.earth pressure + Moment Due to vert. load due to surcharge +
Moment due to self wt. & earth fill + Moment due to passive + Moment due to buoyancy
Ms = 2.50 t-m
Factor of safety = Ms 2.50
= = 2.00 SAFE
Mo 1.25
CLIENT : SOUTH WESTERN RAILWAY

PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works

9.(ii) Against sliding

Total horz. force = 1.16 + 0.57 - 0.37 = 1.36 t

Total vert. force = 4.02 t

Coff of friction = m = 0.58


Base width = 1.025 m
2
Cohesion = 0.00 t/m
Total resisting force = 2.32 + 0
Vert. force x Coff of friction Width x Cohesion
= 2.32 t

Factor of safety = Resisting force 2.32


=
Horz. force 1.36

= 1.70 SAFE

MEHU
Digitally signed by Digitally signed by
MEHUL PATEL ASEEF SHEIKH

ASEEF
DN: cn=MEHUL PATEL,
DN: cn=ASEEF
o=GEO DESIGNS AND

L RESEARCH PVT LTD, ou,


email=DESIGNBRIDGEE
SHEIKH, o=DESIGN
DIRECTOR, ou,

PATEL
[email protected],
c=IN
Date: 2024.08.10
SHEIKH email=ASEEFSHEIKH
@GMAIL.COM, c=IN
Date: 2024.08.10
09:43:15 +05'30'
09:43:31 +05'30'

You might also like