PLATFORM WALL DESIGN-f
PLATFORM WALL DESIGN-f
No.:
Doc.
Client: SOUTH WESTERN RAILWAY
No.
ASEEF
Digitally signed by
Digitally signed by ASEEF SHEIKH
MEHUL PATEL
DN: cn=ASEEF
MEHUL DN: cn=MEHUL PATEL,
o=GEO DESIGNS AND
RESEARCH PVT LTD, ou,
SHEIK
SHEIKH, o=DESIGN
DIRECTOR, ou,
PATEL
email=DESIGNBRIDGEE email=ASEEFSHEIKH
[email protected],
H
c=IN
@GMAIL.COM, c=IN
Date: 2024.08.10 Date: 2024.08.10
09:42:55 +05'30' 09:42:34 +05'30'
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
INPUT DATA
Reduced levels
Foundation details
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Loading details
Seismic parameter :-
Zone = III
Z = 0.16
Type Of Soil For Foundation = MEDIUM SOIL
R 2.5
Sa/g 2.5
I = 1.00
2
Permissible comp. stress 760 t/m
2
Permissible tensile stress -68.0 t/m
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Result
Stresses in wall
Normal case
1) At Int. checking level
P max = 5.17 t/m2 SAFE
P min = -0.34 t/m2 SAFE
2) At top foundation
P max = 28.91 t/m2 SAFE
P min = -18.57 t/m2 SAFE
Foundation pressure
Normal case
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Foundation pressure
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
For calculation of active earth pressure on wall, Coulomb's Theory will be used.
following value will be assumed.
(As per Cl 5.7.1 Sub structure)
Ka = cos^2(f - a)
a = 0.000 rad
f = 0.559 rad
a = 0.000 rad
d = 0.1862 rad
i = 0.000 rad
Ka = 0.284
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
i
Horizontal component of active earth pressure
Pah = Pa X cos( a + d )
Acting at Y1= (h/3) above section considered
a
Vertical component of active earth pressure
Pav = Pa X sin( a + d )
Pah Acting at Y1 X cot (90-a) from face of wall
a
Y1 =h /3 d
Pa
Pav f
Earth pressure due to seismic effect
(As per Cl 9.4.1 of IRS Code for EQ Resistant design of railway bridges)
Ah = 0.080
Av = 0.053
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
(As per Cl 22.1.1 of IRS Code for EQ Resistant design of railway bridges)
Case-1
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.053
( 1 + A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)
l = 0.0758
Ca = 0.348
Case-2
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.053
( 1 + A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)
l = 0.0843
Ca = 0.354
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Case-3
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.053
( 1 - A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)
l = 0.0843
Ca = 0.313
Case-4
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.053
( 1 - A v ) cos2(f - a - l)
Ca = sin(f + d) sin(f - i - l ) 2
cos( l )cos2 (a) cos(a + d + l) 1 +
cos(a+ d + l) cos (a - i)
l = 0.0758
Ca = 0.269
Final Ca = 0.354
Dynamic increment = Ca - Ka = 0.069
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Pa = Ka X W X h X h
2
Where h = 0.926 m . 0
Pa = 0.5 X 0.28 X 1.8 X 0.926 X 0.926
= 0.219 t
Horizontal component
Pa = Ka X W X h X h
2
Where h = 1.852 m . 0
Pa = 0.5 X 0.28 X 1.8 X 1.852 X 1.852
= 0.88 t
Horizontal component
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Vertical component
Pa = Ka X W X h X h
2
Where h = 2.15 . 0
Pa = 0.5 X 0.284 X 1.8 X 2.15 X 2.152
= 1.18 t
Horizontal component
Pah = 1.18 X cos ( 0 + 0.18617 ) = 1.16 t/m
Will act at = Y = 0.72 m
Vertical component
Pav = 1.18 X sin ( 0.00 + 0.18617 ) = 0.22 t/m
Will act at = X = 0.72 X cot(1.57- 0) = 0.000 m
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
0 1.03
Formation level
B= 2.74
D 1.38
0.926
45 0
h1 -0.10
Checking level
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Horizontal component
Pah = 0.00 X cos ( 0.000 + 0.186 ) = 0.00 t/m
Will act at = Y = 0.000 m
Vertical component
Pav = 0.00 X sin ( 0.00 + 0.186 ) = 0.00 t/m
Will act at = X = 0.400 m
Active Dynamic earth pressure due to Uniform Surchage
Psur. = ( S + V ) X h1 X( Ca -Ka) Live Load Sur =S= 0.614 t/m2
( B + 2D ) Dead Load Sur=V= 6.2 t/m2
D= 1.38 m
Psur. = 0.00 t/m B= 2.74 m
h1 = 0.00 m
( assuming that psur will act horz. at h1/2 height as per CL 5 . 8 . 3 )
Y1 = h1 / 2 = 0.00 m
FINAL
Psur. H = 0 H = 0
Psur. = 0 H = 0
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
0.00 1.03
Formation level
B= 2.74
D 1.38
45 0
1.852
h1 0.82
Top of foundation
Psur. = ( S + V ) X h1 X Ka
( B + 2D ) D= 1.38 m
B= 2.74 m
Psur. = 0.289 t/m h1 = 0.82 m
Horizontal component
Pah = 0.29 X cos ( 0.000 + 0.186 ) = 0.28 t/m
Will act at = Y = 0.411 m
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Vertical component
Pav = 0.29 X sin ( 0.00 + 0.186 ) = 0.05 t/m
Will act at = X = 0.400 m
Active Dynamic earth pressure due to Uniform Surchage
Psur. = ( S + V ) X h1 X( Ca -Ka) Live Load Sur =S= 0.614 t/m2
( B + 2D ) Dead Load Sur=V= 6.2 t/m2
D= 1.38 m
Psur. = 0.07 t/m B= 2.74 m
h1 = 0.82 m
( assuming that psur will act horz. at h1/2 height as per CL 5 . 8 . 3 )
Y1 = h1 / 2 = 0.41 m
FINAL
Psur. H = 0.284 H = 0.411
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
At bottom of foundation
0.3250 0.71
Formation level
B= 2.74
D= 1.06
45 0
2.152
h1 = 1.45
Top of foundation
Psur. = ( S + V ) X h1 X Ka D= 1.06 m
( B + 2D ) B= 2.74 m
h1 = 1.45 m
Psur. = 0.6 t/m
Horizontal component
Pah = 0.58 X cos ( 0.000 + 0.186 ) = 0.57 t/m
Will act at = Y = 0.724 m
Vertical component
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
FINAL
Psur. H = 0.568 H = 0.724
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
BUOYANCY FORCE
2
Area at HFL (A) = 0.4000 m
2
Area at check level (A1) = 0.4 m
2
Area at top of found. (A2) = 0.400 m
2
Area at btm of found. (A3) = 1.025 m
2
Area at LWL = 0.4000 m
HFL = -0.4
Chcek level = 0.68
Top of fund. Level = -0.25
Btm of found. Level = -0.55
LWL = 0
3
Volume of retaining wall at check level = 0m
= 0t
3
Volume of retaining wall at Top of foundation = -0.060 m
X1 = 0.200 m
Buoyant force = volume x density of water
= -0.060 t
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
3
Volume of retaining wall at btm of foundation = 0.20653 m
X2 = 0.507 m
Buoyant force = volume x density of water
= 0.20653 t
3
Volume of retaining wall at check level = 0m
= 0t
3
Volume of retaining wall at Top of foundation = 0.1 m
X1 = 0.200 m
Buoyant force = volume x density of water
= 0.1 t
3
Volume of retaining wall at Btm of foundation = 0.20653 m
X2 = 0.507 m
Buoyant force = volume x density of water
= 0.20653 t
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Kp = cos^2(f+ a)
cos^2(a) cos(a - d ) [1- Sin(f + d) Sin(f + i ) ] ^2
cos(a- d) cos (a - i)
Kp = 4.14
Only horz component of passive pressure will be effective . Vert component will be imaginary
Ah = 0.080 (As per Cl 9.4.1 of IRS Code for EQ Resistant design of railway bridges)
Av = 0.053
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
(As per Cl 22.1.1 of IRS Code for EQ Resistant design of railway bridges)
Case-1
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.05333
( 1 + A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)
l = 0.0843
Cp = 4.086
Case-2
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.05333
( 1 + A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)
l = 0.0758
Cp = 4.115
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Case-3
Ah 0.080
l = tan -1 = tan -1 = 0.0758
1 + Av 1 + 0.05333
( 1 - A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)
l = 0.0758
Cp = 3.698
Case-4
Ah 0.080
l = tan -1 = tan -1 = 0.08431
1 + Av 1 - 0.05333
( 1 - A v ) cos2(f + a - l)
Cp = sin(f + d) sin(f + i - l ) 2
cos( l ) cos2 (a) cos( d -a+ l) 1 -
cos( d - a + l) cos (a - i)
l = 0.0843
Cp = 3.672
Final Cp = 3.672
Dynamic increment = Cp - Kp = -0.471
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Pp = 0.5 X Kp X W X H X H
Pp = 0.5 X 4.14 X 0.60 X 0.25 ^2 = 0.08 t/m
Pp = = 0.5 X Kp X W X H X H
Pp = 0.5 X 4.14 X 0.60 X 0.55 ^2 = 0.38 t/m
5 Self weight
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
0
5
0.4
Back fill 4 Passive
0.00
1 0.926
6
6
0.0
3 2
L.A L.A
W (t) horizontal vertical Area (A)
(m) (m)
Sec 1= 1 x 0.4 x 0.926 x 2.5 = 0.93 0.20 0.463 0.37
Sec 2 Part A= 0.5 x 0 X 0.926 x 2.5 = 0.00 0.00 0.309 0
Sec 3 Part A= 0.5 x 0 X 0.926 x 2.5 = 0.00 0.40 0.309 0
Sec 4 Part A= 0.5 x 0 X 0.926 x 1.8 = 0.00 0.40 0.617 0
Sec 5= 0.5 x 0.00 x 0 x 1.8 = 0.00 0.00 0.926 0
Filling load
Sec 6= 0.5 x 0.00 x 0.0 x 1.80 = 0.00 0.00 0 0
FINAL CG 0.2 0.463
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
5
0.40
4
0.93
1 2
1010 SEC 14
0.93
3
Bed level
15
0.00 0.00 16
10A 0.00
8 6 7 0.3
A 12 0.30
0.3 0.40 0.30
1.03
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
S.No. L. A.
FROM
Description of load
Load FRONT Moment
Vert Horz (m) (t-m)
1 Earth pressure
Horz. component Ph 0.22 0.31 0.07
Vert. component Pv 0.04 0.00 0.00
2 Earth pressure due to surcharge Psur 0.00 0.00 0.00
3 Vertical Load Due Surcharge 0.00 0.40 0.00
4 Self weight & back fill
Sec 1= 1 x 0.4 x 0.926 x 2.5 0.93 0.20 0.19
Sec 2 Part 0.5 x 0 X 0.926 x 2.5 0.00 0.00 0.00
A=
Sec 3 Part 0.5 x 0 X 0.926 x 2.5 0.00 0.40 0.00
A=
Sec 4 Part
0.5 x 0 X 0.926 x 1.8 0.00 0.40 0.00
A=
Sec 5= 0.5 x 0 x 0 x 1.8 0.00 0.00 0.00
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Filling load
Sec 6= 0.5 x 0 x 0 x 1.8 0.00 0.00 0.00
Total = 0.97 0.12
Due to seismic effect 0.05 -0.05
Combined load with seismic 1.02 0.07
Without seismic
A = 0.400 SQM.
Z = 0.027
P M 0.97 0.074
Pmax = + = + = 5.173 t/m2
A Z 0.400 0.027
P M 0.97 0.074
Pmin = + = - = -0.34 t/m2
A Z 0.400 0.027
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Filling load
Sec 14= 0.5 x 0.00 x 0.25 x 1.8 0.00 0.00 0.00
Total = 2.07 -0.23
Due to seismic effect 0.10 -0.35
Combined load with seismic 2.17 -0.58
Without seismic
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
A = 0.400 SQM.
Z = 0.027
P M 2.07 0.641
Pmax = + = + = 28.911 t/m2
A Z 0.400 0.027
P M 2.07 0.641
Pmin = + = - = -18.571 t/m2
A Z 0.400 0.027
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Load L. A. Moment
Sr.No. Description of load
Vert Horz (m) (t-m)
1 Earth pressure
Horz. component Ph 1.16 0.72 0.84
Vert. component Pv 0.219 0.700 0.15
2 Earth pressure due to surcharge Psur 0.57 0.72 0.41
Vertical load due to surcharge 0.11 0.70 0.07
3 Passive earth pressure 0.37 0.18 0.07
4 Self weight & back Fill
Sec 1= 1 x 0.40 x 1.852 x 2.5 1.85 0.50 0.93
Sec 2 Part
0.5 x 0 X 1.852 x 2.5 0.00 0.30 0.00
A=
Sec 3 Part
0.5 x 0 X 1.852 x 2.5 0.00 0.70 0.00
A=
Sec 6= 1 x 0.40 x 0 x 2.5 0.00 0.50 0.00
Sec 7= 0.5 x 0.30 x 0 x 2.5 0.00 0.20 0.00
Sec 8= 0.5 x 0.325 X 0 x 2.5 0.00 0.81 0.00
Sec 4 Part
0.5 x 0 X 1.852 x 1.8 0.00 0.70 0.00
A=
Sec 10= 1 x 0.325 X 1.852 x 1.8 1.08 0.86 0.93
Sec 10A= 0.5 x 0.325 X 0 x 1.8 0.00 0.92 0.00
Sec 5= 1 x 0.33 x 0 x 1.8 0.00 0.70 0.00
SEC 12=
Steps 1 x 1.03 x 0.30 x 2.5 0.77 0.51 0.39
0 0.00 0.00 0.00
Filling load
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
A = 1.025 SQM.
Z = 0.175
P M 4.17 0.412
Pmax = + = + = 6.418 t/m2
A Z 1.025 0.175
P M 4.17 0.412
Pmin = + = - = 1.71 t/m2
A Z 1.025 0.175
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
P M 4.02 0.411
Pmax = + = + = 6.269 t/m2
A Z 1.025 0.175
P M 4.02 0.411
Pmin = - = - = 1.572 t/m2
A Z 1.025 0.175
Ms = Moment due to vert comp.earth pressure + Moment due to vert. load due to surcharge +
Moment due to self wt. & earth fill + Moment due to passive
Ms = 2.57 t-m
Factor of safety = Ms 2.57
= = 2.06 SAFE
Mo 1.25
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
= 1.77 SAFE
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
Ms = Moment due to vert comp.earth pressure + Moment Due to vert. load due to surcharge +
Moment due to self wt. & earth fill + Moment due to passive + Moment due to buoyancy
Ms = 2.50 t-m
Factor of safety = Ms 2.50
= = 2.00 SAFE
Mo 1.25
CLIENT : SOUTH WESTERN RAILWAY
PROJECT Construction of Electrified Double Line Track between Penukonda Junction (KM 136.694) to Dharmavaram (KM 176.600) including
NAME : Telecommunication & Electrical works
= 1.70 SAFE
MEHU
Digitally signed by Digitally signed by
MEHUL PATEL ASEEF SHEIKH
ASEEF
DN: cn=MEHUL PATEL,
DN: cn=ASEEF
o=GEO DESIGNS AND
PATEL
[email protected],
c=IN
Date: 2024.08.10
SHEIKH email=ASEEFSHEIKH
@GMAIL.COM, c=IN
Date: 2024.08.10
09:43:15 +05'30'
09:43:31 +05'30'