Black C.P
Black C.P
EG/01
M/S SAHIL CONTROL PLAN FOR ALKALINE ZINC PLATING WITH TRIVALENT BLACK PASSIVATION WITH Eff. Date-01-02-2021
INDUSTRIES TOP COAT Rev. Date:-
Rev. No.00
PAGE -
PROTOTYPE PRELAUNCH PRODUCTION
1 OF 4
Control Plan No.:- Supplier Code:- Key Date:- 03/08/2023 Date(Org.) :- Rev. No. & Date: Review Date :-
Key Contect No.-9818585668,9818283202
Part No.:- 8/3/2023 0
Mr. Anil Ratra, Mr. Pankaj Ratra
Part Name :- Core Team :-Mr. Anil Ratra, Pankaj Ratra, V.P. Singh, Kishan, Lalit
Customer Name:- Supplier / Plant Approval Date :- (If Reqd.) Other Approval / Date.-(If Reqd.)
Customer Engineering Approval Date (If Reqd):- Customer Quality Approval Date (If Reqd):- Other Approval /Date.- (If Reqd.)
METHODS
Should be free from Dent, Bend As per Material Incoming Hold the Material &
QA
I Appearance and Any other visual defects and Visually sampling Each Lot Record informed to
verify Qnty According to challan Inspector F-QA 01)
plan Customer.
Incoming Material and
10 As Per Bill /Challan
inspection
As per
Parts lever comp clutch KYJ No Heavy rust allowed QA Rust Acceptance as per Material hols and
II Appearance sampling Each Lot
Should be free from Rust specially Grooves Area Inspector SOP Inform to Customer
plan
During decantation removing oil Check sheet Add. Chemical as per lab
VI Decantation Manual 100% Weekly Sup./Ope.
content & sludge Impurites FRM/MNT/06 test Result
During decantation removing Iron Check sheet Add. Chemical as per lab
VI Decantation Manual 100% Weekly Sup./Ope.
Content Impurites FRM/MNT/06 test Result
Zinc Metal
I C 8 -15 gm / ltr.
(Opt. 12 gm/ltr.) Check sheet Add. Chemical as per lab
Concentration Lab Test In House n =1 Start/Day Engr./Sup
Sodium Hydroxide FRM/QA/26 test Result
II C 100 - 140 gm / ltr.
(Opt-120 gm/Ltr.)
Zinc Dust -250 gm Cartridge Pack Check sheet Re-Pack Zinc Dust &
XVI Filtration By Weighing Scale n =1 Engr./Sup
Carbon- 100 gm Weekly FRM/MNT/03 Carbon
If pressure found
Check sheet
XVII Filter Pressure 0-2 PSI Pressure Meter n =1 Every Day Engr./Sup increase 0-2 PSI filter
FRM/QA/06
clean immediately.
If pressure found
Cartidge & cloth cleaning on daily Check sheet
XVIII Filter Cleaning Manually n =1 Daily Engr./Sup increase 0-2 PSI filter
basis. FRM/MNT/03
clean immediately.
PP Tank-19
130 Drag Out I No Specific measurements required in this D.M. Water solution, Discard Frequency daily Basis
(Bath Capacity-150Ltr.)
CHARACTERSTICS PRODUCT/PROCESS/ SAMPLE
PROCESS PROCESS NAME OPERATION M/C DEVICE, JIGS, EVALUATION,MEASUR
SPECIFICATION/ CONTROL METHOD REACTION PLAN
SR. NO. /DESCRIPTION TOOLS, FOR MFG. MENT, TECHNIQUE
NO. PRODUCTS CLASS PROCESS TOLERANCE SIZE FREQ. RESP.
Check sheet Hold the material &
I pH Value 2 -7 Ph pH Paper n =1 Every 4 Hrs. Sup./Ope.
FRM/QA/06 change of water
3 -7 Sec. Check sheet
140 D.M. Water Rinse (Bath Capacity-150Ltr.) II Dip Time Diping Manually … Each Lot Sup./Ope. Re-Water Rinse
(2-5 Dip) FRM/QA/06
Discard Sweep, No old water content tp be
III Manual 100% Daily Sup./Ope. FRM/MNT/06 Change Water
Frequency present in tank
NITRIC ACID Check sheet
I Concentration Lab Test n=1 Start/Day Engr./Sup
0.5 - 1% v/v FRM/QA/26 Make Fresh every 8 Hrs.
PP Tank-21 3 -7 Sec. Check sheet Working
150 Activation Dip II Dip Time Diping Manually … Each Lot Sup./Ope.
(Bath Capacity-150Ltr.) (2-5 Dip) FRM/QA/06
Discarding Sweep, No old Nitric content to be
IV Manual Every day Daily Visual Operator Change Nitric Acid
Frequency present in tank
Check sheet Hold the material &
I pH Value 3 -7 Ph pH Paper n =1 Every 4 Hrs. Sup./Ope.
FRM/QA/06 change of water
3 -7 Sec. Check sheet
160 D.M. Water Rinse (Bath Capacity-150Ltr.) II Dip Time Diping Manually … Each Lot Sup./Ope. Re-Water Rinse
(2-5 Dip) FRM/QA/06
Discard Sweep, No old water content to be
III Manual 100% Daily Sup./Ope. FRM/MNT/06 Change Water
Frequency present in tank
Lanthane-707 A & B
Check sheet Add. Chemical as per lab
I C Concentration 100-150 ml/ltr Lab Test 1 Daily Engr./Sup
FRM/QA/26 test Result
(Opt. 125 ml/Lrt.)
Check sheet Hold the material &
II C pH Value 2.3 - 2.5 pH Paper/ pH Meter n =1 Every 4 Hrs. Sup./Ope.
FRM/QA/06 change of water
Temp. Check sheet
III Temp. 25 - 35°C n =1 Every 4 Hrs. Sup./Ope. Auto Temp. Controller
Indicator/Thermometer FRM/QA/06
45 -60 Sec. Check sheet
IV Dip Time Timer n =1 Every 4 Hrs. Sup./Ope. Reset Timer
(Opt-50 Sec.) FRM/QA/06
Add Chemical as per
V Addition 200- 300 ml/lot Manual 1 Every 2 Hrs. Operator FRM/QA/40
specification
180 Trivalent Black Passivation During decantation removing Iron Check sheet Add. Chemical as per lab
(Bath Capacity-80Ltr.) VI Decantation Continuous n =1 Every Day Engr./Sup
& Zinc Content Impurites FRM/QA/06 test Result
Solution wiil be
VII C Zinc Max. Zinc - 10 gm./ltr. Impurity Lab Test From CMF n =1 15 Days Engr./Sup Out side report
treatment
Solution wiil be
VIII C Iron Max. Iron - 100ppm Impurity Lab Test From CMF n =1 15 Days Engr./Sup Out side report
treatment
Every 1 Month
( if Increase
Discard Sweep, No old Passivation content impurities before
IX Manual 100% Sup./Ope. FRM/MNT/06 Make new fresh Solution
Frequency to be present in tank plan will be
discarded
passivation)
CHARACTERSTICS PRODUCT/PROCESS/ SAMPLE
PROCESS PROCESS NAME OPERATION M/C DEVICE, JIGS, EVALUATION,MEASUR
SPECIFICATION/ CONTROL METHOD REACTION PLAN
SR. NO. /DESCRIPTION TOOLS, FOR MFG. MENT, TECHNIQUE
NO. PRODUCTS CLASS PROCESS TOLERANCE SIZE FREQ. RESP.
Check sheet Hold the material &
I pH Value 3 -7 Ph Ph Paper n =1 Every 4 Hrs. Sup./Ope.
FRM/QA/06 change of water
5 parts Final
II Colour Tri. Black Visual Every lot Re-plating
per lot Inspector
260 Final Inspection Manual FRM/QC/35
III Plating Thickness Min.8µ Thickness tester 5 Pcs. Per Lot Each lot Inspecter Hold Material
IV Adhesion No plating peel off Tape Test 2 Pcs. Per Lot Each Lot Inspecter Verify Process
CHARACTERSTICS PRODUCT/PROCESS/ SAMPLE
PROCESS PROCESS NAME OPERATION M/C DEVICE, JIGS, EVALUATION,MEASUR
SPECIFICATION/ CONTROL METHOD REACTION PLAN
SR. NO. /DESCRIPTION TOOLS, FOR MFG. MENT, TECHNIQUE
NO. PRODUCTS CLASS PROCESS TOLERANCE SIZE FREQ. RESP.
STD (MFZN2HK)
SST Chamber Check sheet Re- Check All
270 NSS TEST Salt Spray Chamber I N.S.S test WR-96 Hrs. 1 Every Month Inspector
Monitor After 24 hrs FRM/QA/15 Process
RR-240 Hrs.
80 Nos/Per Bin
280 Packing Manual I …. Visual Weight 10 Kg. Visual 1 Each Lot QA F/ENGG/08 Re-Packed
As per Customer packing std
S No Ammendent Detail Rev No. Rev Date Next Rev Date Effectiveness Remarks