FAIR FIGHTING FOR BASEMENT 2 FLOOR PLAN
M
1
H-098
1:100
Revision Notes D.by Ch.by Date Scale Drawn by Checked by Date Revision
1:100@A1 M.F H.J 29.02.24 -
Drawing Title الرسم Project المشروع
FAIR FIGHTING FOR BASEMENT2 FLOOR PLAN
TMOMEN APARTMENTS
• The contractor must check and confirm dimension.
ليبيا/طرابلس-سيدي المصري
• All discrepancies reported to client's agent and resolved before works commences.
• Do not scale drawing all dimension in millimeters and level in meters.
• All work and materials to be in accordance with current applicable statutory legislation and to comply with all relevant codes of practice in Libya.
Drawing N0: 2301-H098 :رقم اللوحة SIDI AL MASRY -TRIPOLI /LIBYA