Check List no ( 06 )
Installation check list for
MV Cables Site Check List Project Adressing Project Name: 0 Site Location: 0 Report Number: To: 0 Date: CC: 0 Inspection By: M.Sc Eng Amer Elwany Item Adressing Item Name: MV Cables Cable length: Cable Size: Roll Cable No : From ~ to No Required SPECS OK NG Notes 1 visible inspection of AC cable inside trench is ok , no hits or scratches. 2 Cables description is correct and model # matches data sheets. 3 Install cables avoiding gas and water pipelines and under the sidewalk. 4 Determine road crosses and equip suitable size pipe to protect cables. 5 Cable trenches to be as straight as possible & as trench detailed drawing. 6 Trench depth is 1 m and width 40 cm for each single cable. 7 Pure sand beneath cable with 10 cm depth. 8 Pure sand above cable with 20 cm depth. 9 In case of unstraight route , bending should be 20 times cable diameter. 10 Install cable joints and inspect cable ( OC , SC ) , Visual damages. 11 Install cable joints ASAP before humidity get through cable isolation. 12 Cover cables with bricks or tiles as national grid code ( 8 bricks / meter ). 13 Interval depth distance between MV cables 30 cm at least. 14 Multiple cable route must have bricks in between with ( 8 bricks / meter ) 15 Cover bricks with pure sand at least 30 cm. 16 Warning tape along the cable route with depth at least 30 cm. 17 Upper layer cover is normal soil with 30 cm depth at least & till surface. 18 Earthing cable from test link bars to earth Pit is ok and no loose. 19 Earthing internal cables from Kiosk , MV SG to test link is ok and no loose. 20 FAT certificate showing Cable code and Test SPECS. we certified that subcontractor has completed installation according to the required SPECS , contract between us and the Certificate of Completion National Grid Code , and according to the following :
Installation Status percentage is ( )%
( Done - Not Yet ) Subcontractor has Delivered the installation , Currunt Company in charge ( ) Installation Status ( Done - Not Yet ) Installation has been delivered to Project's consultant . ( Done - Not Yet ) Installation has been delivered to Project's Owner, Currunt Company in charge ( ) ( Done - Not Yet ) Grd connection and operation status , Currunt Company in charge ( )