BF2100-141-6-P-204R - Typical Details Connection Chambers Rebar
BF2100-141-6-P-204R - Typical Details Connection Chambers Rebar
BF2100-141-6-P-204R - Typical Details Connection Chambers Rebar
A Notes A
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE
STATED.
D12 - 125c/c
4. CEM I 42,5N CEMENT TO BE USED.
B B
5. ALL DIMENSIONS ARE APPROXIMATE.
6. ABBREVIATIONS:
D12 - 125c/c
6.1. CI - CAST IRON
6.2. DI - DUCTILE IRON
6.3. FGL - FINAL GROUND LEVEL
6.4. BV - BUTTERFLY VALVE
6.5. DJ - DISMANTLING JOINT
6.6. UNO - UNLESS NOTED OTHERWISE
C C
D12 - 125c/c
D12 - 125c/c
F F
FGL FGL
H H
CONNECTION TO FUTURE
DN800 HDPE PIPELINE TENDER
SECTION B-B
D12 - 125c/c
J (REINFORCEMENT DETAIL) J
1:25
FGL FGL Required lap length for covering concrete grade: C25/30 Lap length based on following principles: 0.2 12.01.24 PROTECTION MEMBRANE JC FvdG AH
0.1 25.08.23 FOR TENDER JC FvdG AH
Average cube strength for demoulding of: -Reinforcing steel B400B
supporting formwork; fcm, cube ≥ 33 N/mm², -σ sd = 350N/mm² REV DATE DESCRIPTION BY CHK APP
Filename : C:\Users\za00255\Box\BF2100-141 - Water Harvesting\Activity 06 - M&E\Pipelines\Details\BF2100-141-6-P-204&204R_Typical Details_Connection Chambers.dwg - Scaled and derived dimensions are only applicable if printed at Actual Size on the recommended paper size.
non-supporting formwork; fcm, cube ≥ 3,5 N/mm². -Cd = min. 70mm; bars c.t.c.100mm
REVISIONS
If the (based on the mixture calculation) expected average cube strength at 28 days (fcm,28) is -α 1 = α 3 = α 5 = 1
higher than fck + 18 N/mm² contact with the structural engineer is required. Minimum -α 6 = 1.4 PROJECT
after-treatment to be agreed with the structural engineer. Support bars in cover hot galvanizing -Ρ = 50%
K D12 - 125c/c D12 - 125c/c counted with support bars in cover NUMEIRA INTAKE PUMP K
1 Lap length main reinforcement run staggered the
Other principles:
- Cement kind: CEM I 42,5
Definition cover and support bar: following way. STATION AND PIPELINE WORKS
- Reinforcement marked with * are practical CLIENT
≥ 1,3lo
where the length is based on Lo,min. Hashemite Kingdom of Jordan
- Not meant for steel mesh.
- Concrete covers on the basis of Δ Cdev=10mm.
≥ lo The Arab Potash Company Ltd.
EXISTING DI EXISTING DI - Lap length bar bundles according specifications support bar Cover 70 ≥ lo
direction of
400
≥50
loading
NUMEIRA RESERVOIR P/S
≥10ø
≥lo
1 2 3 4 5
TYPICAL DETAILS - REBAR
≥lo
D12 - 125c/c CONNECTION CHAMBERS
Definition 'diameter of mandrel' Lap length (lo) [mm]
d=inner diameter
straight bars and bars Laan 1914, nr 35
≤ ø16: d=4ø * practical bars (lo,min) 3818 EX Amersfoort
M >ø16: d=5ø
other than straight T: + 31 (0)88 348 20 00 M
www.royalhaskoning.com
d
ø standard top bar standard top bar
8 250 350 200 200
10 350 450 200 200
Definition topbar (bar without "good" bond conditions)
CONNECTION TO EXISTING DN700 DI PIPELINE 12 400 550 200 250
direction of concreting direction of concreting direction of concreting
SECTION A-A 14 450 650 250 300 DRAWN CHECKED APPROVED
>250
>550
500 0 500 1000 1500 2000 2500mm 20
DATE PAPER - SCALE REVISION
1:25 =250 750 1050 300 400 12.01.2024 A1 - 1:25 0.2
25 1000 1450 400 500 DRAWING No.
N 1:25 (A1) 1:50 (A3) No top bar Top bar in hatched zone
N
32 1400 2000 500 600
BF2100-141-6-P-204R
Concrete structures shall be executed in accordance with EN 206-1, ENV 13670, BS-EN 1992-1-1 and BS-EN 1992-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16