SW Injection From APK

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

SIGNATURE

REV REVISION & DESCRIPTION DATE


CHKD APPD
ADDED SAMPLING VALVE NUMBER BY YARD COMMENT.
REVISED SUPPLY SCOPE OF SAMPLING VALVE BY YARD COMMENT.
ADDED SAFETY FEATURE (PS,PI) FOR ECU BY MAKER REVISED.
S.S.CHOI B.O.IM 2013.07.02
A CHANGED VALVES NUMBER IN ECU ROOM BY YARD COMMENT.
ADDED VALVE AT BALLAST LINE BY YARD COMMENT.
ADDED AIR PUMP UNIT OF ANU BOOSTER LINE.
YARD SCOPE
G ADDED MIXING OPERATION BY OWNER REQUEST. - Y.G.KIM 2019.05.30
DETAIL "MIXING POINT"
BALLAST PIPE LINE

*
SHORT
ELBOW
FLOW
VCU
65A
(SCH40)
125A
(SCH40)
(VALVE
SIGNAL CONTROL
FOR BWMS UNIT)

* M2
EX-FCV02
10K-65A
"MIXING POINT"

AS FAR AS PRACTICABLE
(MIN.5D)

SIGNAL
FOR BWMS

* M1
EX-FCV01
10K-65A

"MIXING POINT"

AS FAR AS PRACTICABLE
(MIN.5D)

NOTE.
1. CABLE AND PIPE SHOULD BE IN COMPLIANCE WITH RELATED AGREEMENTS AND CLASS REGULATION.
2. G-2 SAMPLING PORTS COMPLY WITH IMO REGULATION AND OTHER SAMPLING PORTS ARE MAKER'S RECOMMENDATION.
3. VALVE SIGNAL IS USED TO OPERATE ELECTRO CLEEN SYSTEM.
4. KEEP MIN' 5D INSTALLATION POSITION DISTANCE BETWEEN TSU AND ANU PORTS.
ECS COMPONENTS LIST ECS CONNECTION LIST ITEM DESCRIPTION SCOPE ITEM DESCRIPTION SCOPE
5. THE LEVEL OF TSU SAMPLING PORT SHOULD BE SAME AS OR LOWER THAN BALLAST PIPE LINE FOR PROPER SAMPLING.
ITEM DESCRIPTION SCOPE ITEM CONNECTION SIZE BUTTERFLY VALVE YARD CROSSING PIPES CONNECTED YARD IF THE POSITION OF TSU IS 4M HIGHER THAN BALLAST PIPE LINE, AN ADDITIONAL BOOSTER PUMP(AIR DRIVEN PUMP)
ECU IS NECESSARY BETWEEN THE SAMPLING PORT AND TSU.
EX-ECU EX-PROOF ELECTRO CHAMBER UNIT MAKER ≤600B INLET / OUTLET JIS 10K - 250A, DRAIN : 5K - 15A GLOBE VALVE YARD BRANCH PIPES YARD
6. TSU SAMPLING PORT(S) MUST BE PLACED AT HORIZONTAL PIPE.
PDE POWER DISTRIBUTOR EQUIPMENT MAKER ECU INLET / OUTLET JIS 10K - 350A, DRAIN : 5K - 25A
≥750B CHECK VALVE YARD TEE PIECE (FLANGE END) YARD 7. TSU SAMPLING PIPE(BETWEEN TSU AND SAMPLING PORT) & ANU INJECTION PIPE
PRU POWER RECTIFIER UNIT MAKER PDE NON PIPE CONNECTION (BETWEEN ANU AND ANU INJECTION PORT) TO BE ARRANGED AS SHORT AS POSSIBLE(WITHIN 10M).
BALL VALVE YARD CROSSING PIPES YARD
ANU AUTO NEUTRALIZATION UNIT MAKER PRU INLET / OUTLET COPPER TUBE Φ12
BALL VALVE(FLANGE) YARD NOT CONNECTED YARD HULL NO. PROJECT NAME ECS SYSTEM
EX-TSU TRO SENSOR UNIT MAKER ANU INLET / OUTLET FLEXIBLE HOSE JIS 5K - 15A
DIAPHRAGM VALVE YARD PUMP YARD ST SHIPPING
EX-FMU FLOW METER UNIT MAKER EX-FMU INLET / OUTLET FLANGE JIS OR DIN 100A ~ 700A H-4098/99 EX-750B X 2SETS
VALVE SIGNAL YARD 4098/99
EX-FTS FRESH WATER TEMPERATURE SENSOR MAKER EX-FTS INLET / OUTLET FLANGE JIS 5K - 40A ANGLE VALVE YARD DWG. NAME
DATE : 2013.02.28
MAKER EDUCTOR YARD BALLAST PIPE LINE DIAGRAM
EX-CSU CONDUCTIVITY SENSOR UNIT EX-CSU INLET / OUTLET FLANGE JIS 5K - 50A APPD BY B.O.IM
VLS VIBERATION LEVEL SENSOR MAKER HEU INLET / OUTLET FLANGE JIS 5K - 50A STRAINER YARD FLEXIBLE HOSE MAKER DWG. NO.
CHKD BY B.C.KIM SHEET NO : 1 OF 4
HEAT EXCHANGE UNIT MAKER MAKER
HEU
EX-FTU EX-F.W TANK UNIT MAKER
EX-FTU INLET / OUTLET FLANGE JIS 10K - 40A / 5K - 40A REDUCER
BLIND FLANGE
YARD
YARD * MAKER SUPPLY DSND BY S.H.LEE
SIZE : A3 WEIGHT : - KG UNIT: - mm SCALE : N / S
REV. G
SIGNATURE
REV REVISION & DESCRIPTION DATE
CHKD APPD
ADDED SAMPLING VALVE NUMBER BY YARD COMMENT.
WATER FLOW DIAGRAM FOR REVISED SUPPLY SCOPE OF SAMPLING VALVE BY YARD COMMENT.
ADDED SAFETY FEATURE (PS,PI) FOR ECU BY MAKER REVISED.
MIXING BALLASTING OPERATION A CHANGED VALVES NUMBER IN ECU ROOM BY YARD COMMENT.
ADDED VALVE AT BALLAST LINE BY YARD COMMENT.
S.S.CHOI B.O.IM 2013.07.02

ADDED AIR PUMP UNIT OF ANU BOOSTER LINE.


THICK LINES( ) REPRESENT THE WATER FLOW, ADDED MIXING OPERATION BY OWNER REQUEST. - Y.G.KIM 2019.05.30
G
ALL VALVES ON THE RELATED
PIPE LINE SHOULD BE OPEN BEFORE OPERATION OF EQUIPMENT.
THE VALVES ON THE OTHER PIPE LINES SHOULD BE CLOSED.

VALVE OPEN VALVE CLOSE


VCU
(VALVE
*
SIGNAL CONTROL
FRESH WATER LINE (0 PSU) --- 95.7% FOR BWMS UNIT)
SEA WATER LINE (34.7 PSU) --- 4.3%

MIXED WATER LINE (1.5 PSU)


* M2
EX-FCV02
TSU SAMPLING LINE 10K-65A
"MIXING POINT"

AS FAR AS PRACTICABLE
(MIN.5D)

SIGNAL
FOR BWMS

* M1
EX-FCV01
10K-65A

"MIXING POINT"

AS FAR AS PRACTICABLE
(MIN.5D)

NOTE.
1. CABLE AND PIPE SHOULD BE IN COMPLIANCE WITH RELATED AGREEMENTS AND CLASS REGULATION.
2. G-2 SAMPLING PORTS COMPLY WITH IMO REGULATION AND OTHER SAMPLING PORTS ARE MAKER'S RECOMMENDATION.
3. VALVE SIGNAL IS USED TO OPERATE ELECTRO CLEEN SYSTEM.
4. KEEP MIN' 5D INSTALLATION POSITION DISTANCE BETWEEN TSU AND ANU PORTS.
ECS COMPONENTS LIST ECS CONNECTION LIST ITEM DESCRIPTION SCOPE ITEM DESCRIPTION SCOPE
5. THE LEVEL OF TSU SAMPLING PORT SHOULD BE SAME AS OR LOWER THAN BALLAST PIPE LINE FOR PROPER SAMPLING.
ITEM DESCRIPTION SCOPE ITEM CONNECTION SIZE BUTTERFLY VALVE YARD CROSSING PIPES CONNECTED YARD IF THE POSITION OF TSU IS 4M HIGHER THAN BALLAST PIPE LINE, AN ADDITIONAL BOOSTER PUMP(AIR DRIVEN PUMP)
ECU IS NECESSARY BETWEEN THE SAMPLING PORT AND TSU.
EX-ECU EX-PROOF ELECTRO CHAMBER UNIT MAKER ≤600B INLET / OUTLET JIS 10K - 250A, DRAIN : 5K - 15A GLOBE VALVE YARD BRANCH PIPES YARD
6. TSU SAMPLING PORT(S) MUST BE PLACED AT HORIZONTAL PIPE.
PDE POWER DISTRIBUTOR EQUIPMENT MAKER ECU INLET / OUTLET JIS 10K - 350A, DRAIN : 5K - 25A
≥750B CHECK VALVE YARD TEE PIECE (FLANGE END) YARD 7. TSU SAMPLING PIPE(BETWEEN TSU AND SAMPLING PORT) & ANU INJECTION PIPE
PRU POWER RECTIFIER UNIT MAKER PDE NON PIPE CONNECTION (BETWEEN ANU AND ANU INJECTION PORT) TO BE ARRANGED AS SHORT AS POSSIBLE(WITHIN 10M).
BALL VALVE YARD CROSSING PIPES YARD
ANU AUTO NEUTRALIZATION UNIT MAKER PRU INLET / OUTLET COPPER TUBE Φ12
BALL VALVE(FLANGE) YARD NOT CONNECTED YARD HULL NO. PROJECT NAME ECS SYSTEM
EX-TSU TRO SENSOR UNIT MAKER ANU INLET / OUTLET FLEXIBLE HOSE JIS 5K - 15A
DIAPHRAGM VALVE YARD PUMP YARD ST SHIPPING
EX-FMU FLOW METER UNIT MAKER EX-FMU INLET / OUTLET FLANGE JIS OR DIN 100A ~ 700A H-4098/99 EX-750B X 2SETS
VALVE SIGNAL YARD 4098/99
EX-FTS FRESH WATER TEMPERATURE SENSOR MAKER EX-FTS INLET / OUTLET FLANGE JIS 5K - 40A ANGLE VALVE YARD DWG. NAME
DATE : 2013.02.28
MAKER EDUCTOR YARD WATER FLOW DIAGRAM FOR MIXING BALLASTING OPERATION
EX-CSU CONDUCTIVITY SENSOR UNIT EX-CSU INLET / OUTLET FLANGE JIS 5K - 50A APPD BY B.O.IM
VLS VIBERATION LEVEL SENSOR MAKER HEU INLET / OUTLET FLANGE JIS 5K - 50A STRAINER YARD FLEXIBLE HOSE MAKER DWG. NO.
CHKD BY B.C.KIM SHEET NO : 1 OF 4
HEAT EXCHANGE UNIT MAKER MAKER
HEU
EX-FTU EX-F.W TANK UNIT MAKER
EX-FTU INLET / OUTLET FLANGE JIS 10K - 40A / 5K - 40A REDUCER
BLIND FLANGE
YARD
YARD * MAKER SUPPLY DSND BY S.H.LEE
SIZE : A3 WEIGHT : - KG UNIT: - mm SCALE : N / S
REV. G
SIGNATURE
REV DATE REVISION DESCRIPTION
CHKD APPD
ADDED VALVE CONTROL UNIT BY MAKER REVISED. - B.O.IM
A 2013.08.02
ADDED VALVE AT BALLAST LINE BY YARD COMMENT.

E 2014.01.22 ADDED CABLES NO.BY YARD COMMENT. - B.O.IM

G 2019.05.30 ADDED MIXING OPERATION BY OWNER REQUEST. - Y.G.KIM

DPYC-2.5(AC220V) DPYCY-2.5 (AC220V)


VCU MPYCYS-7 Ex-FCV NO.1 FLOW CONTROL VALVE
MPYC-12 (VALVE (4~20mA & DC24V & DRY CONTACT)
(DRY CONTACT) CONTROL
UNIT) DPYCY-2.5 (AC220V)
MPYCS-4 MPYCYS-7 Ex-FCV NO.2 FLOW CONTROL VALVE
(4~20mA) (4~20mA & DC24V & DRY CONTACT)

MPYC-2 (DRY CONTACT)


ZS TE01V NO.1 MIXING VALVE (V/V:LITTLE OPEN = SIGNAL:ON)

MPYC-2 (DRY CONTACT)


ZS TE02V NO.2 MIXING VALVE (V/V:LITTLE OPEN = SIGNAL:ON)

* TABLE 1
LINE DESCRIPTION HULL NO. PROJECT NAME ECS SYSTEM
LINE NAME SUPPLY CABLING ST SHIPPING
H-4098/99 EX-750B X 2SETS
EQUIPMENT MAKER - 4098/99
EQUIPMENT YARD - DATE : 2013.02.28 DWG. NAME
CABLE
ELECTRIC WIRING DIAGRAM
YARD YARD APPD BY B.O.IM
DWG. NO.
* CABLE MAKER YARD CHKD BY B.C.KIM SHEET NO : 3 OF 4
CABLE MAKER MAKER DSND BY S.H.LEE
SIZE : A4 WEIGHT : - KG UNIT : - mm SCALE : N / S
REV. G
SIGNATURE
REV REVISION & DESCRIPTION DATE
CHKD APPD
Revised installation location of CSU by yard comment.
A Added pipe size and valve number by yard comment. S.S.CHOI B.O.IM 2013.07.23
Added Safety Feature(PS,PI) for ECU by maker revised.

F DELETED FIRE & G/S PUMP BY YARD COMMENT. - B.O.IM 2014.02.21

G ADDED MIXING OPERATION BY OWNER REQUEST. - Y.G.KIM 2019.05.30

ENGINE ROOM
BG31-B2X-150A

SEE PRU COOLING ECU


SYSTEM DWG.
BT007 BT008
300B
200/250 250/150

TO TSU
DRAIN

T1
T-STRAINER

AIR PUMP

FROM ANU
A1
10K-200A
BT016

BT011
SIGNAL

DETAIL 'B'
DETAIL 'A'
TO PDE 150/200
SIGNAL SIGNAL BT017

TO PDE
SIGNAL
TO PDE 10K-15A TO PDE

BT004

BT006
BT003

10K-25A
10K-150A 10K-150A 10K-150A
FMU A.P.T
BG61 BT010 BT013 BG23
MIN.2D MIN.1D MIN.1D
STRAIGHT STRAIGHT DETAIL 'C'
BT023
MIN.2D
SAMPLING
PORT (G2)
50A

TO PDE
SIGNAL

BT012
FIRE & BILGE
PUMP
(280/145m3/h
x40/100mTH)
BG41 BT018
O.B
BG48
100A

FM SEA CHEST
BG40

ON DECK (HAZARDOUS AREA) SIGNAL


FOR BWMS
ECU ROOM 2 (HAZARDOUS AREA)
ZS
65A
TE02V
M2 TO ECU ROOM 2

SIGNAL
FOR BWMS
ECU ROOM 1 (HAZARDOUS AREA)
SPOOL PIECE ZS
65A
TE01V
M1 TO ECU ROOM 1

HULL NO. PROJECT NAME ECS SYSTEM


ST SHIPPING
H-4098/99 300B X 1SET
4098/99
DATE : 2013.04.30 DWG. NAME
BALLAST PIPE LINE DIAGRAM
APPD BY B.O.IM
CHKD BY B.C.KIM DWG. NO. SHEET NO : 1 OF 2
DSND BY S.H.LEE
SIZE : A3 WEIGHT : - KG UNIT: - mm SCALE : N / S
REV. G
SIGNATURE
REV REVISION & DESCRIPTION DATE
CHKD APPD
Revised installation location of CSU by yard comment.
A Added pipe size and valve number by yard comment. S.S.CHOI B.O.IM 2013.07.23
Added Safety Feature(PS,PI) for ECU by maker revised.

F DELETED FIRE & G/S PUMP BY YARD COMMENT. - B.O.IM 2014.02.21

G ADDED MIXING OPERATION BY OWNER REQUEST. - Y.G.KIM 2019.05.30

BG31-B2X-150A

SEE PRU COOLING


SYSTEM DWG.
BT008

T-STRAINER

BT011

DETAIL 'B'
SIGNAL SIGNAL

TO PDE
SIGNAL
TO PDE TO PDE

BT006
BT004
BT003

BG61 BT010 BT013 BG23

(280/145m3/h
x40/100mTH)
BG41
BG48
100A

BG40

ON DECK (HAZARDOUS AREA) SIGNAL


FOR BWMS
ECU ROOM 2 (HAZARDOUS AREA) WATER FLOW DIAGRAM FOR
ZS
65A
M2 TO ECU ROOM 2 MIXING BALLASTING OPERATION
TE02V
THICK LINES( ) REPRESENT THE WATER FLOW,

SIGNAL
FOR BWMS
ECU ROOM 1 (HAZARDOUS AREA) ALL VALVES ON THE RELATED

SPOOL PIECE ZS
PIPE LINE SHOULD BE OPEN BEFORE OPERATION OF EQUIPMENT.
65A
TE01V
M1 TO ECU ROOM 1 THE VALVES ON THE OTHER PIPE LINES SHOULD BE CLOSED.

VALVE OPEN VALVE CLOSE

FRESH WATER LINE (0 PSU) --- 95.7%

SEA WATER LINE (34.7 PSU) --- 4.3%

MIXED WATER LINE (1.5 PSU)

TSU SAMPLING LINE

HULL NO. PROJECT NAME ECS SYSTEM


ST SHIPPING
H-4098/99 300B X 1SET
4098/99
DATE : 2013.04.30 DWG. NAME
WATER FLOW DIAGRAM FOR MIXING BALLASTING OPERATION
APPD BY B.O.IM
CHKD BY B.C.KIM DWG. NO. SHEET NO : 1 OF 2
DSND BY S.H.LEE
SIZE : A3 WEIGHT : - KG UNIT: - mm SCALE : N / S
REV. G