SW Injection From APK
SW Injection From APK
SW Injection From APK
*
SHORT
ELBOW
FLOW
VCU
65A
(SCH40)
125A
(SCH40)
(VALVE
SIGNAL CONTROL
FOR BWMS UNIT)
* M2
EX-FCV02
10K-65A
"MIXING POINT"
AS FAR AS PRACTICABLE
(MIN.5D)
SIGNAL
FOR BWMS
* M1
EX-FCV01
10K-65A
"MIXING POINT"
AS FAR AS PRACTICABLE
(MIN.5D)
NOTE.
1. CABLE AND PIPE SHOULD BE IN COMPLIANCE WITH RELATED AGREEMENTS AND CLASS REGULATION.
2. G-2 SAMPLING PORTS COMPLY WITH IMO REGULATION AND OTHER SAMPLING PORTS ARE MAKER'S RECOMMENDATION.
3. VALVE SIGNAL IS USED TO OPERATE ELECTRO CLEEN SYSTEM.
4. KEEP MIN' 5D INSTALLATION POSITION DISTANCE BETWEEN TSU AND ANU PORTS.
ECS COMPONENTS LIST ECS CONNECTION LIST ITEM DESCRIPTION SCOPE ITEM DESCRIPTION SCOPE
5. THE LEVEL OF TSU SAMPLING PORT SHOULD BE SAME AS OR LOWER THAN BALLAST PIPE LINE FOR PROPER SAMPLING.
ITEM DESCRIPTION SCOPE ITEM CONNECTION SIZE BUTTERFLY VALVE YARD CROSSING PIPES CONNECTED YARD IF THE POSITION OF TSU IS 4M HIGHER THAN BALLAST PIPE LINE, AN ADDITIONAL BOOSTER PUMP(AIR DRIVEN PUMP)
ECU IS NECESSARY BETWEEN THE SAMPLING PORT AND TSU.
EX-ECU EX-PROOF ELECTRO CHAMBER UNIT MAKER ≤600B INLET / OUTLET JIS 10K - 250A, DRAIN : 5K - 15A GLOBE VALVE YARD BRANCH PIPES YARD
6. TSU SAMPLING PORT(S) MUST BE PLACED AT HORIZONTAL PIPE.
PDE POWER DISTRIBUTOR EQUIPMENT MAKER ECU INLET / OUTLET JIS 10K - 350A, DRAIN : 5K - 25A
≥750B CHECK VALVE YARD TEE PIECE (FLANGE END) YARD 7. TSU SAMPLING PIPE(BETWEEN TSU AND SAMPLING PORT) & ANU INJECTION PIPE
PRU POWER RECTIFIER UNIT MAKER PDE NON PIPE CONNECTION (BETWEEN ANU AND ANU INJECTION PORT) TO BE ARRANGED AS SHORT AS POSSIBLE(WITHIN 10M).
BALL VALVE YARD CROSSING PIPES YARD
ANU AUTO NEUTRALIZATION UNIT MAKER PRU INLET / OUTLET COPPER TUBE Φ12
BALL VALVE(FLANGE) YARD NOT CONNECTED YARD HULL NO. PROJECT NAME ECS SYSTEM
EX-TSU TRO SENSOR UNIT MAKER ANU INLET / OUTLET FLEXIBLE HOSE JIS 5K - 15A
DIAPHRAGM VALVE YARD PUMP YARD ST SHIPPING
EX-FMU FLOW METER UNIT MAKER EX-FMU INLET / OUTLET FLANGE JIS OR DIN 100A ~ 700A H-4098/99 EX-750B X 2SETS
VALVE SIGNAL YARD 4098/99
EX-FTS FRESH WATER TEMPERATURE SENSOR MAKER EX-FTS INLET / OUTLET FLANGE JIS 5K - 40A ANGLE VALVE YARD DWG. NAME
DATE : 2013.02.28
MAKER EDUCTOR YARD BALLAST PIPE LINE DIAGRAM
EX-CSU CONDUCTIVITY SENSOR UNIT EX-CSU INLET / OUTLET FLANGE JIS 5K - 50A APPD BY B.O.IM
VLS VIBERATION LEVEL SENSOR MAKER HEU INLET / OUTLET FLANGE JIS 5K - 50A STRAINER YARD FLEXIBLE HOSE MAKER DWG. NO.
CHKD BY B.C.KIM SHEET NO : 1 OF 4
HEAT EXCHANGE UNIT MAKER MAKER
HEU
EX-FTU EX-F.W TANK UNIT MAKER
EX-FTU INLET / OUTLET FLANGE JIS 10K - 40A / 5K - 40A REDUCER
BLIND FLANGE
YARD
YARD * MAKER SUPPLY DSND BY S.H.LEE
SIZE : A3 WEIGHT : - KG UNIT: - mm SCALE : N / S
REV. G
SIGNATURE
REV REVISION & DESCRIPTION DATE
CHKD APPD
ADDED SAMPLING VALVE NUMBER BY YARD COMMENT.
WATER FLOW DIAGRAM FOR REVISED SUPPLY SCOPE OF SAMPLING VALVE BY YARD COMMENT.
ADDED SAFETY FEATURE (PS,PI) FOR ECU BY MAKER REVISED.
MIXING BALLASTING OPERATION A CHANGED VALVES NUMBER IN ECU ROOM BY YARD COMMENT.
ADDED VALVE AT BALLAST LINE BY YARD COMMENT.
S.S.CHOI B.O.IM 2013.07.02
AS FAR AS PRACTICABLE
(MIN.5D)
SIGNAL
FOR BWMS
* M1
EX-FCV01
10K-65A
"MIXING POINT"
AS FAR AS PRACTICABLE
(MIN.5D)
NOTE.
1. CABLE AND PIPE SHOULD BE IN COMPLIANCE WITH RELATED AGREEMENTS AND CLASS REGULATION.
2. G-2 SAMPLING PORTS COMPLY WITH IMO REGULATION AND OTHER SAMPLING PORTS ARE MAKER'S RECOMMENDATION.
3. VALVE SIGNAL IS USED TO OPERATE ELECTRO CLEEN SYSTEM.
4. KEEP MIN' 5D INSTALLATION POSITION DISTANCE BETWEEN TSU AND ANU PORTS.
ECS COMPONENTS LIST ECS CONNECTION LIST ITEM DESCRIPTION SCOPE ITEM DESCRIPTION SCOPE
5. THE LEVEL OF TSU SAMPLING PORT SHOULD BE SAME AS OR LOWER THAN BALLAST PIPE LINE FOR PROPER SAMPLING.
ITEM DESCRIPTION SCOPE ITEM CONNECTION SIZE BUTTERFLY VALVE YARD CROSSING PIPES CONNECTED YARD IF THE POSITION OF TSU IS 4M HIGHER THAN BALLAST PIPE LINE, AN ADDITIONAL BOOSTER PUMP(AIR DRIVEN PUMP)
ECU IS NECESSARY BETWEEN THE SAMPLING PORT AND TSU.
EX-ECU EX-PROOF ELECTRO CHAMBER UNIT MAKER ≤600B INLET / OUTLET JIS 10K - 250A, DRAIN : 5K - 15A GLOBE VALVE YARD BRANCH PIPES YARD
6. TSU SAMPLING PORT(S) MUST BE PLACED AT HORIZONTAL PIPE.
PDE POWER DISTRIBUTOR EQUIPMENT MAKER ECU INLET / OUTLET JIS 10K - 350A, DRAIN : 5K - 25A
≥750B CHECK VALVE YARD TEE PIECE (FLANGE END) YARD 7. TSU SAMPLING PIPE(BETWEEN TSU AND SAMPLING PORT) & ANU INJECTION PIPE
PRU POWER RECTIFIER UNIT MAKER PDE NON PIPE CONNECTION (BETWEEN ANU AND ANU INJECTION PORT) TO BE ARRANGED AS SHORT AS POSSIBLE(WITHIN 10M).
BALL VALVE YARD CROSSING PIPES YARD
ANU AUTO NEUTRALIZATION UNIT MAKER PRU INLET / OUTLET COPPER TUBE Φ12
BALL VALVE(FLANGE) YARD NOT CONNECTED YARD HULL NO. PROJECT NAME ECS SYSTEM
EX-TSU TRO SENSOR UNIT MAKER ANU INLET / OUTLET FLEXIBLE HOSE JIS 5K - 15A
DIAPHRAGM VALVE YARD PUMP YARD ST SHIPPING
EX-FMU FLOW METER UNIT MAKER EX-FMU INLET / OUTLET FLANGE JIS OR DIN 100A ~ 700A H-4098/99 EX-750B X 2SETS
VALVE SIGNAL YARD 4098/99
EX-FTS FRESH WATER TEMPERATURE SENSOR MAKER EX-FTS INLET / OUTLET FLANGE JIS 5K - 40A ANGLE VALVE YARD DWG. NAME
DATE : 2013.02.28
MAKER EDUCTOR YARD WATER FLOW DIAGRAM FOR MIXING BALLASTING OPERATION
EX-CSU CONDUCTIVITY SENSOR UNIT EX-CSU INLET / OUTLET FLANGE JIS 5K - 50A APPD BY B.O.IM
VLS VIBERATION LEVEL SENSOR MAKER HEU INLET / OUTLET FLANGE JIS 5K - 50A STRAINER YARD FLEXIBLE HOSE MAKER DWG. NO.
CHKD BY B.C.KIM SHEET NO : 1 OF 4
HEAT EXCHANGE UNIT MAKER MAKER
HEU
EX-FTU EX-F.W TANK UNIT MAKER
EX-FTU INLET / OUTLET FLANGE JIS 10K - 40A / 5K - 40A REDUCER
BLIND FLANGE
YARD
YARD * MAKER SUPPLY DSND BY S.H.LEE
SIZE : A3 WEIGHT : - KG UNIT: - mm SCALE : N / S
REV. G
SIGNATURE
REV DATE REVISION DESCRIPTION
CHKD APPD
ADDED VALVE CONTROL UNIT BY MAKER REVISED. - B.O.IM
A 2013.08.02
ADDED VALVE AT BALLAST LINE BY YARD COMMENT.
* TABLE 1
LINE DESCRIPTION HULL NO. PROJECT NAME ECS SYSTEM
LINE NAME SUPPLY CABLING ST SHIPPING
H-4098/99 EX-750B X 2SETS
EQUIPMENT MAKER - 4098/99
EQUIPMENT YARD - DATE : 2013.02.28 DWG. NAME
CABLE
ELECTRIC WIRING DIAGRAM
YARD YARD APPD BY B.O.IM
DWG. NO.
* CABLE MAKER YARD CHKD BY B.C.KIM SHEET NO : 3 OF 4
CABLE MAKER MAKER DSND BY S.H.LEE
SIZE : A4 WEIGHT : - KG UNIT : - mm SCALE : N / S
REV. G
SIGNATURE
REV REVISION & DESCRIPTION DATE
CHKD APPD
Revised installation location of CSU by yard comment.
A Added pipe size and valve number by yard comment. S.S.CHOI B.O.IM 2013.07.23
Added Safety Feature(PS,PI) for ECU by maker revised.
ENGINE ROOM
BG31-B2X-150A
TO TSU
DRAIN
T1
T-STRAINER
AIR PUMP
FROM ANU
A1
10K-200A
BT016
BT011
SIGNAL
DETAIL 'B'
DETAIL 'A'
TO PDE 150/200
SIGNAL SIGNAL BT017
TO PDE
SIGNAL
TO PDE 10K-15A TO PDE
BT004
BT006
BT003
10K-25A
10K-150A 10K-150A 10K-150A
FMU A.P.T
BG61 BT010 BT013 BG23
MIN.2D MIN.1D MIN.1D
STRAIGHT STRAIGHT DETAIL 'C'
BT023
MIN.2D
SAMPLING
PORT (G2)
50A
TO PDE
SIGNAL
BT012
FIRE & BILGE
PUMP
(280/145m3/h
x40/100mTH)
BG41 BT018
O.B
BG48
100A
FM SEA CHEST
BG40
SIGNAL
FOR BWMS
ECU ROOM 1 (HAZARDOUS AREA)
SPOOL PIECE ZS
65A
TE01V
M1 TO ECU ROOM 1
BG31-B2X-150A
T-STRAINER
BT011
DETAIL 'B'
SIGNAL SIGNAL
TO PDE
SIGNAL
TO PDE TO PDE
BT006
BT004
BT003
(280/145m3/h
x40/100mTH)
BG41
BG48
100A
BG40
SIGNAL
FOR BWMS
ECU ROOM 1 (HAZARDOUS AREA) ALL VALVES ON THE RELATED
SPOOL PIECE ZS
PIPE LINE SHOULD BE OPEN BEFORE OPERATION OF EQUIPMENT.
65A
TE01V
M1 TO ECU ROOM 1 THE VALVES ON THE OTHER PIPE LINES SHOULD BE CLOSED.