BOARD EXAMINATION PRACTICAL OCT- 2024

716 – NPR POLYTECHNIC COLLEGE

Register Number : Date :

Name : Time :

Semester/Branch code: 03-1030

Subject code/Name : 4030640 – Electrical Estimation and Costing Practical

MARK ALLOCATION

S.no DESCRIPTION MARKS ALLOTED MARKS OBTAINED

1 LAYOUT / DETAILS OF FITTING 20

2 LOAD CALCULATION 20

3 MATERIAL CALCULATION 30
MATERIAL SCHEDULE AND
4 25
APPROXIMATE COST
5 VIVA – VOCE 05

TOTAL 100

INTERNAL EXAMINER EXTERNAL EXAMINER


BOARD EXAMINATION PRACTICAL OCT- 2023

716 – NPR POLYTECHNIC COLLEGE

LIST OF EXPERIMENTS

1.To study the various Electrical Symbols, IE Rules 28, IE Rules 30, IE Rules 31,
IE Rules54, IE Rules 56, IE Rules 87.

2. To study the various types of Earthing.

3. To study the various types of Electrical Wiring Methods.

4. Estimate the quantity of material and cost required for Residential Building
(1BHK).

5. Estimate the quantity of material and cost required for Computer Centre having
10 Computers, AC Unit, UPS, Light and Fan.

6. Estimate the quantity of material and cost required for Industrial Power Wiring
having 4 Machines.

7. Estimate the quantity of material and cost required for street light service
having 12 Lamps Light Fitting.

8. Estimate the quantity of material and cost required for 3 Phase Service
connection to abuilding having 5KW Load.

9. Estimate the quantity of material and cost required for Irrigation Pump Wiring
(5HP).

10. Estimate the quantity of material and cost required for School Building having
3 Class Rooms.

11. Estimate the quantity of material and cost required for erection of a 15HP
Induction Motor in a Saw Mill/Flour Mill.

INTERNAL EXAMINER EXTERNAL EXAMINER


To study the various Electrical Symbols, IE Rules 28, IE Rules 30, IE Rules 31, IE
Rules54, IE Rules 56, IE Rules 87.

To study the various types of Earthing.

To study the various types of Electrical Wiring Methods.

Estimate the quantity of material and cost required for Residential Building
(1BHK).

Estimate the quantity of material and cost required for Computer Centre having 10
Computers, AC Unit, UPS, Light and Fan.

Estimate the quantity of material and cost required for Industrial Power Wiring
having 4 Machines.

Estimate the quantity of material and cost required for street light service having
12 Lamps Light Fitting.

Estimate the quantity of material and cost required for 3 Phase Service connection
to abuilding having 5KW Load.
Estimate the quantity of material and cost required for Irrigation Pump Wiring
(5HP).

Estimate the quantity of material and cost required for School Building having 3
Class Rooms.

Estimate the quantity of material and cost required for erection of a 15HP
Induction Motor in a Saw Mill/Flour Mill.