LOSC in Inbound Process
LOSC in Inbound Process
In case of LOSC, the goods can not be directly moved from source to final destination. It first goes from
source to ID (Intermediate) point and then from ID point to final destination. We can perform various
activities at ID point like relabeling, weight measurement, lift and conveyer belt etc.
We can use LOSC +POSC combination but POSC comes first. LOSC is mainly used in material flow system
(MFS). The signal from EWM to MFS system goes through programmable control system (PCS).LOSC
works only for the handling unit management.
Creating a new material using MM01, extending storage location 199S using MMSC and extending EWM
views using /n/scwm/mat1
1|P ag e
2|P ag e
Path
3|P ag e
Define warehouse process type
4|P ag e
5|P ag e
Define control indicators for determining warehouse process type
6|P ag e
Determine warehouse process type
Path
7|P ag e
Creating a storage bin using /n/scwm/ls01
Path
8|P ag e
Specify storage type search sequence for final putaway
Path
9|P ag e
Business Process
Scenario- I am assuming here that goods are directly coming to inbound staging area from vendor. The
goods are then moved to ID point and then finally reached to final destination.
10 | P a g e
11 | P a g e
Checking inbound delivery in warehouse monitor and creating warehouse task against the inbound
delivery
12 | P a g e
Two warehouse tasks created. One warehouse task for moving handling unit from inbound staging area
to ID point and one warehouse task for moving handling unit from ID point to final destination i.e.,
WAPR
Confirm the warehouse task for moving handling unit from inbound staging area to ID point
13 | P a g e
Status B is now disappeared for the other warehouse task. Confirm the final warehouse task.
14 | P a g e
Checking stock in MMBE
15 | P a g e
16 | P a g e