A330340 P18 Bleed Air System LS
A330340 P18 Bleed Air System LS
A330340 P18 Bleed Air System LS
Presented by:
Laurent Seguy
Pneumatics, Ice & Fire Protection
Group Manager
Customer Services
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 3
Content
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 4
Engine Bleed Air System, A330
15
5
A330 Fleet
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
0 0
2003 2004 2005 2006 2007 2008 2009 2010*
12%
Overtemperature
16 events
49%
39%
Overpressure
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
13 events
Operational Reliability
Significant Improvement since 2008
0,02
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
0,01
0
2007 2008 2009 2010*
Bleed Fault
50%
Resolution
High vibration levels confirmed on affected fleet engine, Aug/09
HPV damage consistent with measured spectrum
Options for installation change identified, Jan/10
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Way forward
Testing of improved installation, 3Q10
Industrial decision, 4Q10
Bleed Not
Closed
16%
• Ongoing investigation
Bleed Fault
50%
• Continue introduction of
28% improved carbon seals
•Solution for HPV
damage on GE engine
Investigation
Scenarionot reproduced in lab, even with suspected PRV’s
Dedicated ACMS set to record system status at time of failure
ACMS released to 3 operators, Jun/10
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Way forward
Preliminary check in TSM to avoid unjustified action, May/09
Action plan depends on ACMS outcome, 3Q10
Bleed Not
Closed
16%
Action plans
• Ongoing investigation
Bleed Fault
ongoing 50%
for all drivers
• Dual Bleed Loss solutions
HPV
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
• Continue introduction of
28% improved carbon seals
•Solution for HPV
damage on GE engine
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 16
Engine Bleed Air System, A340
Operational Reliability
Continuous improvement since 2007
No. of OI for 100 take-off
0,12
9New carbon seals for PRV, HPV
9ThS B05 continued introduction
0,1
-25%
0,08
0,06
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
0,04
0,02
0
2007 2008 2009 2010*
Bleed Fault
80%
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
• Continue introduction of
improved carbon seals
• Improve ThS senseline
installation
Issue
Cases of senseline breakage reported
Approx 60 spare parts ordered in 2009
AIR ENGi BLEED FAULT at cockpit, GO-IF
Resolution
Pre-loadingat installation is a contributor
FEM & tap test demonstrated that failure is vibration induced
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Added attachment bracket proven effective: FEM, tap test and trial
Way forward
Airbus SB 36-4034, target 3Q10
HPV
13%
• Continue introduction of
improved carbon seals
• Improve ThS senseline
installation
Issue
High not-confirmed rate (50 %)
Reliability below expectations, MTBUR 10,000 FH
Resolution
Not-confirmed removals: 70 % of HPV messages cleared by action at
interface level or harness replacement
HPV failures: main driver is solenoid sub-assembly
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Way forward
Check harness installation as per Rohr VSB
Higher attention to harness condition during T/S
Upgrade HPV to Amdt A with improved solenoid, Jan/09
HPV
13%
Improvement
• Reduce not confirmed plan Bleed Fault
removals
• Increase lifetime for main drivers 80%
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
• Continue introduction of
improved carbon seals
• Improve ThS senseline
installation
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 23
OverHeat Detection System
Impact of SFAR88
Reinforced monitoring of APU leak detection
Loss of detection requires immediate maintenance action
– Software upgrade available, FOC monitored retrofit:
• A330: BMC M4 (done) and FWC T3 (on-going)
• A340: BMC L6 (done) and FWC L11 (on-going)
– Rule applicable 31st July 2010
Complete FWC upgrade
0,03
- 47%
0,02
0,01
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
0
pre SB post SB
Pay-back
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Pre-mod OR
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 27
A340-500/600
Operational Reliability
Engine Bleed Air System
No. of O.I. for 100 take-off
0,08
A340-200/300, 2009
0,07
0,06
0,05
0,04
0,03
0,02
0,01
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
0
2007 2008 2009 2010*
Improved precooler
Issue
Heavy leakage developing around at 20,000 to 30,000 FH
AIR ENGi BLEED LEAK at cockpit – NO GO
Resolution
Periodic
check to mitigate exposure to on-wing failures
New precooler –C02 validated through back-to-back testing
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Way forward
Spares situation to be secured until –C02 units availability
Airbus SB 36-5024 to be released Jun/10
New PCE available from Liebherr by Jan/11
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 31
A330 & A340, Dual Pack Flow Reduction
Issue
Cases of ECAM message ‘EXCESS CAB ALT’ in cruise
Resolution
Root cause:
– Humidity at high altitude contributes to icing of main heat exchanger
– Air flow through the pack is reduced
More robust Pack Controller logics required to prevent icing
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Way forward
. Pack Controller software upgrade for all standards
. Monitored FOC retrofit started, 3 year objective
A340-500/600
Operational reliability: Improved precooler
Dual Pack flow reduction
Conclusion
Bleed air system Page 33
Conclusion
A330
Significant OR improvement in 2009
Dual Bleed Loss: solutions available by end 2010
Additional improvement to come with solutions to
– PRV ‘Bleed Not Closed’ messages
– HPV on GE engine
A340-200/300
Continued OR improvement
– Improved installation of ThS senseline
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
A330 Documentation
Subject Reference
Latest PN & interchangeability SIL 36-051
A340-200/300 Documentation
Subject Reference
Latest PN & interchangeability SIL 36-053
ThS senseline, installation improvement TFU 36.11.00.064
HPV, High Not Confirmed removal rate TFU 36.11.00.058
VSB 6753-36-05
HPV, improved Solenoid
and 6753D-36-03
SB 36-4024, 36-4029,
PTFE Seals
36-4032
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
A340-500/600 Documentation
Subject Reference
Precooler Leakage TFU 36.11.00.063
Periodic inspection of Precooler –B01 and –C01 SB 36-5023
Improved Precooler –C02 SB 36-5024
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Other documentation
Subject Reference
Bleed Valves: new carbon seals VSIL LSF1958-13
ThC preventive action for external filter clogging SIL 36-055