QUOTATION FOR FIRST RUNNING ( PIPING THE WALL ALONE)
CONDICT WORK IS ONLY CALCULATED
DATE: 18-06-2020
LOCATION : LAFENWA ABEOKUTA
Description of materials. # per unit. Total unit
3 pieces of ½” pipe @ 650 each 1,950
15 pieces of ½” elbow @ 70 each. 1,055
5 pieces of ½” tee @ 70 each. 350
13 pieces of ½”caplug @ 50 each. 650
7. Pieces of ¾” pipe @800 each. 5,600
16. Pieces of ✓ elbow @80 each. 1,280
5. Pieces of ✓ tee. @80 each. 400
4 pieces of ✓ socket. @80 each. 320
6 pieces of ¾”by ½” elbow. @80 each. 480
5 pieces of ✓ ✓✓. Tee. @80 each. 400
12 pieces of ¾” adaptor @80 each. 960
5 pics of ¾” gatevalve rambo @2500 each. 12,500
6. Pieces of 2” pipe @1200 each. 7,200
8. Pieces of 2” bend. @ 250 each. 2,000
6. Pieces of ✓ tee. @300 each. 1,800
4. Pieces of ✓ Y tee. @300 each. 1,200
4. Pieces of ✓ 45 bend @ 250 each. 1,000
6 pieces of 4” pipe. @1900 each. 11,400
7. Pieces of 4” bend(imported) @700 each. 4,900
4. Pieces of 4” tee.(imported). @900 each. 3,600
4. Pieces of 4” vent cap import @ 300 each. 1,200
4. Pieces of 2” floor drain @ 700 each. 2,800
2. Pieces of thread tape. @250 each. 500
1. Pieces of big gum. @3000 3,000
TRANSPORTATION. 5,000
TOTAL MATERIALS. = 71,540
Workmanship. 45,000
NOTE
The quotation stated above does not include outside pipe that will later connect to the soak
away/ septic tank. The calculation will be done if the level of the compound has been taken and
digging of the soak away has been put In place, to avoid future challenges. Thanks…