Project Documents
Project Documents
Rourkela
DATE:
Internal Examiner:
Name: ___________________
Signature:
TABLE OF CONTENTS
SNO DESCRIPTION PAGENO
01 ACKNOWLEDGEMENT 01
02 INTRODUCTION 02
04 PROPOSED SYSTEM 04
05 SYSTEM DEVELOPMENT LIFE CYCLE 05
06 PHASES OF SYSTEM DEVELOPMENT 06 - 12
LIFE CYCLE
07 FLOWCHART 13
09 OUTPUT 17-18
10 CONCLUSION 19
12 BIBLIOGRAPHY 21
ACKNOWLEDGEMENT
In the accomplishment of this project successfully, many people
have best owned upon me their blessings and the heart pledged
support. This time I am utilizing to thank all the people who have
been concerned with this project.
One has to use the data management software. Software has been an ascent
in atomization various organizations. Many software products working are now
in markets, which have helped in making the organizations work easier and
efficiently. Data management initially had to maintain a lot of ledgers and a lot
of paper work has to be done but now software product on this organization has
made their work faster and easier. Now only this software has to be loaded on
the computer and work can be done.
This prevents a lot of time and money. The work becomes fully automated
and any information regarding the organization can be obtained by clicking the
button. Moreover, now it’s an age of computers of and automating such an
organization gives the better look.
SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)
PLANNING PHASE
The planning phase is the most critical step in completing development,
acquisition, and maintenance projects. Careful planning, particularly in the early
stages of a project, is necessary to coordinate activities and manage project risks
effectively. The depth and formality of project plans should be commensurate
with the characteristics and risks of a given project. Project plans refine the
information gathered during the initiation phase by further identifying the
specific activities and resources required to complete a project.
A critical part of a project manager’ sjob is to coordinate discussions
between user, audit, security, design, development, and network personnel to
identify and document as many functional, security, and network requirements
as possible. During this phase, a plan is developed that documents the approach
to be used and includes a discussion of methods, tools, tasks, resources, project
schedules, and user input. Personnel assignments, costs, project schedule, and
target dates are established.
A Project Management Plan is created with components related to
acquisition planning, configuration management planning, quality assurance
planning, concept of operations, system security, verification and validation, and
systems engineering management planning.
REQUIREMENTS ANALYSIS PHASE
This phase formally defines the detailed functional user requirements using
high-level requirements identified in the Initiation, System Concept, and
Planning phases. It also delineates the requirements in terms of data, system
performance, security, and maintainability requirements for the system. The
requirements are defined in this phase to alevel of detail sufficient for systems
design to proceed. They need to be measurable, testable, and relate to the
business need or opportunity identified in the Initiation Phase. The requirements
that will be used to determine acceptance of the system are captured in the Test
and Evaluation MasterPlan.
Further define and refine the functional and data requirements and
document them in the Requirements Document,
Complete business process reengineering of the functions to be supported
(i.e., verify what information drives the business process, what information
is generated, who generates it, where does the information go, and who
processes it),
Develop detailed data and process models (system inputs, outputs, and the
process.
Develop the test and evaluation requirements that will be used to
determine acceptable system performance.
DESIGN PHASE
The design phase involves converting the informational, functional, and network
requirements identified during the initiation and planning phases into unified
design specifications that developers use to scriptprograms during the
development phase. Program designs are c onstructed in various ways. Using a
top-down approach, designers first identify and link majorprogram components
and interfaces, then expand design layouts as they identify and link smaller
subsystems and connections. Using a bottom-up approach, designers first
identify and link minor program components and interfaces, then expand design
layouts as they identify and link larger systems and connections. Contemporary
design techniques often use prototyping tools that build mock-up designs of
items such as application screens, database layouts, and system architectures.
End users, designers, developers, database managers, and network
administrators should review and refine the prototyped designs in an iterative
process until they agree on an acceptable design. Audit, security, and quality
assurance personnel should be involved in the review and approval process.
During this phase, the system is designed to satisfy the functional requirements
identified in the previous phase. Since problems in the design phase could be
very expensive to solve in the later stage of the software development, a variety
of elements are considered in the design to mitigate risk. These include:
Identifying potential risks and defining mitigating design features.
Performing a security risk assessment.
Developing a conversion plan to migrate current data to the new system.
Determining the operating environment.
Defining major subsystems and their inputs and outputs.
Allocating processes to resources.
Preparing detailed logic specifications for each software module. The
result is a draft System Design Document which captures the preliminary
design for the system.
Everything requiring user input or approval is documented and reviewed
by the user. Once these documents have been approved by the Agency
CIO and Business Sponsor, the final System Design Document is created
to serve as the Critical/Detailed Design for the system.
This document receives a rigorous review byAgency technical and
functional representatives to ensure that it satisfies the business
requirements. Concurrent with the development of the system design, the
Agency Project Manager begins development of the Implementation Plan,
Operations and Maintenance Manual, and the Training Plan.
DEVELOPMENT PHASE
The development phase involves converting design specifications into
executable programs. Effective development standards include requirements
that programmers and other project participants discuss design specifications
before programming begins. The procedures help ensure programmers clearly
understand program designs and functional requirements. Programmers use
various techniques to develop computer programs. The large transaction
oriented programs associated with financial institutions have traditionally
been developed using procedural programming techniques. Procedural
programming involves the line-by-line scripting of logical instructions that
are combined to form a program.Effective completion of the previous stages
is a key factor in the success of the Development phase. The Development
phase consists of:
This phase is initiated after the system has been tested and accepted by the
user. In this phase, the system is installed to support the intended business
functions. System performance is compared to performance objectives
established during the planning phase. Implementation includes user
notification, user training, installation of hardware, installation of software onto
production computers, and integration of the system into daily work processes.
This phase continues until the system is operating in production in accordance
with the defined userrequirements.
mydb=mysql.connector.connect(host="localhost",user="root",passwd="manag
er",database="quiz_comp")
mycursor=mydb.cursor()
print("QUIZ SOFTWARE")
print("1.questions")
print("2.participants")
print("3.scores update")
print("4.display")
if choice==1:
mycursor.execute(sql_in)
mydb.commit()
varchar(50),no_of_appearances_made int(10))")
if choice==2:
",'"+str(sql10)+"'"")"
print(sql_int)
mycursor.execute(sql_int)
mydb.commit()
#mycursor.execute("create table scores(reg_no int(5) primary key ,
if choice==3:
"'"")"
print(sql_insert)
mycursor.execute(sql_insert)
mydb.commit()
if choice==4:
data=mycursor.fetchall()
print(data)
OUTPUT SCREEN
HARDWARE AND SOFTWARE REQUIREMENTS
HARDWARE REQUIRMENTS:
I.OPERATING SYSTEM : WINDOWS 7 AND ABOVE
SOFTWARE REQUIREMENTS:
I. Windows OS
II. Python
CONCLUSION
This program on QUIZ SOFTWARE MANAGEMENT will
help to conduct QUIZ program in any place such as institution,
school, collage, etc in very convenient and easy way. It is menu
driven program which allow to adding, editing, displaying,
deleting, searching record of any question easily.
This project will display the result of a user who play this quiz
instantly i.e. after the quiz completion.
Thus, this project will be useful to conducting and monitor quiz
program in computer system.
This project has been very useful and knowledgeable to me.
BIBLIOGRAPHY
1. Computer science With Python - Class XI By : Sumita Arora
2. A Project Report On QUIZ SOFTWARE MANAGEMENT SYSTEM.
(QSMS)
By : CDT J GNANESH
3. Website: https://www.w3resource.com