0% found this document useful (0 votes)
36 views35 pages

TEST2

Sap asset management est

Uploaded by

97911
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views35 pages

TEST2

Sap asset management est

Uploaded by

97911
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 35

Skip to main content Skip to search

Login links

Secondary menu
Home » Content » Add a new rule » Add a new rule » Add a new rule » SAP Certified
Application Associate - SAP S/4HANA Asset Management - Full

SAP Certified Application Associate - SAP


S/4HANA Asset Management - Full
You got 61 of 64 possible points.
Your score was: 95 %

Question Results
Score 1 of 1

Question:

Which actions must the engineer perform to serialize a piece of


equipment?
There are 3 correct answers to this question.

Response:

Add a serial number to an existing equipment master.

Assign a serial number profile to the material master.

Add a serialized material into the construction type field of the


equipment master.

Add a serialized material to the equipment serial data view.

Assign a serial number profile to the equipment master.


Score 1 of 1

Question:

What must you maintain before you create the measuring points or
counters for your technical objects?
Please choose the correct answer.

Response:

Enter an annual estimate.

Create necessary characteristics in the classifications system.

Create a code group in the necessary catalog.

Assign characteristics to classes.

Score 1 of 1

Question:

When the planner adds a stock material in the order, which


activities are performed next in relation to the order?
There are 3 correct answers to this question.

Response:

Post the goods receipt.

Create the purchase order.

Post the goods issue.

Print the material provision list.


Perform the availability check.

Score 1 of 1

Question:

What are the effects when the planner releases a maintenance


order?
There are 3 correct answers to this question.

Response:

The planner CANNOT change planned costs.

The warehouse clerk can post a goods issue.

The technician can record confirmations.

The planner can print the job papers.

The planner can estimate costs.

Score 1 of 1

Question:

To which SAP objects can the planner assign a maintenance order to


make a budget available for this order?
There are 2 correct answers to this question.

Response:

WBS element with allocated budget

Functional location with allocated budget


Investment program item with allocated budget

Network header with allocated budget

Score 0 of 1

Question:

Which operations can the responsible person perform after a


maintenance order is technically completed?
There are 3 correct answers to this question.

Response:

Change the settlement rule.

Update the estimated costs.

Lock or unlock the order.

Change the planned costs.

Create invoice receipt for delivered materials

Score 1 of 1

Question:

What is the primary goal of SAP Predictive Maintenance and


Service?
Please choose the correct answer.

Response:

To provide advanced cost controlling analyses


To create a cloud-based equipment directory

To pre-calculate maintenance projects

To collect and analyze machine data

Score 1 of 1

Question:

Which of the following partner types is supported out of the box in


technical objects?
There are 2 correct answers to this question.

Response:

Contractor

Organizational unit

Maintenance plant

Controller

Score 1 of 1

Question:

Which of the following are characteristics of CDS views?


There are 3 correct answers to this question.

Response:

Provide immediate access to live data

Combine transactional and analytical data


Available for SAP HANA and any other database

Developed in ABAP layer

Modeled in SAP Business Warehouse

Score 1 of 1

Question:

What must you define for the mater all master before you can
refurbish the corresponding material?
Please choose the correct answer.

Response:

Serial number profile

Transport group 0001

Spit valuation of stocks

MRP type replenishment

Score 1 of 1

Question:

How can you define the data transfer within a technical object
hierarchy?
There are 2 correct answers to this question.

Response:
Use the Data Origin function to update the supported fields for bills of
material.

Use the Data Or gin function to change the supported fields in the
functional location

Use the Data Origin function to change the supported fields for pieces
of equipment.

Use the reference functional locations to transfer data to the


corresponding functional locations.

Score 1 of 1

Question:

Which process step belongs only to the SAP Fiori-based process


report malfunction?
Please choose the correct answer.

Response:

Create measurement reading

Pause work

Print

Put in process

Score 1 of 1

Question:

Which order type do you need when you refurbish defective parts?
Please choose the correct answer.
Response:

Order type with investment indicator

Order type for preventive maintenance

Order type for breakdown maintenance

Order type with refurbishment indicator

Score 1 of 1

Question:

You create a revision for a Maintenance Event Builder (MEB)


scenario. Which objects can you manually assign to a revision?
There are 2 correct answers to this question.

Response:

Manually created maintenance orders

Automatically created notifications from a Maintenance Plan

Automatically created maintenance orders from a Maintenance Plan

Manually created notifications

Score 1 of 1

Question:

Which UI technologies are supported in SAP S/4HANA Asset


Management when you use SAP Fiori Launchpad?
There are 3 correct answers to this question.
Response:

SAP GUI for Windows

Business Server Pages (BSP)

SAPU15

SAP GUI for HTML

Web Dynpro

Score 1 of 1

Question:

What is the function of the offset within a maintenance strategy?


Please choose the correct answer.

Response:

It extends the cycle length of a maintenance package.

It sets the start date of the maintenance plan.

It determines the first due date of a maintenance package

It shifts the next planned date due to the delay of the confirmation.

Score 1 of 1

Question:

Which object combination influences the display of fleet-specific tab


strips and fields?
Please choose the correct answer.
Response:

Equipment category and Fleet Object Type

Fleet Object Type and vehicle usage indicator

Equipment category and measuring point category

Fleet Object Type and measuring point category

Score 1 of 1

Question:

Which information does the usage list for equipment display?


Please choose the correct answer.

Response:

Material consumption

Operating hours

Validity periods

Failure frequency

Score 1 of 1

Question:

Which of the following is a scheduling indicator?


Please choose the correct answer.

Response:
Time - fixed date

Time - eariest date

Time - key date

Time - latest date

Score 1 of 1

Question:

The planner calls the document flow in the work order. Which of the
following document types are directly displayed?
There are 3 correct answers to this question.

Response:

Material document

Accounting document

Invoice

Controlling document

Time confirmation

Score 1 of 1

Question:

Which of the following are mandatory parameters for a counter used


for performance-based maintenance planning?
There are 2 correct answers to this question.
Response:

Code Group

Characteristic

Estimated Annual Performance

Counter Overflow Reading

Score 1 of 1

Question:

Why do you create maintenance planner groups?


Please choose the correct answer.

Response:

To map a group of persons responsible for maintenance strategies

To map a group of persons responsible for maintenance plans

To map a group of persons which plans maintenance budgets

To map a group of persons which plans maintenance activities of


technical objects.

Score 1 of 1

Question:

What are the prerequisites to run SAP Work Manager?


There are 3 correct answers to this question.

Response:
SAP Mobile Platform

Mobile Add-On for SAP S/4HANA

Sybase Unwired Platform

Device operating system (iOS, Android, or Windows)

SAP Geographical Enablement Framework

Score 1 of 1

Question:

Which activities can the planner perform by using the Maintenance


Planning Overview with the default filters?
There are 3 correct answers to this question.

Response:

Display approved purchase requisitions for non-stock materials for


which NO purchase order was generated.

Analyze released maintenance orders whose end date is in the past


and were NOT finally confirmed.

Analyze outstanding notifications that have NOT been assigned to a


maintenance order.

Display purchase orders for non-stock materials for which the goods
receipt was NOT posted.

Analyze confirmed maintenance orders which were NOT settled.


Score 1 of 1

Question:

What are the effects when the planner technically completes the
maintenance order?
There are 2 correct answers to this question.

Response:

The system closes open reservations.

The technician CANNOT create time confirmations.

The system deletes open purchase orders

The planner CANNOT add an order operation.

Score 1 of 1

Question:

How do you activate subscreens for equipment master data in


customizing?
Please choose the correct answer.

Response:

Define the field select on for the equipment master data.

Create a view profile and assign it to the equipment category.

Assign object information parameters to the equipment category.

Create a screen group info type and assign the group to the
equipment category.

Score 1 of 1

Question:

What is the purpose of the SAP GUI Beize theme?


Please choose the correct answer.

Response:

Create a similar user experience as in SAP Fiori Launchpad.

Make Web Dynpro apps available for SAP GUI.

Create a simplified copy of a transaction.

Make SAPUl5 apps available for SAP GUI.

Score 1 of 1

Question:

Which steps in the maintenance order are directly based on data


within the maintenance work center?
There are 2 correct answers to this question.

Response:

Cost calculation

Damage analysis

Capacity planning

Material availability check


Score 0 of 1

Question:

What is a characteristic of the SAP Fiori tile group?


Please choose the correct answer.

Response:

It shows active tiles in SAP Fiori Launchpad.

It is a building block of the SAP Fiori catalog.

It provides an invisible group of SAP Fiori catalogs.

It is assigned using the SET/GET parameters.

Score 1 of 1

Question:

The maintenance engineer creates a single cycle plan with a cycle of


12 months and enters the scheduling indicator Time - key date.

Which further scheduling parameter must you enter so that the


calculated call date is always scheduled six months before the
planned date?
Please choose the correct answer.

Response:

Enter an Offset of six months.

Enter a Scheduling Period of six months


Enter a Tolerance of 50%.

Enter a Call Horizon of 50%.

Score 1 of 1

Question:

Two Maintenance Packages of a Maintenance Strategy are due at


the same time. Which parameter determines that only one of these
maintenance packages is executed?

Please choose the correct answer.

Response:

Hierarchy

Lead Float

Package Sequence

Offset

Score 1 of 1

Question:

Where can the technician confirm the required time for the work on
a maintenance order?
There are 3 correct answers to this question.

Response:

In the maintenance order


In the technician's confirmation list

In the Manage Orders and Notifications in Information Center tile

In the collective time confirmation

In the Repair Malfunction tile

Score 1 of 1

Question:

What is the consequence when you activate alternative labelling?


Please choose the correct answer.

Response:

You can change the primary functional location label and keep the old
label as a historical label.

You CANNOT deactivate an alternative labelling.

The labelling system must be assigned to the functional location


category.

You can change a primary functional location label and delete the old
functional location label

Score 1 of 1

Question:

At which level does the system calculate costs of maintenance


orders?
Please choose the correct answer.
Response:

On header level or on operation level depending on the order type and


the maintenance planning plant

Always on operation level depending on the order type and the


maintenance planning plant

On header level or on operation level depending on the controlling


area

Always on header level depending on the maintenance plant

Score 1 of 1

Question:

Which of the following objects can you directly assign when you
define the work center master record?
There are 2 correct answers to this question.

Response:

Calculation Key

Organizational Unit

Business Partner

Capacity Category

Score 1 of 1

Question:
The planner adds a stock material in the order. When does the
system create reservations depending on the settings of the order
type?
There are 2 correct answers to this question.

Response:

When the order is saved

After the availability check is performed

When the order is released

When the costs are determined

Score 1 of 1

Question:

What does the structure indicator define?


There are 2 correct answers to this question.

Response:

The category of the functional location

The hierarchy levels of the function allocation structure

The allowed characters for a functional location

The field selection for the functional location list

Score 0 of 1

Question:
You plan to use the integration of maintenance orders and Project
System (PS) objects. To which PS objects can you assign a
maintenance order?
There are 2 correct answers to this question.

Response:

Network header

WBS element

Project definition

Network operation

Score 1 of 1

Question:

Where can you assign a main work center?


Please choose the correct answer.

Response:

Maintenance plan header

Task list header

Object list of a maintenance order

Task list operation

Score 1 of 1

Question:
Where do you add a warranty subscreen if you require warranty
data in the equipment master?
Please choose the correct answer.

Response:

View selection of equipment master

Warranty category

Master warranty

View profile for technical object

Score 1 of 1

Question:

To which of the following organizational units can you directly


assign a maintenance plant?
Please choose the correct answer.

Response:

Profit center

Standard purchasing organization

Controlling area

Personnel area

Score 1 of 1

Question:
What does the planner use to trigger the procurement of external
services from a maintenance order?
Please choose the correct answer.

Response:

Special activity type

Special order type

Special maintenance activity type

Special control key

Score 1 of 1

Question:

To which objects can you assign a safety plan?


There are 2 correct answers to this question.

Response:

Permit

Maintenance Order

Work Approval

Task List

Score 1 of 1

Question:
Which of the following is a characteristic of SAP S/4HANA?
Please choose the correct answer.

Response:

It is available on AnyDB and SAP HANA.

It is an update of SAP ERP.

It is a new product.

It is only available as cloud-based product.

Score 1 of 1

Question:

Which period does the planner define when using the scheduling
period in the maintenance plan?
Please choose the correct answer.

Response:

The period for which the system generates planned or call dates

The period in which a shift of planned dates is allowed

The period for which orders are created in advance

The period in which the system job for scheduling runs

Score 1 of 1

Question:
In which object can you change the Offset of a Maintenance Plan
Strategy?
Please choose the correct answer.

Response:

Maintenance Plan Category

Maintenance Plan Item

Maintenance Plan Header

Maintenance Package

Score 1 of 1

Question:

The planner must add an activity to a notification which must be


executed in the future. Which option in the notification that can be
predefined in a catalog, does the planner use?

Please choose the correct answer.

Response:

A task in the notification header

A text in the subject long text screen

A text in the notification item

An activity in the notification item

Score 1 of 1
Question:

The maintenance engineer creates a single cycle plan with the


following parameters:

The call object is maintenance order


The indicator for separate completion of maintenance call date is NOT set
The indicator for completion requirement is NOT activated Both shift factors
are set to 100%

Which date is relevant for the calculation of further planned dates


for call objects?

Response:

Completion date of the maintenance plan

Technical completion date of the maintenance order

Planned date of the next call number

Basic finish date of the maintenance order

Score 1 of 1

Question:

Which of the following process features are part of breakdown


maintenance?
There are 3 correct answers to this question.

Response:

Orders and notifications can be utilized in combination.

Maintenance orders always need planning of maintenance tasks.


Maintenance orders can be created as immediate orders without any
planning.

Orders created without notifications can be used within the


Maintenance Event Builder

Notifications are used for documentation of technical findings and


activities performed.

Score 1 of 1

Question:

You are planning maintenance execution on the employee level.


Which combination of SAP objects is mandatory within SAP
S/4HANA?
Please choose the correct answer.

Response:

Business Partner and Personnel Number

SAP User and Personnel Number

Planner Group and Personnel Number

Organizational Unit and Personnel Number

Score 1 of 1

Question:

When the planner checks the capacity load of a work center, which
data of the order is used?
There are 2 correct answers to this question.
Response:

Basic start

Amount of work

Scheduled start

Duration of the activity

Score 1 of 1

Question:

The technical completion of the actual maintenance order was


posted with a delay of 10 days. How can the planner shift the next
planned date by the same amount?

Please choose the correct answer.

Response:

Set the shift factor for late completion to 100%.

Set the shift factor for late completion to 10%.

Set the shift factor for early completion to 100%.

Set the shift factor for early completion to 10%.

Score 1 of 1

Question:
You have several defective parts that you need to send to a
subcontractor to get them refurbished. What must you do to trigger
the external refurbishment within the refurbishment order?

Please choose the correct answer.

Response:

Create an internal activity (control key PM01) and add the defective
material as non-stock component.

Create a manual purchase requisition and add the refurbishment order


number.

Create a manual purchase order and add the refurbishment order


number

Create an external activity (control key PM02) within the


refurbishment order.

Score 1 of 1

Question:

Which actions can you perform with the Create Technical Object SAP
Fiori app?
There are 3 correct answers to this question.

Response:

Edit classification data and characteristics

Create measuring point

Assign documents
Display asset viewer

Change a reference location

Score 1 of 1

Question:

Which parameters are calculated during scheduling of a


performance-based maintenance plan?
There are 2 correct answers to this question.

Response:

Monthly performance based on annual estimate

Daily performance based on annual estimate

Planned date based on sum of counter readings

Planned date based on cycle and daily performance

Score 1 of 1

Question:

To which objects can you assign a budget?


There are 2 correct answers to this question.

Response:

Function allocation

Maintenance order

Planning plant
WBS element

Score 1 of 1

Question:

Which features does SAP S/4HANA include?


There are 2 correct answers to this question.

Response:

SAPU15-based UI

In-memory platform

Unchanged data model

Support of any database

Score 1 of 1

Question:

You create a maintenance order with header-based costing. At


which level can the planner display the expected costs?
There are 2 correct answers to this question.

Response:

At the value category level

At the component level

At the cost element level


At the work center level

Score 1 of 1

Question:

Where can you assign activities?


There are 2 correct answers to this question.

Response:

Notification header

Order header

Notification item

Order operation

Score 1 of 1

Question:

Which valuation category do you use to refurbish the material?


Please choose the correct answer.

Response:

Origin

In house/External Procurement

Retail
Condition-based

Score 1 of 1

Question:

In which maintenance object can you use an activity type?


There are 2 correct answers to this question.

Response:

Task List Header

Maintenance Order Operation

Maintenance Order Header

Work Center

Score 1 of 1

Question:

A pump requires regular maintenance based on the throughput in


liters. How can the planner specify the call horizon in the
performance-based maintenance plan?

Please choose the correct answer.

Response:

As percentage of the cycle

In hours

In months
As a quantity of liters

Score 1 of 1

Question:

At which level can the planner estimate costs in a maintenance


order?
Please choose the correct answer.

Response:

At the value category level

At the work center level

At the cost center level

At the component level

Score 1 of 1

Question:

You need to create a structuring element within a BOM without the


view for physical inventory. Which material type do you use?
Please choose the correct answer.

Response:

Spare part (ERSA)

Operating supplies (HIBE)

Non-valuated material (UNBW)


Maintenance assembly (IBAU) O

mrimranmazhar
 My Premium Exams
 My account
o Create content
 Testimonial

Money Back Guarantee


Testimonial
FAQs
Privacy Policy
Terms and Conditions
About Us
Join Us
Contact Us
All trademarks, service marks, trade names, trade dress, product names and logos

appearing on the site are the property of their respective owners.


The site www.erpprep.com is in no way affiliated with SAP SE. Copyright © 2020
www.erpprep.com. All rights reserved.

You might also like