0% found this document useful (0 votes)
21 views39 pages

TEST7

Download as docx, pdf, or txt
Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1/ 39

Skip to main content Skip to search

Login links
 mrimranmazhar
 Logout

Secondary menu
Home » Content » Add a new rule » Add a new rule » Add a new rule » SAP Certified
Application Associate - SAP S/4HANA Asset Management - Full

SAP Certified Application Associate - SAP


S/4HANA Asset Management - Full
You got 0 of 68 possible points.
Your score was: 0 %

Question Results
Score 0 of 1
(skipped)

Question:

What is a characteristic of the SAP Fiori tile group?


Please choose the correct answer.

Response:

It provides an invisible group of SAP Fiori catalogs.

It is a building block of the SAP Fiori catalog.

It is assigned using the SET/GET parameters.

It shows active tiles in SAP Fiori Launchpad.


Score 0 of 1
(skipped)

Question:

You have several defective parts that you need to send to a


subcontractor to get them refurbished. What must you do to trigger
the external refurbishment within the refurbishment order?

Please choose the correct answer.

Response:

Create a manual purchase requisition and add the refurbishment order


number.

Create an internal activity (control key PM01) and add the defective
material as non-stock component.

Create an external activity (control key PM02) within the


refurbishment order.

Create a manual purchase order and add the refurbishment order


number

Score 0 of 1
(skipped)

Question:

You set up the process for Inspection Rounds, so that the technician
can enter measurement readings in a simplified way using the
overall t me confirmation.

What must you do before you set up a general maintenance task


list?
There are 2 correct answers to this question.
Response:

Assign a measuring point as a PRT to a Task List Operation.

Assign a measuring point as inspect on point to the Task List Header.

Create a piece of PRT equipment and allocate it using the PRT


overview button.

Assign a piece of equipment with allocated measuring point to a Task


List Operation

Score 0 of 1
(skipped)

Question:

Which actions must the engineer perform to serialize a piece of


equipment?
There are 3 correct answers to this question.

Response:

Add a serialized material into the construction type field of the


equipment master.

Add a serialized material to the equipment serial data view.

Assign a serial number profile to the equipment master.

Add a serial number to an existing equipment master.

Assign a serial number profile to the material master.


Score 0 of 1
(skipped)

Question:

Which of the following are valid scheduling parameters in the


multiple-counter plan?
There are 2 correct answers to this question.

Response:

OR-Link

Start Counter Reading

Scheduling Period

Call Horizon

Score 0 of 1
(skipped)

Question:

In which object can you change the Offset of a Maintenance Plan


Strategy?
Please choose the correct answer.

Response:

Maintenance Package

Maintenance Plan Item

Maintenance Plan Header


Maintenance Plan Category

Score 0 of 1
(skipped)

Question:

What are the effects when the planner technically completes the
maintenance order?
There are 2 correct answers to this question.

Response:

The system closes open reservations.

The planner CANNOT add an order operation.

The technician CANNOT create time confirmations.

The system deletes open purchase orders

Score 0 of 1
(skipped)

Question:

Which options do you have to allow the assignment of order


operations to object list entries?
There are 3 correct answers to this question.

Response:

To all object list entries

To all task lists


To all maintenance plans

To all notifications

Only to notifications created via maintenance plans

Score 0 of 1
(skipped)

Question:

Which of the following process features are part of breakdown


maintenance?
There are 3 correct answers to this question.

Response:

Maintenance orders always need planning of maintenance tasks.

Notifications are used for documentation of technical findings and


activities performed.

Orders and notifications can be utilized in combination.

Maintenance orders can be created as immediate orders without any


planning.

Orders created without notifications can be used within the


Maintenance Event Builder

Score 0 of 1
(skipped)

Question:
Which of the following objects can you directly assign when you
define the work center master record?
There are 2 correct answers to this question.

Response:

Business Partner

Capacity Category

Calculation Key

Organizational Unit

Score 0 of 1
(skipped)

Question:

Which of the following are mandatory parameters for a counter used


for performance-based maintenance planning?
There are 2 correct answers to this question.

Response:

Characteristic

Counter Overflow Reading

Code Group

Estimated Annual Performance

Score 0 of 1
(skipped)
Question:

Which valuation category do you use to refurbish the material?


Please choose the correct answer.

Response:

Condition-based

In house/External Procurement

Retail

Origin

Score 0 of 1
(skipped)

Question:

What is the function of the offset within a maintenance strategy?


Please choose the correct answer.

Response:

It shifts the next planned date due to the delay of the confirmation.

It sets the start date of the maintenance plan.

It extends the cycle length of a maintenance package.

It determines the first due date of a maintenance package

Score 0 of 1
(skipped)
Question:

A pump requires regular maintenance based on the throughput in


liters. How can the planner specify the call horizon in the
performance-based maintenance plan?

Please choose the correct answer.

Response:

As a quantity of liters

In hours

In months

As percentage of the cycle

Score 0 of 1
(skipped)

Question:

What does the structure indicator define?


There are 2 correct answers to this question.

Response:

The category of the functional location

The field selection for the functional location list

The hierarchy levels of the function allocation structure

The allowed characters for a functional location


Score 0 of 1
(skipped)

Question:

What must you do before the system can generate entries in the
action log of an equipment?
Please choose the correct answer.

Response:

Define an additional business view for equipment category.

Assign a user status profile to the equipment category.

Maintain the setting for the usage history update.

Set the corresponding flag when you maintain the equipment category

Score 0 of 1
(skipped)

Question:

What is the primary goal of SAP Predictive Maintenance and


Service?
Please choose the correct answer.

Response:

To pre-calculate maintenance projects

To provide advanced cost controlling analyses

To create a cloud-based equipment directory


To collect and analyze machine data

Score 0 of 1
(skipped)

Question:

Which UI technologies are supported in SAP S/4HANA Asset


Management when you use SAP Fiori Launchpad?
There are 3 correct answers to this question.

Response:

Business Server Pages (BSP)

Web Dynpro

SAPU15

SAP GUI for Windows

SAP GUI for HTML

Score 0 of 1
(skipped)

Question:

The planner must add an activity to a notification which must be


executed in the future. Which option in the notification that can be
predefined in a catalog, does the planner use?

Please choose the correct answer.

Response:

A text in the notification item


An activity in the notification item

A text in the subject long text screen

A task in the notification header

Score 0 of 1
(skipped)

Question:

What is the purpose of the SAP GUI Beize theme?


Please choose the correct answer.

Response:

Make SAPUl5 apps available for SAP GUI.

Create a simplified copy of a transaction.

Make Web Dynpro apps available for SAP GUI.

Create a similar user experience as in SAP Fiori Launchpad.

Score 0 of 1
(skipped)

Question:

Which steps in the maintenance order are directly based on data


within the maintenance work center?
There are 2 correct answers to this question.

Response:
Cost calculation

Material availability check

Damage analysis

Capacity planning

Score 0 of 1
(skipped)

Question:

What can a planner monitor with the Resource Scheduling for


Maintenance Planners SAP Fiori app?
There are 2 correct answers to this question.

Response:

Workload of work centers

Non-available stock materials

Maintenance orders NOT confirmed

Notifications without maintenance orders

Score 0 of 1
(skipped)

Question:

Which of the following is a scheduling indicator?


Please choose the correct answer.

Response:
Time - fixed date

Time - latest date

Time - eariest date

Time - key date

Score 0 of 1
(skipped)

Question:

You need to create a structuring element within a BOM without the


view for physical inventory. Which material type do you use?
Please choose the correct answer.

Response:

Spare part (ERSA)

Non-valuated material (UNBW)

Maintenance assembly (IBAU) O

Operating supplies (HIBE)

Score 0 of 1
(skipped)

Question:

What must you define for the mater all master before you can
refurbish the corresponding material?
Please choose the correct answer.
Response:

MRP type replenishment

Serial number profile

Transport group 0001

Spit valuation of stocks

Score 0 of 1
(skipped)

Question:

The maintenance engineer creates a single cycle plan with a cycle of


12 months and enters the scheduling indicator Time - key date.

Which further scheduling parameter must you enter so that the


calculated call date is always scheduled six months before the
planned date?
Please choose the correct answer.

Response:

Enter a Call Horizon of 50%.

Enter a Tolerance of 50%.

Enter an Offset of six months.

Enter a Scheduling Period of six months

Score 0 of 1
(skipped)
Question:

Which of the following parameters are available when you define a


new Maintenance Plan Category?
There are 3 correct answers to this question.

Response:

Change Documents

Maintenance Activity Type

Call Object

Order Type

Completion Date

Score 0 of 1
(skipped)

Question:

Which of the following is a characteristic of SAP S/4HANA?


Please choose the correct answer.

Response:

It is a new product.

It is only available as cloud-based product.

It is an update of SAP ERP.

It is available on AnyDB and SAP HANA.


Score 0 of 1
(skipped)

Question:

Which features does SAP S/4HANA include?


There are 2 correct answers to this question.

Response:

Unchanged data model

SAPU15-based UI

In-memory platform

Support of any database

Score 0 of 1
(skipped)

Question:

Which parameters are calculated during scheduling of a


performance-based maintenance plan?
There are 2 correct answers to this question.

Response:

Monthly performance based on annual estimate

Daily performance based on annual estimate

Planned date based on sum of counter readings


Planned date based on cycle and daily performance

Score 0 of 1
(skipped)

Question:

To which of the following organizational units can you directly


assign a maintenance plant?
Please choose the correct answer.

Response:

Standard purchasing organization

Controlling area

Personnel area

Profit center

Score 0 of 1
(skipped)

Question:

What is the consequence when you activate alternative labelling?


Please choose the correct answer.

Response:

You can change the primary functional location label and keep the old
label as a historical label.
The labelling system must be assigned to the functional location
category.

You CANNOT deactivate an alternative labelling.

You can change a primary functional location label and delete the old
functional location label

Score 0 of 1
(skipped)

Question:

You are planning maintenance execution on the employee level.


Which combination of SAP objects is mandatory within SAP
S/4HANA?
Please choose the correct answer.

Response:

SAP User and Personnel Number

Planner Group and Personnel Number

Organizational Unit and Personnel Number

Business Partner and Personnel Number

Score 0 of 1
(skipped)

Question:

You create a maintenance order with header-based costing. At


which level can the planner display the expected costs?
There are 2 correct answers to this question.
Response:

At the work center level

At the cost element level

At the value category level

At the component level

Score 0 of 1
(skipped)

Question:

Which operations can the responsible person perform after a


maintenance order is technically completed?
There are 3 correct answers to this question.

Response:

Change the settlement rule.

Lock or unlock the order.

Change the planned costs.

Update the estimated costs.

Create invoice receipt for delivered materials

Score 0 of 1
(skipped)

Question:
When the planner checks the capacity load of a work center, which
data of the order is used?
There are 2 correct answers to this question.

Response:

Amount of work

Scheduled start

Duration of the activity

Basic start

Score 0 of 1
(skipped)

Question:

Why do you create maintenance planner groups?


Please choose the correct answer.

Response:

To map a group of persons which plans maintenance budgets

To map a group of persons responsible for maintenance plans

To map a group of persons which plans maintenance activities of


technical objects.

To map a group of persons responsible for maintenance strategies

Score 0 of 1
(skipped)
Question:

What must you define before you can create a new functional
location?
There are 2 correct answers to this question.

Response:

Reference functional location

Structure indicator

Status profile

Functional location category

Score 0 of 1
(skipped)

Question:

When the planner adds a stock material in the order, which


activities are performed next in relation to the order?
There are 3 correct answers to this question.

Response:

Perform the availability check.

Print the material provision list.

Post the goods receipt.

Post the goods issue.


Create the purchase order.

Score 0 of 1
(skipped)

Question:

What is a feature of the Technical Object Breakdowns SAP Fiori app?


Please choose the correct answer.

Response:

The underlying lnfoCube

The presentation in an SAP BW Query

The underlying CDS View

The visualization in SAP Lumira

Score 0 of 1
(skipped)

Question:

Which object combination influences the display of fleet-specific tab


strips and fields?
Please choose the correct answer.

Response:

Equipment category and measuring point category

Equipment category and Fleet Object Type

Fleet Object Type and vehicle usage indicator


Fleet Object Type and measuring point category

Score 0 of 1
(skipped)

Question:

What is a prerequisite to start a performance-based maintenance


plan?
Please choose the correct answer.

Response:

Call Horizon

Initial Measurement Document

Cycle Modification Factor

Scheduling Period

Score 0 of 1
(skipped)

Question:

In which maintenance object can you use an activity type?


There are 2 correct answers to this question.

Response:

Maintenance Order Header

Maintenance Order Operation


Task List Header

Work Center

Score 0 of 1
(skipped)

Question:

Which object is mandatory within a refurbishment order?


Please choose the correct answer.

Response:

Equipment

Material

Serial number

Functional location

Score 0 of 1
(skipped)

Question:

What are the prerequisites to run SAP Work Manager?


There are 3 correct answers to this question.

Response:

Mobile Add-On for SAP S/4HANA


SAP Geographical Enablement Framework

SAP Mobile Platform

Device operating system (iOS, Android, or Windows)

Sybase Unwired Platform

Score 0 of 1
(skipped)

Question:

At which level can the planner estimate costs in a maintenance


order?
Please choose the correct answer.

Response:

At the component level

At the value category level

At the work center level

At the cost center level

Score 0 of 1
(skipped)

Question:

Which materials are displayed when the planner checks the


availability list?
Please choose the correct answer.
Response:

Stock and non-stock materials

Only the stock materials

Only the non-available stock materials

Stock materials and Production Resources Tools materials

Score 0 of 1
(skipped)

Question:

What must you assign for a cross-plant planning scenario?


Please choose the correct answer.

Response:

The same planner group to multiple planning plants

The same planning plant to multiple maintenance plants

Multiple planning plants to a maintenance plant

The same planner group to multiple maintenance plants

Score 0 of 1
(skipped)

Question:

Which activities can the planner perform by using the Maintenance


Planning Overview with the default filters?
There are 3 correct answers to this question.
Response:

Display approved purchase requisitions for non-stock materials for


which NO purchase order was generated.

Analyze released maintenance orders whose end date is in the past


and were NOT finally confirmed.

Display purchase orders for non-stock materials for which the goods
receipt was NOT posted.

Analyze confirmed maintenance orders which were NOT settled.

Analyze outstanding notifications that have NOT been assigned to a


maintenance order.

Score 0 of 1
(skipped)

Question:

Where can you assign a main work center?


Please choose the correct answer.

Response:

Object list of a maintenance order

Maintenance plan header

Task list header

Task list operation


Score 0 of 1
(skipped)

Question:

Which process step belongs only to the SAP Fiori-based process


report malfunction?
Please choose the correct answer.

Response:

Print

Create measurement reading

Pause work

Put in process

Score 0 of 1
(skipped)

Question:

The maintenance engineer creates a single cycle plan with the


following parameters:

The call object is maintenance order


The indicator for separate completion of maintenance call date is NOT set
The indicator for completion requirement is NOT activated Both shift factors
are set to 100%

Which date is relevant for the calculation of further planned dates


for call objects?

Response:

Completion date of the maintenance plan


Technical completion date of the maintenance order

Planned date of the next call number

Basic finish date of the maintenance order

Score 0 of 1
(skipped)

Question:

You use SAP Work Manager. Which operations can the Maintenance
Worker execute?
There are 2 correct answers to this question.

Response:

Schedule resources
Change task list

Create notification
Create a measurement reading

Change BOM
Create a work order on the ESRI map

Create equipment
Install equipment

Score 0 of 1
(skipped)

Question:
How can you define the data transfer within a technical object
hierarchy?
There are 2 correct answers to this question.

Response:

Use the Data Origin function to change the supported fields for pieces
of equipment.

Use the Data Origin function to update the supported fields for bills of
material.

Use the reference functional locations to transfer data to the


corresponding functional locations.

Use the Data Or gin function to change the supported fields in the
functional location

Score 0 of 1
(skipped)

Question:

The technical completion of the actual maintenance order was


posted with a delay of 10 days. How can the planner shift the next
planned date by the same amount?

Please choose the correct answer.

Response:

Set the shift factor for late completion to 10%.

Set the shift factor for early completion to 100%.

Set the shift factor for late completion to 100%.


Set the shift factor for early completion to 10%.

Score 0 of 1
(skipped)

Question:

Which information does the usage list for equipment display?


Please choose the correct answer.

Response:

Failure frequency

Validity periods

Material consumption

Operating hours

Score 0 of 1
(skipped)
Question:

Which actions can you perform with the Create Technical Object SAP
Fiori app?
There are 3 correct answers to this question.

Response:

Edit classification data and characteristics

Create measuring point


Assign documents

Display asset viewer

Change a reference location

Score 0 of 1
(skipped)

Question:

To which objects can you assign a safety plan?


There are 2 correct answers to this question.

Response:

Task List

Maintenance Order

Work Approval

Permit

Score 0 of 1
(skipped)

Question:

Which order type do you need when you refurbish defective parts?
Please choose the correct answer.

Response:
Order type with refurbishment indicator

Order type for preventive maintenance

Order type for breakdown maintenance

Order type with investment indicator

Score 0 of 1
(skipped)

Question:

Which activities can a planner perform with the Manage Malfunction


Report SAPUl5 app?
There are 3 correct answers to this question.

Response:

Print shop papers

Enter effort

Enter measurement reading

Enter material

Assign work to technician

Score 0 of 1
(skipped)

Question:
What does the planner use to trigger the procurement of external
services from a maintenance order?
Please choose the correct answer.

Response:

Special order type

Special activity type

Special maintenance activity type

Special control key

Score 0 of 1
(skipped)

Question:

At which level does the system calculate costs of maintenance


orders?
Please choose the correct answer.

Response:

Always on header level depending on the maintenance plant

On header level or on operation level depending on the controlling


area

On header level or on operation level depending on the order type and


the maintenance planning plant

Always on operation level depending on the order type and the


maintenance planning plant

Score 0 of 1
(skipped)

Question:

Where can the planner check the mater al availability?


There are 3 correct answers to this question.

Response:

Within the SAP Fior-based background job

Within an individual order

From the reservation list

From the list of orders

Within the SAP Fiori-based Material Documents Overview

Score 0 of 1
(skipped)
Question:

When does the system create the entries in the web apply job list
for the technician?
Please choose the correct answer.

Response:

When the planner performs capacity planning.

When the planner creates the maintenance order.


When the planner prints the job card.

When the planner releases the maintenance order.

Score 0 of 1
(skipped)

Question:

You plan to use the integration of maintenance orders and Project


System (PS) objects. To which PS objects can you assign a
maintenance order?
There are 2 correct answers to this question.

Response:

Network operation

Network header

WBS element

Project definition

Score 0 of 1
(skipped)

Question:

You create a revision for a Maintenance Event Builder (MEB)


scenario. Which objects can you manually assign to a revision?
There are 2 correct answers to this question.

Response:
Manually created notifications

Automatically created maintenance orders from a Maintenance Plan

Manually created maintenance orders

Automatically created notifications from a Maintenance Plan

Score 0 of 1
(skipped)

Question:

How do you activate subscreens for equipment master data in


customizing?
Please choose the correct answer.

Response:

Assign object information parameters to the equipment category.

Create a view profile and assign it to the equipment category.

Create a screen group info type and assign the group to the
equipment category.

Define the field select on for the equipment master data.

Score 0 of 1
(skipped)

Question:

To which SAP objects can the planner assign a maintenance order to


make a budget available for this order?
There are 2 correct answers to this question.
Response:

Investment program item with allocated budget

WBS element with allocated budget

Network header with allocated budget

Functional location with allocated budget

mrimranmazhar
 My Premium Exams
 My account
o Create content
 Testimonial

Money Back Guarantee


Testimonial
FAQs
Privacy Policy
Terms and Conditions
About Us
Join Us
Contact Us
All trademarks, service marks, trade names, trade dress, product names and logos

appearing on the site are the property of their respective owners.


The site www.erpprep.com is in no way affiliated with SAP SE. Copyright © 2020
www.erpprep.com. All rights reserved.

You might also like