TEST7
TEST7
TEST7
Login links
mrimranmazhar
Logout
Secondary menu
Home » Content » Add a new rule » Add a new rule » Add a new rule » SAP Certified
Application Associate - SAP S/4HANA Asset Management - Full
Question Results
Score 0 of 1
(skipped)
Question:
Response:
Question:
Response:
Create an internal activity (control key PM01) and add the defective
material as non-stock component.
Score 0 of 1
(skipped)
Question:
You set up the process for Inspection Rounds, so that the technician
can enter measurement readings in a simplified way using the
overall t me confirmation.
Score 0 of 1
(skipped)
Question:
Response:
Question:
Response:
OR-Link
Scheduling Period
Call Horizon
Score 0 of 1
(skipped)
Question:
Response:
Maintenance Package
Score 0 of 1
(skipped)
Question:
What are the effects when the planner technically completes the
maintenance order?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Response:
To all notifications
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Which of the following objects can you directly assign when you
define the work center master record?
There are 2 correct answers to this question.
Response:
Business Partner
Capacity Category
Calculation Key
Organizational Unit
Score 0 of 1
(skipped)
Question:
Response:
Characteristic
Code Group
Score 0 of 1
(skipped)
Question:
Response:
Condition-based
In house/External Procurement
Retail
Origin
Score 0 of 1
(skipped)
Question:
Response:
It shifts the next planned date due to the delay of the confirmation.
Score 0 of 1
(skipped)
Question:
Response:
As a quantity of liters
In hours
In months
Score 0 of 1
(skipped)
Question:
Response:
Question:
What must you do before the system can generate entries in the
action log of an equipment?
Please choose the correct answer.
Response:
Set the corresponding flag when you maintain the equipment category
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Web Dynpro
SAPU15
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Cost calculation
Damage analysis
Capacity planning
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Time - fixed date
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
What must you define for the mater all master before you can
refurbish the corresponding material?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Change Documents
Call Object
Order Type
Completion Date
Score 0 of 1
(skipped)
Question:
Response:
It is a new product.
Question:
Response:
SAPU15-based UI
In-memory platform
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Controlling area
Personnel area
Profit center
Score 0 of 1
(skipped)
Question:
Response:
You can change the primary functional location label and keep the old
label as a historical label.
The labelling system must be assigned to the functional location
category.
You can change a primary functional location label and delete the old
functional location label
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
When the planner checks the capacity load of a work center, which
data of the order is used?
There are 2 correct answers to this question.
Response:
Amount of work
Scheduled start
Basic start
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
What must you define before you can create a new functional
location?
There are 2 correct answers to this question.
Response:
Structure indicator
Status profile
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Call Horizon
Scheduling Period
Score 0 of 1
(skipped)
Question:
Response:
Work Center
Score 0 of 1
(skipped)
Question:
Response:
Equipment
Material
Serial number
Functional location
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Display purchase orders for non-stock materials for which the goods
receipt was NOT posted.
Score 0 of 1
(skipped)
Question:
Response:
Question:
Response:
Pause work
Put in process
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
You use SAP Work Manager. Which operations can the Maintenance
Worker execute?
There are 2 correct answers to this question.
Response:
Schedule resources
Change task list
Create notification
Create a measurement reading
Change BOM
Create a work order on the ESRI map
Create equipment
Install equipment
Score 0 of 1
(skipped)
Question:
How can you define the data transfer within a technical object
hierarchy?
There are 2 correct answers to this question.
Response:
Use the Data Origin function to change the supported fields for pieces
of equipment.
Use the Data Origin function to update the supported fields for bills of
material.
Use the Data Or gin function to change the supported fields in the
functional location
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Failure frequency
Validity periods
Material consumption
Operating hours
Score 0 of 1
(skipped)
Question:
Which actions can you perform with the Create Technical Object SAP
Fiori app?
There are 3 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Task List
Maintenance Order
Work Approval
Permit
Score 0 of 1
(skipped)
Question:
Which order type do you need when you refurbish defective parts?
Please choose the correct answer.
Response:
Order type with refurbishment indicator
Score 0 of 1
(skipped)
Question:
Response:
Enter effort
Enter material
Score 0 of 1
(skipped)
Question:
What does the planner use to trigger the procurement of external
services from a maintenance order?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
When does the system create the entries in the web apply job list
for the technician?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Network operation
Network header
WBS element
Project definition
Score 0 of 1
(skipped)
Question:
Response:
Manually created notifications
Score 0 of 1
(skipped)
Question:
Response:
Create a screen group info type and assign the group to the
equipment category.
Score 0 of 1
(skipped)
Question:
mrimranmazhar
My Premium Exams
My account
o Create content
Testimonial