To get the SRI for the roof, get the area of the GI roof, the color
and look for the table recommended SRI.
Then you get the concrete deck area, the color and then look for
the table recommended SRI.
If you material do not appear in the pull down menu, add the
material and input the U value form material catalogue and the
thickness of the material and the software will do the rest for you.
9/3/2024 46 46
v. 2.1b Published April 2020
SUPPORTING DOCUMENTS FOR INDIVIDUAL
MEASURE (EXCEL CALCULATION)
9/3/2024 47 47
v. 2.1b Published April 2020
UPLOAD SUPPORTING DOCUMENT (PHOTOS)
documents.
WC-1
DUAL FLUSH
AUDITORS/REVIEWER
You need to comment on each measure that was selected by the
design team. Either you approve or reject the measure. If you reject
the measure indicate why it was rejected. In the “DESIGN” tab, you
also have to indicate if you reject or approve the project. You cannot
approve the project for certification if you have rejected any
measures in the energy, water or materials tab.
DESIGN TEAM
You need to check each if each or the measure that you claim are
either approved or rejected. Approved measures can no longer be
changed.
v. 2.1b Published April 2020 75
DOCUMENTS FOR FINAL
CERTIFICATION
Design team
WC-1
DUAL FLUSH
EDGE
Design team Auditor
EDGE EDGE
EDGE Certifier
client/EDGE CERTIFIER
Expert
Construction team
AUDITOR’S ROLE
You have to make sure that the document submitted for audit will
be installed on site. If they claim that wall is 125mm thick, you need to EDGE
Auditor
check on the contract documents the section showing the wall thickness.
You have to confirm also that all the walls is 125mm thick, if there are Plans,
Specs
variation, you have to get the average thickness. and/or
Calcs
EXPERT’S ROLE
You have to make sure that the document that you will submit
will support the claim that you have chosen. A drawing that is not taken Design team
from the contract document is not acceptable (just drawing a section for
wall is not acceptable). It should come from the contract document.