Algorithms
Algorithms
For brief description of algorithm below, it is mentioned that EG is a group of elements or objects of
BPMN, E is a set of elements, A is a set of activities, AS is a regular start event, AE is a regular end event,
F is the flow relation, GT+ is a set of parallel gateways and GT× is a set of exclusive gateways.
Petri nets:
Place
Transition
Sequence Arc
of transitions (PL∩TR =∅), Control flow relation FA ⊆ (PL ×TR) ∪ (TR×PL) is the set of arcs
and Mr =Mapping rules.
Step 3: Use Mr for mapping of figures to transform events, activities and gateways into petri nets
Step 5: End
Step6: Identify gateways GT+ or GT× before or after their existence in a graph
Step7: Add identifiers before or after the gateway to predict or foreseen a particular gateway
Step8: Arrange every source and target object in a sequence of BPMN
Step9: End
SA A B C CE D E F G H DH
HE