User Manual For GFC Question Fields

Download as pdf or txt
Download as pdf or txt
You are on page 1of 55

User Manual for Self-Assessment

2024
Table of Contents
1. Garbage Free City 3
2.Protocols 3
3. GFC Start Rating Process Flow for ULBs 3
4. Self-Assessment Scorecard of Garbage Free Cities 2024 4
5. Procedure to Apply for GFC 5
6. Important & Aspirational Indicators in GFC Self-Assessment 7
7. Important Indicators 8
C1 -- Door to Door Collection 8
C2 -- Source Segregation 13
C4 -- Processing by Bulk Waste Generators 15
C5 -- Waste Processing& Capacity- Wet Waste 23
C6 -- Waste Processing & Capacity- Dry Waste 25
C7 -- Dumpsite Remediation 29
C15 -- Geo-mapping of waste processing facilities, C&D facilities, landfills,
dumpsites, STPs/ FSTPs 32
8. Aspirational Indicators 42
C16 --Geo-mapping of the wards i.e. ward boundaries, drains, nallahs, water
Bodies 42
C18 -- Sale of waste by-products 45
C20 -- Processing of Sanitary and Domestic Hazardous waste 50

*******

2
Garbage Free City
The Ministry of Housing and Urban Affairs (MOHUA) launched the Protocol for Star Rating of Garbage
Free cities in order to institutionalize a mechanism for cities to achieve Garbage Free status and to
motivate cities to achieve higher degrees of cleanliness.

The protocol follows a graded approach through which cities are evaluated and given a graded score for
each component as per the progress achieved by the cities. The protocol is, based on 18 components.

Further, these components have been divided into Important and Aspirational indicators and allocated
respective marks. A city may score anywhere between level 1 (minimum) to level 4 as per its performance.
Thus, a city can be declared as “Garbage Free City” and achieve Star Rating certification if it complies
with the conditions as prescribed under this protocol.

Protocols
1. 10 Components with Important (7) & Aspirational (3) categories and respective weightages assigned.

2. 4 Star Ratings.

3. Certifications for all 4-star ratings to be conducted by the third party appointed by MoHUA.

4. In case a city fails for the applied star, it will be validated and certified for a lower star.

5. Graded Scoring: A city may score anywhere between level 1 (minimum) to level 4 as per its
performance. Additionally, for ward level parameters, every ward will be evaluated for each
component followed by an average score of all wards will be considered as the final score of that
component. In case a city does not score at least level 1 in any of the important components, it will
not be considered eligible for the star rating.

GFC Star Rating Process Flow for ULBs

3
Self-Assessment Scorecard of Garbage Free Cities 2024

4
Procedure to Apply for GFC
1. Open Swachhatam Portal URL: https://admin.sbmurban.org/u/login

2. Provide the city login and password to login into Swachhatam portal.

3. After successful login, go to Assessments→ Garbage Free Cities (GFC)→

a. GFC Toolkit (ULBs can download the toolkit from here)

5
b. Certification & Application (ULBs can check their Eligibility & apply for New Certificate)

Apply for New Certificate

c. ULBs can select their Star Rating (for which they are eligible) and click on “Apply for GFC”.

6
Important & Aspirational Indicators in GFC Self-Assessment
➢ Important Indicators (1 to 3 Star)
▪ C1: Door to Door Collection (Ward level)
▪ C2: Source Segregation (Ward level)
▪ C4: Processing by Bulk Waste Generators
▪ C5: Waste Processing & Capacity- Wet Waste
▪ C6: Waste Processing & Capacity- Dry Waste
▪ C7: Dumpsite Remediation
▪ C15: Geo-mapping of waste processing facilities, C&D facilities, landfills, dumpsites, STPs/ FSTPs

➢ Aspirational Indicators (5 to 7 Star)


▪ C16: Geo-mapping of the wards i.e., ward boundaries, drains, nallahs, water bodies
▪ C18: Sale of waste by-products
▪ C20: Processing of Sanitary and Domestic Hazardous waste

7
Important Indicators

C1: Door to Door Collection (Ward level)


Questions under C1
A: Whether there is an ICT based monitoring of door-to-door garbage collection operations?
B: Total number HH/ premises/ gates
C: Number of HH/ premises/ gates practicing Door to Door Collection

C1-A: Whether there is an ICT based monitoring of door-to-door garbage collection operations?

Navigation: City profile→ward Details>>SWM>>Q2

Procedure: Yes, should be expected.

8
C1-B: Total number HH/ premises/ gates
Navigation -- City Profile>>City Non-BWGs>> Area Buildings>> Building Type
Procedure -- Count of all buildings type form entries

Area Buildings: In Building type (Commercial/Public)

9
In Building type (Industrial)

In Building type (Mix (Residential + Commercial)

In Building type (Residential)

10
Other Important Places In type (Slums)

In any other type (except slums) will be counted as a single entry.

Form type: Educational Institutes, Hotels & Restaurants, Offices, Park & Gardens, Tourist Areas, and
Transport Hubs.

11
C1-C: Number of HH/ premises/ gates practicing Door to Door Collection

Navigation -- City Profile>>City Non BWGs >> Area Details >> Waste collection and segregation
>> Sr. no. 1 + City Non-BWG>> Other Important Places >> Type

Procedure Area Details

Other Important Places

12
C2: Source Segregation at Ward Level
Questions under C2

A: Number of HH/ premises/ gates practicing Source Segregation (into Dry & Wet)
B: Number of HH/ premises/ gates practicing Source Segregation (into Dry, Wet & sanitary)
C: Number of HH/ premises/ gates practicing Source Segregation (into Dry, Wet, Sanitary & Domestic
Hazardous)

C2-A: Number of HH/ premises/ gates practicing Source Segregation (into Dry & Wet)

Navigation: City Profile>>City Non BWGs >> Area Details >> Waste collection and segregation >> Sr.
no. 2 + City Non-BWG>> Other Important Places >> Type

Procedure Area Details

C2-B: Number of HH/ premises/ gates practicing Source Segregation (into Dry, Wet & sanitary)
Navigation -- City Non BWGs >> Area Details >> Waste collection and segregation >> Sr. no. 2 +
City Non-BWG>> Other Important Places >> Type
Procedure

13
C2-C: Number of HH/ premises/ gates practicing Source Segregation (into Dry, Wet, Sanitary & Domestic
Hazardous)

Navigation: City Non BWGs >> Area Details >> Waste collection and segregation >> Sr. no. 2 +
City Non-BWG>> Other Important Places >> Type
Procedure

14
C4: Processing by Bulk Waste Generators
Questions under C4
A: Identification survey of BWG conducted in last 12 months (from the date of application)
B: Has the ULB issued a notification to BWGs for compliance of on-site wet waste
processing?
C: Has any guideline been issued to ensure reduction of waste by BWGs such as at
community hall/function hall/marriage hall/public gathering etc.?
D: Total number of BWGs identified within the ward (including commercial+Non-RAWs +RWA+
institutional+ community hall function hall marriage hall public gathering etc.)
E: Total number of commercial BWGs within the ward
F: Total number of Residential (Non-RWAs) BWGs within the ward
G: Total number of RWA BWGs within the ward
H: Total number of institutional BWGs within the ward
I: Number of BWGs issued with the notification (Wet waste)
J: Number of commercial BWGs practicing on-site wet waste processing
K: Number of Residential (Non-RWAs) BWGs practicing on-site wet waste processing
L: Number of RWA BWGs practicing on-site wet waste processing
M: Number of institutional BWGs practicing on-site wet waste processing
N: What standard norm (KG per day) has been notified by ULB for BWGs to practice on-site wet waste
processing?
O: How many BWGs (of all identified) hand-over their wet-waste to ULB?

C4-A: Identification survey of BWG conducted in last 12 months (from the date of application)
Navigation -- city profile>>city level details>>city level declarations>>Q2

Procedure

15
C4-B: Has the ULB issued a notification to BWGs for compliance of on-site wet waste processing?
Navigation -- city profile>>notification management
Procedure

C4-C: Has any guideline been issued to ensure reduction of waste by BWGs such as at community
hall/function hall/marriage hall/public gathering etc.
Navigation -- city profile>>ward details>>swm>>Q14
Procedure

16
C4-D: Total number of BWGs identified within the ward (including commercial+Non- RAWs +RWA
+institutional+community hall function hall marriage hall public gathering etc.)

Navigation --city profile>>city bulk waste generators>>bulk waste generators


Procedure

C4-E: Total number of commercial BWGs within the ward


Navigation -- City Profile>>City BWG>>BWG>> type (Malls/Cinema Buildings,
Markets/Mandi, Offices)
Procedure

17
C4-F: Total number of Residential (Non-RWAs) BWGs within the ward
Navigation -- City Profile>>City BWG>>BWG>>type (Hotels & Restaurants, offices,
Educational Institutes)
Procedure

C4-G: Total number of RWA BWGs within the ward


Navigation -- City Profile>>City BWG>>BWG>>RWA’s
Procedure

18
C4-H: Total number of institutional BWGs within the ward
Navigation -- City Profile>>City BWG>>BWG>>educational institutes (Total count)
Procedure

C4-I: Number of BWGs issued with the notification (Wet waste)


Navigation -- City Profile>>Notification Management
Procedure

19
C4-J: Number of commercial BWGs practicing on-site wet waste processing
Navigation -- City Profile>>City BWG>>BWG Details>> Q8

Procedure

C4-K: Number of Residential (Non-RWAs) BWGs practicing on-site wet waste processing.

Navigation -- City Profile>>City BWG>>BWG>>bulk waste generator details>>Q8


Procedure

20
C4-L: Number of RWA BWGs practicing on-site wet waste processing.
Navigation City Profile>>City BWG>>BWG>>RWA>>bulk waste generator details>>Q17

Procedure

C4-M: Number of institutional BWGs practicing on-site wet waste processing.


Navigation -- City Profile>>City BWG>>BWG>>RWA>>bulk waste generator details>>Q17
Procedure

21
C4-N: What standard norm (KG per day) has been notified by ULB for BWGs to practice on-site wet
waste processing?
Navigation -- city profile>>city level details>>city level
declarations>>Q1 Procedure

C4-O: How many BWGs (of all identified) hand-over their wet-waste to ULB?

Navigation -- city profile>>city bulk waste generators>>BWG>>bulk waste generator


details>>Q17

Procedure

22
C5: Waste Processing& Capacity- Wet Waste
Questions under C5
A: Total wet waste generated in the city (During last 6 months in TPD)
B: Total Wet waste processed in the city (During last 6 months in TPD)
C: Total Wet waste processing Capacity through Functional and Clustered (If any) Plants in the city
(In TPD)
D: Total waste (Dry + wet) generated in the city (During last 6 months in TPD)

C5-A: Total wet waste generated in the city (During last 6 months in TPD)

Navigation -- City Progress>>City Level Progress>>Generation, Collection & Distribution


Procedure

C5-B: Total Wet waste processed in the city (During last 6 months in TPD)
Navigation -- City Progress>>City Level Progress>>Monthly Progress Report
Procedure

23
C5-C: Total Wet waste processing Capacity through Functional and Clustered (If any) Plants in the city
(In TPD)

Navigation -- City Profile>>City Facilities>>Processing Plants

Procedure

C5-D: Total waste (Dry + wet) generated in the city (During last 6 months in TPD)

Navigation -- City Progress>>City Level Progress>>Generation, Collection& Distribution

Procedure

24
C6: Waste Processing & Capacity- Dry Waste
Questions under C6
A: Total Dry waste generated in the city (During last 6 months in TPD)
B: Total Dry waste collected in the city (During last 6 months in TON)
C: Total Dry waste processed in the city through MRF, RDF or Waste to Energy plants (During last 6
months in TPD)
D: Total recyclables sold/used (During last 6 months in TPD) as per the sales record
E: Total Dry waste processing Capacity through Functional and Clustered (If any) Plants (MRF, RDF,
Plastic waste recycling facility or Waste To Energy plants) in the city (During last 6 months in TON)
Note: There should not be double counting of capacities, and in case of shared facility being used by
the cities, the capacities are divided.

C6-A: Total Dry waste generated in the city (During last 6 months in TPD)

Navigation -- City Progress>>City Level Progress>>Generation, Collection & Distribution

Procedure

25
C6-B: Total Dry waste collected in the city (During last 6 months in TON)

Navigation -- City Progress>>City Level Progress>>Generation, Collection & Distribution

Procedure

C6-C: Total Dry waste processed in the city through MRF, RDF or Waste to Energy plants (During last
6 months in TPD)
Navigation -- City Progress>>City Level Progress>>Segregation & Processing
Procedure

26
C6-D: Total recyclables sold/used (During last 6 months in TPD) as per the sales record.
Navigation --City Progress>>City Level Progress>>Sales & Transfers
Procedure

27
C6-E: Total Dry waste processing Capacity through Functional and Clustered (If any) Plants (MRF,
RDF, Plastic waste recycling facility or Waste to Energy plants) in the city (During last 6 months in
TON)
Note: There should not be double counting of capacities, and in case of shared facility being used by the
cities, the capacities are divided.

Navigation --City Profile>>City Facilities>>Processing Plants


Procedure

28
C7: Dumpsite Remediation
Questions under C7
A: Identification survey of dumpsite conducted in last 12 months (from the date of application)
B: Work order issued for legacy Waste Dumpsite
C: Self declaration for "no dumpsite found" by the ULBs chairperson submitted to authority
E: Number of dumpsites identified for remediation
F: Total amount of legacy waste identified in the city (TON)
G: Total amount of legacy waste remediated (Completed & On-Going) (TON)

C7-A: Identification survey of dumpsite conducted in last 12 months.

Navigation --City Profile>>City Level Details>>City Level Declarations>>Q8

Procedure

29
C7-B: Work order issued for legacy Waste Dumpsite
Navigation –City Profile-> City Facility->Dumpsite

Procedure

C7-C: Self declaration for "no dumpsite found" by the ULBs chairperson submitted to authority

Navigation --City Profile>>City Level Details>>City Level Declarations Q8


Procedure

30
C7-E: Number of dumpsites identified for remediation.
Navigation –City Profile>>City Facilities>>Dumpsites
Procedure

C7-F: Total amount of legacy waste identified in the city (TON)

Navigation --City Profile>>City Facilities>>Dumpsites


Procedure

31
C7-G: Total amount of legacy waste remediated (Completed & On-Going) (TON)
Navigation -- City Profile>>City Facilities>>Dumpsites (Legacy Waste Management)
Procedure

C15: Geo-mapping of waste processing facilities, C&D facilities, landfills, dumpsites, STPs/ FSTPs
Questions under C15
A -- Whether the ULB is in compliance with Geo-mapping of waste management facilities?
B -- Total number of Geo-Tagged C&D collection & storage center
C -- Number of MRFs within/for ULB
D -- Number of MRFs within/for ULB are geo-mapped and linked on Swachhatam portal
E -- Number of wet-waste processing facilities within/for ULB
F -- Number of wet-waste processing facilities within/for ULB are geo-mapped and linked on
Swachhatam portal
G -- Number of dumpsites within/for ULB
H -- Number of dumpsites within/for ULB are geo-mapped and linked on Swachhatam portal
I -- Number of scientific landfills within/for ULB
J -- Number of scientific landfills within/for ULB are geo-mapped and linked on Swachhatam portal
K -- Number of waste to energy facilities within/for ULB
L -- Number of waste to energy facilities within/for ULB are geo-mapped and linked on Swachhatam
portal
M -- Number of C&D waste processing and recycling facilities within/for ULB
N -- Number of C&D waste processing and recycling facilities within/for ULB are geo-mapped
and linked on Swachhatam portal
O -- Number of C&D waste collection centers within/for ULB
P -- Number of C&D waste collection centers within/for ULB are geo-mapped and linked on
Swachhatam portal
Q -- Number of STPs/FSTPSs within/for ULB
R --Number of STPs/FSTPSs within/for ULB are geo-mapped and linked on Swachhatam portal

32
C15-A: Whether the ULB is in compliance with Geo-mapping of waste management facilities?

Navigation -- GIS>>GIS Dashboard>>City Facility Details>>Processing Plant Details

Procedure

C15-B: Total number of Geo-Tagged C&D collection & storage center

Navigation -- GIS>>GIS Dashboard>>City Facility Details>>Secondary Storage


Procedure

33
C15-C: Number of MRFs within/for ULB
Navigation -- City Profile>>City Facilities>>Processing Plants>>Plant Type
Procedure

C15-D: Number of MRFs within/for ULB are geo-mapped and linked on Swachhatam portal.

Navigation -- City Profile>>City Facilities>>Processing Plants>> Processing Plant Details


Procedure

34
C15-E: Number of wet-waste processing facilities within/for ULB
Navigation-- City Profile>>City Facilities>>Processing Plants>>Plant Type

Procedure

C15-F: Number of wet-waste processing facilities within/for ULB are geo-mapped and linked on
Swachhatam portal.
Navigation – Geographical Information System(GIS)>>GIS Dashboard>>Processing Plant
Procedure

35
C15-G: Number of dumpsites within/for ULB
Navigation -- City Profile>>City Facilities>>>>Dumpsites>>List of Dump Site
Procedure

C15-H: Number of dumpsites within/for ULB are geo-mapped and linked on Swachhatam portal
Navigation –Geographical Information System (GIS)>>GIS Dashboard>>Dump Site Details

Procedure

36
C15-I: Number of scientific landfills within/for ULB
Navigation -- City Profile>>City Facilities>>Landfills>>List of Scientific Landfill Site
Procedure

C15-J: Number of scientific landfills within/for ULB are geo-mapped and linked on Swachhatam
portal
Navigation -- Geographical Information System (GIS)>>GIS Dashboard>>Landfills Details
Procedure

37
C15-K: Number of waste to energy facilities within/for ULB
Navigation -- City Profile>>City Facilities>>Processing Plants>>Plant Type
Procedure

C15-L: Number of waste to energy facilities within/for ULB are geo-mapped and linked on
Swachhatam portal
Navigation -- Geographical Information System (GIS)>>GIS Dashboard>>Processing
Plant Details
Procedure

38
C15-M: Number of C&D waste processing and recycling facilities within/for ULB
Navigation -- City Profile>>City Facilities>>Processing Plants>>Plant Type
Procedure

C15-N: Number of C&D waste processing and recycling facilities within/for ULB are geo-mapped
and linked on Swachhatam portal
Navigation -- Geographical Information System (GIS)>>GIS Dashboard>>Processing
Plant Details
Procedure

39
C15-O: Number of C&D waste collection centers within/for ULB
Navigation -- City Profile>>City Facilities>>Secondary Storage>>Type
Procedure

C15-P: Number of C&D waste collection centers within/for ULB are geo-mapped and linked
on Swachhatam portal.
Navigation -- Geographical Information System (GIS)>>GIS Dashboard>>Secondary Storage
Details
Procedure

40
C15-Q: Number of STPs/FSTPSs within/for ULB
Navigation -- City Profile>>City Facilities>>Processing Plants>>Plant Type
Procedure

C15-R: Number of STPs/FSTPSs within/for ULB are geo-mapped and linked on Swachhatam portal
Navigation -- City Profile>>City Facilities>>Processing Plants>>Plant Type
Procedure

41
Aspirational Indicators

Ward level Parameters

C16: Geo-mapping of the wards i.e. ward boundaries, drains, nallahs, water bodies
Questions under C16

B: Number of wards with geo-tagged boundaries and linked on Swachhatam portal


C: Total number of water bodies with geo-tagged and linked on Swachhatam portal
D: Total number of nallahs with geo-tagged and linked on Swachhatam portal
E: Total number of wards with 100% SWDs geo-tagged and linked on Swachhatam portal
F: Total no. of wards
G: Total number of water bodies in the city
H: Total number of nallahs/drains in the ULB

C16-B: Number of wards with geo-tagged boundaries and linked on Swachhatam portal

Navigation – Geographical Information System (GIS)>>GIS Dashboard>>ULB’s Ward


Details

Procedure

42
C16-C: Total number of water bodies with geo-tagged and linked on Swachhatam portal.

Navigation – Geographical Information System (GIS)>>GIS Dashboard>>City Facility


Details

Procedure

C16-D: Total number of nallahs with geo-tagged and linked on Swachhatam portal.

Navigation – Geographical Information System (GIS)>>GIS Dashboard>>City Facility


Details

Procedure

43
C16-E: Total number of wards with 100% SWDs geo-tagged and linked on Swachhatam portal

Navigation – Geographical Information System (GIS)>>GIS Dashboard>>City Facility


Details

Procedure

44
C18: Sale of waste by-products
Questions under C18

A: Quantity of waste by products (compost) sold or self-utilized (on the basis of commercial rate that
ULB charges for supplying/selling compost) from total compost produced in the city (During last 6
months in TPD)
B: Quantity of waste by products (methane) sold or self-utilized (on the basis of commercial rate that
ULB charges for supplying/selling methane) from total methane produced in the city (During last 6
months in TPD)
C: Quantity of waste by products sold from total recyclable dry waste in the city (During last 6 months
in TPD)
D: Quantity of waste by products (refined C&D) sold or self-utilized (on the basis of commercial rate
that ULB charges for supplying/selling C&D waste by products) from total C&D waste processed in
the city (During last 6 months in TPD)
E: Total Compost produced (During last 6 months in TPD)
F: Total Methane produced (During last 6 months in CuMPD).
G: Quantity of raw C&D waste used in municipal/ government/ municipality approved construction
activities in nonstructural applications: lower layers of road pavements, inner colony roads, filling of
plinth and basement etc.
H. Quantity of material made out of C&D Waste in municipal and/or government construction activity
(if available) in kerb stones, structural concrete as manufactured aggregate, paving blocks, bricks etc.

C18-A: Quantity of waste by products (compost) sold or self-utilized (on the basis of commercial rate
that ULB charges for supplying/selling compost) from total compost produced in the city (During last
6 months in TPD)

Navigation -- City Progress>>City Level Progress>>


Procedure

45
C18-B: Quantity of waste by products (methane) sold or self-utilized (on the basis of commercial
rate that ULB charges for supplying/selling methane) from total methane produced in the city
(During last 6 months in TPD)

Navigation -- City progress>> city level details>>sales

Procedure

C18-C: Quantity of waste by products sold from total recyclable dry waste in the city (During last 6
months in TPD)

Navigation --City progress>> city level details>>sales


Procedure

46
C18-D: Quantity of waste by products (refined C&D) sold or self-utilized (on the basis of
commercial rate that ULB charges for supplying/selling C&D waste by products) from total C&D
waste processed in the city (During last 6 months in TPD)

Navigation --City progress>> city level details>>Sales & Transfers


Procedure –

C18-E: Total Compost produced. (During last 6 months in TPD)

Navigation -- City progress>>city level progress>>processed

Procedure

47
C18-F: Total Methane produced. (During last 6 months in CuMPD).

Navigation --City progress>> city level details>>sales


Procedure

C18-G - Quantity of raw C&D waste used in municipal/ government/ municipality approved
construction activities in nonstructural applications: lower layers of road pavements, inner colony
roads, filling of plinth and basement etc

48
C18-H: Quantity of material made out of C&D Waste in municipal and/or government construction
activity (if available) in kerb stones, structural concrete as manufactured aggregate, paving blocks,
bricks etc.

49
C20: Processing of Sanitary and Domestic Hazardous waste
Questions under C20

A: Whether the ULB collects sanitary waste separately?


B: Whether the ULB collects domestic hazardous waste separately?)
C: Total quantity of sanitary waste (menstrual waste, baby/adult diapers and others) collected in last
6 months (in TPD)
D: Total quantity of domestic hazardous waste (CFL bulb, expired medicines, used batteries, used
syringes, pesticide cans etc.) collected in last 6 months (in TPD)
E: Total quantity of sanitary waste (menstrual waste, baby/adult diapers and others) processed in last
6 months (in TPD)
F: Total quantity of domestic hazardous waste (CFL bulb, expired medicines, used batteries, used
syringes, pesticide cans etc.) processed in last 6 months (in TPD)
G: Number of sanitary waste processing units within/for the ULB
H: Number of domestic hazardous waste processing units within/for the ULB
I: Installed capacity of sanitary waste processing unit in (TPD)
J: Installed capacity of domestic hazardous waste processing unit in (TPD)

C20-A: Whether the ULB collects sanitary waste separately?

Navigation -- city progress>>city level progress>>collection

Procedure

50
C20-B: Whether the ULB collects domestic hazardous waste separately?

Navigation -- City progress>>city level progress>>collection

Procedure

C20-C: Total quantity of sanitary waste (menstrual waste, baby/adult diapers and others) collected in
last 6 months (in TPD)

Navigation -- City progress>>city level progress>>collection

Procedure

51
C20-D: Total quantity of domestic hazardous waste (CFL bulb, expired medicines, used batteries, used
syringes, pesticide cans etc.) collected in last 6 months (in TPD)

Navigation --City progress>>city level progress>>collection

Procedure

C20-E: Total quantity of sanitary waste (menstrual waste, baby/adult diapers and others) processed in
last 6 months (in TPD)

Navigation --City progress>>city level progress>>processed

Procedure

52
C20-F: Total quantity of domestic hazardous waste (CFL bulb, expired medicines, used batteries, used
syringes, pesticide cans etc.) processed in last 6 months (in TPD)

Navigation -City progress>>city level progress>>processed

Procedure

C20-G: Number of sanitary waste processing units within/for the ULB

Navigation -- City profile>>city facilities>>processing plants

Procedure

53
C20-H: Number of domestic hazardous waste processing units within/for the ULB

Navigation -- City profile>>city facilities>>processing plants

Procedure

C20-I: Installed capacity of sanitary waste processing unit in (TPD)

Navigation -- City profile>>city facilities>>processing plants


Procedure

54
C20-J: Installed capacity of domestic hazardous waste processing unit in (TPD)

Navigation -- city profile>> city facilities>>processing plants

Procedure

55

You might also like