0% found this document useful (0 votes)
56 views8 pages

Akbar CV - SCE - Certificates

Uploaded by

Casil Ciudad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views8 pages

Akbar CV - SCE - Certificates

Uploaded by

Casil Ciudad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

SYED AKBAR ALI

` Dedicated and experience Senior Mechanical Engineer with 7+ years of hands-on


experience in the field of Testing commissioning, construction and maintenance of MEP
Services in major MEP projects from concept to completion. Proficient in managing project
timelines, ensuring compliance with industry standards, and maximizing operational
efficiency. Seeking an opportunity to contribute my skills and knowledge to a dynamic
engineering team.
P E R SONA LDETA ILS: WORK E XP E RIE NC E
Mobile: +966 503654579 November 2023– till date
Email: [email protected] MEP Maintenance Engineer • Dammam Development Company (KSA)
Nationality: Indian Projects: Porto Arabia Resort, Ash Shaati Plaza, Khober Complex and Dahya
Marital status: Married complex.
C E RTIF ICAT ION  Responsible for maintenance and refurbishment of 10 sites including resort,
Certified member of SCE (Saudi shopping mall, office building and residential villas.
council of engineering)
 Responsible for maintaining all major equipment of MEP system such as
E D U CATION :
air-conditioning units, transfer pumps, booster pumps, submersible
Bachelors in Mechanical Engineering
pumps, RO plant etc.
from Osmania University
D R I VING LI C ENSE:  Responsible for installation and maintenance of all MEP equipment as per
Valid Saudi Driving License the client requirement.
SKILLS:  Maintaining the all Electrical equipment including 125 KVA generator for
Quality Control & Assurance power redundant.
Process Improvement
 Conducted on-site inspections and quality checks, resolving issues promptly
Regulatory Compliance
to keep sites maintained and on track.
Root Cause Analysis
Team Leadership  Coordinating with design and construction teams for new proposals and
Data Analysis major changes on site as per client requirement.
Supplier Management  Coordinating with subcontractors and suppliers, overseeing the
Continuous Improvement procurement and delivery of materials and equipment.
Problem-Solving
 Provide Training to site staff to ensure high-quality workmanship and safety
L A N GUAGES K N O WN:
standards.
English
Arabic  Responsible for planning and carrying out scheduled maintenance and
Urdu responding emergencies 24 x 7.
Telugu
November 2020–September 2023
I N T E RN A T I ON AL
S T A ND ARDS: Senior Mechanical Engineer • The Best Trading and Contracting(Qatar)
ASHRAE, BSRIA, CIBSE, SMACNA, and Project: Qatar Emiri Signal Corps New Camp (QESC)
NFPA, etc.  Responsible for testing and commissioning of all Mechanical and HVAC
D E S IGN AN D AN ALYSIS equipment such as AHU, FCU and chiller
P A C K AGES:  Pre-commissioning of dampers like VAV, VCD, MSFD, Fire dampers etc.
AutoCAD and Basic knowledge of
 Implementation of Testing Adjusting and Balancing (TAB) activities and
Rivet MEP
commissioning of HVAC systems starting from pre commissioning of all
S O F TWARE P A C K AGES:
System according to Design & Specification.
Microsoft Office (MS Word, Excel,
PowerPoint, Outlook, Mezzo team,  Managed and supervised major construction projects, ensuring adherence
Snag-R tools, etc. to design specifications, Quality and safety standards.
H V A C S O F TWARE:  Collaborated with architects, contractors, and other stakeholders to
Basic knowledge of Carrier (Block load develop project plans and ensure alignment with client expectations.
& Hap), Elite (CHVAC & RHVAC)
 Conducted and attended site progress meeting with other contractors and
staff to ensure smooth site progress.
 Monitored project timelines and budgets, making adjustments as needed to
ensure successful project delivery.
P R O J E CT P R O DU C T I ON
 Coordinated with subcontractors and suppliers, overseeing the
R E L ATED S O F TWARE :
procurement and delivery of materials and equipment.
SNAG-R
Mezzo team & Aconex  Provide Training to junior engineers and site staff to ensure high-quality
workmanship and safety standards.
June 2018–November 2020
Mechanical Site Engineer • QDVC (Q.S.C.) and Abantia Tempo(Qatar)
Project: Lusail Light Railway Transit (LRT)
 Site supervision of all Mechanical systems (i.e. HVAC, Plumbing, Drainage
and Fire Fighting system, etc.) installation
 Check and ensure that all relevant documents and material for the
particular section of work before the commencement of work
 Identifying, correction, and preparation of site drawing for amendments and
modification carried out in the field for safe routing of ducts and pipework.
 Quality checked at various stages of construction.
 Supporting the production/construction department, fellow workers, and
skilled technicians to achieve the scheduled and quality product by
conveying ideas efficiently and effectively in languages like English, Hindi, or
Arabic.
 Coordinating with quality department for Inspections related activities such
as closing the comments and NCRs.

November 2017–June 2018


Mechanical QC Engineer • Diplomat Fire System (Qatar)
Project: The Place Vendome Mall
 Quality checking at various stages of construction.
 Created and delivered quality training programs for employees, improving
overall quality awareness and adherence.
 Produced detailed quality reports and presented findings to senior
management, enabling data-driven decision-making
 Raising and Closing Non-compliance Reports (NCR’s) internal and external.
 Creating and developing method statements and testing plans.
 Preparing and following with the suppliers for the project close out
documents such as Operational Manual and warranties.
 Preparing project close out and handing over documents IOM manuals
 Spearheaded successful initiatives to reduce defects, improve product.
May 2016 - September 2017
MEP QA/QC Engineer• MS. Engineering Services (India)
Project: The Continental Hospital
 Conducting inspections as per ITP and WMS with consultant, clients or
concern third parties after reviewing drawings and related documents
 Conducting material inspection with client after delivery and prior to
installation on site.
 Checking / reviewing redline drawings after completion of work and prior to
final ceiling closure.
 Ensure that all inspections and redline drawing have been approved by the
client prior to final ceiling closure.
Declaration:

I hereby declare that the above mentioned information is true and correct to
the best of my knowledge.

Regards.
Syed Akbar Ali.
988367 988367

AKBAR ALI SYED


Membership Category: Engineer :
Specialization: Mechanical Engineering :
Membership Start Date: 11/23/2023 11/23/2023 :

23 November 2024 1446 22

You might also like