C3METALS Presentation October 2021

Download as pdf or txt
Download as pdf or txt
You are on page 1of 30

EXPLORING THE AMERICAS FOR

GIANT COPPER-GOLD DEPOSITS

WWW.C3METALS.COM
FORWARD-LOOKING STATEMENT

• Forward-Looking Statement This presentation contains certain statements that may constitute forward-looking information under applicable securities laws. All statements, other than those
of historical fact, which address activities, events, outcomes, results, developments, performance or achievements that C3 Metals anticipates or expects may or will occur in the future (in whole
or in part) should be considered forward-looking information. In some cases, forward-looking information is identified by the use of terms and phrases such as “anticipate”, “believe”, “could”,
“estimate”, “expect”, “intend”, “may”, “plan”, “predict”, “project”, “will”, “would”, and similar terms and phrases, including references to assumptions. Such information may involve, but is not
limited to, comments with respect to strategies, expectations, planned operations or future actions. These forward-looking statements are based on currently available competitive, financial
and economic data and operating plans as of the date of this presentation but are subject to known and unknown risks, uncertainties and other factors that may cause actual results,
performance or achievements or industry results to be materially different from those expressed or implied by such forward-looking information. Such factors are based on information
currently available to C3 Metals, including information obtained from third-party industry analysts and other third-party sources, and are based on management’s current expectations
regarding future growth, results of operations, future capital (including the amount, nature and sources of funding thereof) and expenditures. The forward-looking information contained in
this presentation is expressly qualified by this cautionary statement

• A number of risks, uncertainties and other factors could cause actual results to differ materially from the results discussed in the forward-looking information, including, but not limited to, the
following: risks associated with reliance on key personnel; financial health of C3 Metals' and its related cash flows; general industry and market conditions and growth rates; failure to realize
anticipated benefits of acquisitions and monetization opportunities; legislative and regulatory developments; reliance on major customers; general economic conditions and levels of economic
activity including interest rate and currency exchange rate fluctuation; current global financial conditions; failure to realize on growth initiatives; financing risks; degree of competition in the
industry; risks associated with the development of projects; changes in employee relations; control of costs and expenses including inability to repay maturing debt and to fund capital
expenditures and future acquisitions and dependence on information systems and technology; retaining main customers risk.

• Forward-looking information reflects C3 Metals’ current beliefs and is based on information currently available to C3 Metals and on assumptions it believes to be reasonable. In some instances,
material factors or assumptions are discussed in this presentation in connection with statements containing forward-looking information. Such material factors and assumptions include, but
are not limited to: the Company’s ability to execute on its business plan; the continued success of business development activities; new assets or projects will continue to be added to the
Company’s portfolio. The forward-looking information is made as of the date of this presentation and C3 Metals assumes no obligation to update or revise such information to reflect new
events or circumstances, except as may be required by applicable law. Because of the risks, uncertainties and assumptions contained herein, prospective investors should not read forward-
looking information as guarantees of future performance or results and should not place undue reliance on forward-looking information. Nothing in this presentation is, or should be relied
upon as, a promise or representation as to the future.

• There is no warranty or guarantee given by any person as to any forecast or financial outlook contained herein. In addition, such forecasts and financial outlooks reflect various assumptions by
C3 Metals. Although C3 Metals believes these assumptions to be reasonable, C3 Metals can give no assurance that such assumptions will prove to be correct and readers are cautioned that
such assumptions may prove to be incorrect. The actual results achieved will vary from the forecast or financial outlook results and the variations may be material. There is no guarantee that
any forecasts or financial outlooks will be achieved in whole or in part. To the extent any forward-looking statements contain forecasts or financial outlooks, such information is being provided
solely to enable a reader to assess C3 Metals’ financial condition and its operational history and experience in the resource exploration industry. Readers are cautioned that this information
may be not appropriate for any other purpose, including investment decisions.

• Industry and other statistical data presented in this presentation, except where otherwise noted, have been compiled from sources and participants which, although not independently verified
by C3 Metals, are considered by C3 Metals to be reliable sources of information. References in this presentation to research reports or to articles and publications should be not construed as
depicting the complete findings of the entire referenced report or article.

• Data for the Jasperoide Project was retrieved from Hochschild Mining’s database and internal reports. Hochschild was operator on the Jasperoide project from 2011 to 2012 and completed 2
drill Programs. C3 Metals had access to the entire drill database and was confident that the reporting of the information was to industry standard practice. The Company has not completed
sufficient work to verify all the historic information on the Jasperoide Project.

• The Qualified Person responsible for the technical information in this presentation is Stephen Hughes P. Geo., C3 Metals’ Vice President Exploration, who has approved the technical
information included herein. Any reference to historical estimates and resources should not be relied upon. These are not current and a Q.P. has not done sufficient work to classify these
historical estimate and C3 Metals Inc. is not treating the historical estimate as a current resource estimate.

TSX.V : CCCM WWW.C3METALS.COM 2


C3 METALS - COMPANY SNAPSHOT

CCCM – 3 YEAR STOCK CHART

SHAREHOLDER INFORMATION CORPORATE INFORMATION


Shares Outstanding 459.9M
Warrants (avg $0.09) 11.2M
Options (avg $0.09) 38.6M
RSUs and DSUs 3.1M
Share Price C$0.22
Market Cap (Undiluted) C$101.2M
Cash on Hand C$4.1M
TSX.V : CCCM WWW.C3METALS.COM 3
COPPER-GOLD INVESTMENT OPPORTUNITY
A PORTFOLIO & TEAM OF THIS CYCLE
Team, Experience and Project Pipeline Benoni
Fault Montana
• Experienced Board and Management
Controlling
• Proven Track Record of Development, Value Creation Structure
• Flagship Jasperoide Project in Southern Peru
• Pipeline of High-quality Cu-Au Projects in Jamaica

Jurisdiction and Tenement Package


• Peru, 2nd in global copper production and reserves
• 13 licenses covering 57km2
• Jamaica, mining accounts for 20% of GDP
• 5 licenses covering 207 km2

Mining and Infrastructure


• Jasperoide <40km from Las Bambas and Constancia
• Surrounded by existing mine infrastructure
• Jamaica long history of mining (bauxite, copper, gold)
• Historic workings, ease of access and permitting
TSX.V : CCCM WWW.C3METALS.COM 4
JASPEROIDE COPPER & GOLD PROJECT
Andahuaylas – Yauri Porphyry/Skarn Belt

Peru - Global Leader in Copper & Gold Production

• Ranked 2nd in global copper production

• Ranked 2nd in global copper reserves


PERU
• Rated 5th for global mining investment

• Mining is 12% of GDP and 60% of Export Revenue

Jasperoide - In the heart of ‘Elephant Country’

• 57km2 tenure in Andahuaylas – Yauri Belt JASPEROIDE


Lima

• Located within 50km of three major copper-gold deposits


Pacific Cusco
Ocean
Las Bambas 1.20BT @ 0.61% Cu, 197ppm Mo (MMG)1 Las Bambas
Haquira Constancia

Constancia 534MT @ 0.31% Cu, 97ppm Mo (HudBay)2 Antapaccay


Arequipa
Haquira 569MT @ 0.56% Cu (First Quantum)3
1- MMG Limited Mineral Resources and Ore Reserves Statement 30 June 2019, 2- Hudbay Mineral Reserves as of January 1, 2019, 3- First Quantum Minerals Annual Information Form 2019

TSX.V : CCCM WWW.C3METALS.COM 5


EXPLORING ELEPHANT COUNTRY
Andahuaylas – Yauri Porphyry / Skarn Belt
Cusco
(Pop. 430k)
70km
LAS BAMBAS (MMG)
1.2BT @ 0.61% Cu
Production Rate ≈ 350ktpd

40km
JASPEROIDE

HAQUIRA (FIRST QUANTUM)


569 MT @ 0.56% Cu 35km
Development Stage

PAMPACANCHA (HUDBAY)
40MT @ 0.6% Cu, 0.4g/t Au
2021 Production Permit

CONSTANCIA (HUDBAY)
534 MT @ 0.31% Cu
Production Rate ≈ 80ktpd

TSX.V : CCCM WWW.C3METALS.COM 6


HISTORIC EXPLORATION RESULTS
Exceptional Grades & Upside Potential

High Grade Mineralization at Surface Previous Drilling Programs


• Up to 14g/t Au and 18.5% Cu in rock chips • Average hole depth <200 metres
Select Historic Drill Results - Main Skarn • JADD11-03, final 6m assayed 3.0% Cu
• 113.0m @ 1.13% Cu, 0.32g/t Au Mineralization Confirmed Along Strike
• 24.3m @ 5.76% Cu, 0.09g/t Au • Single hole JADD11-20, 650 northwest
• 185.2m @ 1.00% Cu, 0.39g/t Au of Main Skarn, 23.5m @ 1.86% Cu
• 125.6m @ 0.79% Cu, 0.58g/t Au
Cresta Verde Zone Montaña de Cobre Zone Callejón de Oro Zone

Skarn Outcrops JADD11-20 Main Skarn JADD11-20 Skarn Outcrops


No Drilling 23.5m @ 1.86% Cu Majority of Historic Drilling No Drilling

N Single Drill Hole


S

>3KM CONTINUITY OF SKARN OUTCROPS

Panoramic view of the Jasperoide Project, June 2019

TSX.V : CCCM WWW.C3METALS.COM 7


C3 METALS JASPEROIDE DISTRICT
Tenements & Applications Cover >115km2

Applications
(Under Process)

Jasperoide 1 – 11
(100% C3)

Greatiam 10 & 70
(C3 Earn-In 100%)
DRILL PERMIT

TSX.V : CCCM WWW.C3METALS.COM 8


2021 EXPLORATION PROGRAM
Phase 1 Completed on Schedule

DRILLING

10,000m from 12 platforms

Larger Rig on order, 4-6 weeks

SURFACE EXPLORATION

Geologic Mapping over 9km2

Soil Grid over 9km2 Outcrop of diorite with oxidized stockwork veins at Callejón de Oro

Channel Sampling

• Structural Interpretation Over Entire Area

GEOPHYSICS

Airborne Magnetic Completed 57km2

300-m Spaced Induced Polarization survey


Magnetite skarn cut by low sulphidation veins at Callejón de Oro

TSX.V : CCCM WWW.C3METALS.COM 9


SURFACE GEOCHEMISTRY
Copper in Soil Anomaly 3km in Strike Length
Cu PPM
SURFACE GEOCHEMISTRY Copper
in Rocks
Soil grid over entire permitted area
Copper
300m lines, 25m sample spacings in Soils

Strong copper-in soil anomaly over Magnetics Analytical Signal Image

3000m, coincident gold over 1200m

Coincident copper-in rock chips


Strong
anomaly over 3000m Copper
in Soils

Strong malachite in skarn

TSX.V : CCCM WWW.C3METALS.COM 10


JAS2650 DRILL CROSS SECTION
+350m Lateral Continuity

Hole From To Length


Cu Au Ag JASPEROIDE SKARN HORIZON
(%) (g/t) (g/t)
JAS2650-05 8.4 83.0 74.60 0.20 0.18 1.61
JAS2650-05 92.6 145.8 53.24 3.11 0.46 2.79
Including 116.0 145.8 29.84 4.96 0.56 3.34 Pooling of
Includes 128.0 145.1 17.10 6.69 0.59 3.71 Copper Fluids
JAS2650-05 156.6 164.3 7.70 1.49 0.02 3.11
JAS2650-05 178.0 195.0 17.00 2.10 0.61 4.79
JAS2650-06 1.7 119.0 117.30 1.31 0.15 3.19
Including 59.0 119.0 60.00 2.38 0.14 3.31
Includes 77.0 115.5 38.50 3.50 0.12 4.32
Includes 99.2 115.2 16.00 6.39 0.06 2.48
JAS2650-07 13.0 26.9 13.90 0.26 0.16 4.12
JAS2650-07 42.6 52.0 9.45 0.18 0.21 0.84
JAS2650-07 79.0 122.0 43.00 1.67 0.14 1.90
Including 103.9 122.0 18.10 3.72 0.02 2.76
Includes 112.0 122.0 10.00 4.23 0.02 2.57
JAS2650-01 41.0 170.0 129.00 0.49 0.37 2.25
Including 109.0 161.0 52.00 0.78 0.67 3.15
JAS2650-02 11.0 36.8 25.80 0.27 0.10 3.84
JAS2650-02 85.0 93.0 8.00 0.31 0.12 0.96
JAS2650-02 112.9 223.0 110.09 0.36 0.26 1.88
JAS2650-03 12.0 19.0 7.00 0.27 0.08 0.86 JAS26550-05 (152.5m)
JAS2650-03 25.0 46.0 21.00 0.38 0.18 1.07
JAS2650-03 70.4 124.4 54.05 1.17 0.45 1.86
JAS2650-03 154.9 181.0 26.10 2.19 0.69 3.97
JAS2650-04 15.0 22.0 7.00 0.37 0.20 1.52
Chrysocolla in oxidized skarn
JAS2650-04 31.0 178.2 147.20 0.40 0.17 1.42

TSX.V : CCCM WWW.C3METALS.COM 11


JAS2650 ENRICHMENT ZONE
“Pooling of Copper Fluids”
JAS2650-05 : 187.7m @ 9.12% Cu
Well-developed secondary copper enrichment zone
• JAS2650-05 : 53.24m @ 3.11% Cu & 0.46 g/t Au from 92.6m
• includes 17.10m @ 6.69% Cu, 0.59g/t Au

• JAS2650-06 : 117.30m @ 1.31% Cu & 0.15 g/t Au from 1.70m

• includes 38.50m @ 3.50% Cu & 0.12 g/t Au and includes 16.0m @ 6.39% Cu from 99.2m
• JAS2650-07 : 43.00m @ 1.67% Cu & 0.14 g/t Au from 79.00m (1.79% CuEq)

• includes 18.10m @ 3.72% Cu from 103.9m

JAS2650-06 core box interval 109.0 - 112.4m. Secondary copper mineralization, interval 109.0 – 113.0m assayed 4m @ 12.80% copper.

TSX.V : CCCM WWW.C3METALS.COM 12


MONTAÑA DE COBRE 2021 DRILLING
Well Developed Copper Oxide Deposit

Copper-Gold Mineralization From Surface

Skarn Oxidized to +200m, Marble Front

Vertically Zoned (Enrichment Profile)

• Leached Zone, lower grade

• Oxidized Zone, low to moderate grade

• Enriched Zone, high-grade


Brecciated skarn, strongly oxidized, chrysocolla
Epithermal Gold Overprint

• JAS2700-06 : 1.20m @ 47.7g/t Au

Porphyry Vectors

• Phyllic & endoskarn altered diorite

• Porphyry B-veins

• Mineralized porphyry fragments Oxidized skarn, manganese dendrites, malachite

TSX.V : CCCM WWW.C3METALS.COM 13


JAS2700 DRILL CROSS SECTION
+400m Lateral Continuity

Hole From To Length


Cu Au Ag JASPEROIDE SKARN HORIZON
(%) (g/t) (g/t)
JAS2700-01 35.00 50.00 15.00 0.41 0.15 1.68
JAS2700-01 79.00 181.00 102.00 0.61 0.23 1.60
JAS2700-02 22.10 50.00 27.90 0.21 0.06 0.86
JAS2700-02 68.44 168.25 99.81 0.90 0.34 2.30
JAS2700-02 184.60 201.10 16.50 0.46 0.37 1.37
JAS2700-02 210.71 223.35 12.64 0.26 0.00 0.84
JAS2700-03 60.00 80.65 20.65 0.26 0.12 3.15
JAS2700-03 87.29 206.00 118.71 1.15 0.37 1.94
Includes 106.05 136.00 29.95 2.57 0.50 3.03
JAS2700-04 52.80 65.85 13.05 0.50 0.07 1.20
JAS2700-04 70.31 99.98 29.67 0.13 0.17 2.44
JAS2700-04 109.85 165.00 55.15 NSA 0.27 2.96
JAS2700-04 165.00 205.20 40.20 0.73 0.23 1.35
JAS2700-05 56.50 64.70 8.20 0.25 0.03 0.89
JAS2700-05 70.60 88.00 17.40 0.32 0.15 1.79
JAS2700-05 89.10 115.60 26.50 NSA 0.41 30.10
JAS2700-05 119.80 206.60 86.80 0.42 0.32 1.18
HS Feeder
JAS2700-05 226.00 267.50 41.50 0.31 0.12 4.82
Structure
JAS2700-06 21.52 256.70 235.18 0.67 0.34 2.19
Includes 64.40 164.80 100.40 0.84 0.32 2.72
JAS2700-07 0.45 21.40 20.95 0.28 0.13 1.69
JAS2700-07 28.45 79.40 50.95 0.48 0.17 1.54
JAS2700-07 85.85 129.30 43.45 2.21 0.49 3.27
JAS2700-06 (202m)
Includes 113.50 128.50 15.00 5.44 0.39 6.65
JAS2700-08 4.10 15.30 11.20 0.25 0.12 2.83
JAS2700-08 21.30 108.60 87.30 0.97 0.35 1.90
Includes 62.10 68.35 6.25 1.44 0.56 1.84
Includes 83.79 108.60 24.81 2.00 0.61 2.10
Chrysocolla in brecciated skarn

TSX.V : CCCM WWW.C3METALS.COM 14


IMPORTANT PORPHYRY VECTORS
Mineralized Fragments, Molybdenite, Epithermal Veins

Causative Porphyry
JAS2650-04 (177.50m) Mineralized tonalite fragment, with 3-5% chalcopyrite

Metallic Blue Molybdenite


Silicified, Vuggy
JAS4350-02 (390m) massive pyrrhotite – pyrite, with coarse Molybdenite Brecciated High Sulphidation Feeder Structure

TSX.V : CCCM WWW.C3METALS.COM 15


2021 GEOPHYSICS MAGNETCIS & IP
Coincident Magnetic and IP Chargeability Anomalies

JAS4350-02 DDH, 300m intersection of skarn + sulphides Outcropping Magnetite Skarns >50m in True Width

JAS4350 JAS4350

JAS4050 JAS4050

Skarn & Porphyry Skarn & Porphyry Skarn


Skarn
Copper Sulphide Copper Sulphide Copper Oxide
Copper Oxide
Targets Targets Deposit
Deposit

Argillic Alteration
HS Veins
Magnetite Skarn
Skarn & LS Epithermal Veins Skarn &
Porphyry Copper Porphyry Copper
IP LONG SECTION
Sulphide Targets Sulphide Targets A NEXT SLIDE
Magnetics Analytical Signal Image (Left) and IP-Chargeability Model (Right) over the permitted area (650m Level)

TSX.V : CCCM WWW.C3METALS.COM 16


SIGNIFICANT HYDROTHERMAL PLUMBING SYSTEM
IP Chargeability Anomalies Increase in Size with Depth
Callejón de Oro Zone Montaña de Cobre Zone Cresta Verde Zone

Magnetite Skarn cut by Low Sulphidation Oxidized Skarn with significant secondary / oxide Skarn with semi to massive sulphides and diorite
Epithermal Veins, untested copper – gold mineralization cut by pyrrhotite-pyrite-chalcopyrite veins

A IP-Chargeability Long Section B

JAS4350-02
NEXT SLIDE

650m Below Surface

South North

TSX.V : CCCM WWW.C3METALS.COM 17


CRESTA VERDE NEW DISCOVERY
Copper Sulphides – Assays Pending

Chalcopyrite

Chalcopyrite
Pyrite
Pyrrhotite

Magnetite

Chalcopyrite

TSX.V : CCCM WWW.C3METALS.COM 18


JASPEROIDE PANORAMIC VIEW
Syncline, Stacked Skarns and Porphyry Potential

High & Low


Sulphidation
Epithermal
Veins

Causative
PorphyryIntrusion
Cu-Au System
Pre-Mineral
Central Core
Granodiorite Causative Intrusion
TSX.V : CCCM WWW.C3METALS.COM 19
JAMAICA TECTONIC SETTING
The Importance of the Crawl River Fault System

Tanama 3
Romero 2 0.9Mt Cu &
GoldQuest 2.3Moz Au
2.5Moz Au
Pueblo Viejo 1
Barrick/Goldcorp
15Moz Au

2
1

3
1

1Barrick website, 2Goldquest website, 3Singer et al 2008 Source : USGS

JAMAICA - Cretaceous volcanic rocks, overlain by Tertiary limestone cover


TSX.V : CCCM WWW.C3METALS.COM 20
JAMAICA ADVANCED STAGE CU-AU PROJECTS
Over CAD $17M on Exploration Expenditure

Montego Bay
Ocho Rios
Caribbean Sea

Port Antonio
ARTHURS SEAT

LEGEND

City
MAIN RIDGE
HUNGRY GULLY
Port

Road

Bauxite Plant
BELLAS GATE
100% Owned C3 Metals Inc.
Kingston

IMPORTANT CENTRAL INLIER PORPHYRY & EPITHERMAL BELT


WALK-UP UNTESTED, HIGH PRIORITY DRILL TARGETS
TSX.V : CCCM WWW.C3METALS.COM 21
HISTORIC HIGH-GRADE DRILL INTERSECTIONS
Porphyry & Epithermal Copper-Gold Systems
Cu Au
Multiple Drill Ready Copper-Gold Targets HOLE ID FROM TO LENGTH Project
(%) (g/t)
CAM92-01 0.00 137.16 137.16 0.56 0.25 Camel Hill
Connors Porphyry CAM92-02 0.00 111.25 111.25 0.43 0.25 Camel Hill

• Pervasive phyllic & potassic alteration CAM92-05 3.35 88.39 85.04 0.52 0.25 Camel Hill
CON-14-001 91.00 214.00 123.00 0.43 0.26 Connors
• Broad zones of copper-gold mineralization
CON-14-001 257.00 280.00 23.00 0.66 0.22 Connors
 114m @ 0.69% Cu and 0.52g/t Au (From 28m) CON-14-002 11.00 70.00 59.00 0.55 0.49 Connors
CON-14-002 88.00 123.00 35.00 0.43 0.16 Connors
 84m @ 1.00% Cu and 0.77g/t Au (From 14m)
CON-14-003 57.00 141.00 84.00 0.59 0.46 Connors
• Untested potential along strike, at depth CON-14-003 279.00 306.00 27.00 0.85 0.32 Connors
CON-14-004 28.00 142.00 114.00 0.69 0.52 Connors
Camel Porphyry Copper
CON-14-005 14.00 98.00 84.00 1.00 0.77 Connors
• Interpreted upper level of porphyry system CON-14-005 188.00 242.00 54.00 0.55 0.25 Connors
CON-14-007 80.00 120.00 40.00 0.46 0.19 Connors
• Strong Cu-Au mineralization in drill holes
CON-14-010 136.00 185.00 49.00 0.55 0.26 Connors
 137.2m @ 0.56% Cu and 0.25g/t Au CON92-2 13.72 100.58 86.86 0.68 0.42 Connors
DRH 001 19.00 24.00 5.00 0.01 1.11 Dry Hill
Charing Cross – Stamford Hill
DRH 002 13.00 19.00 6.00 0.00 1.34 Dry Hill
• Untested high grade epithermal vein system DRH 003 20.00 24.00 4.00 0.00 1.26 Dry Hill

TSX.V : CCCM WWW.C3METALS.COM 22


STRONG COPPER IN SOIL GEOCHEMISTRY
High-Quality Porphyry Style Soil Signature

Porphyry Drill Collars


NO. Rock Chips
Prospect

1 Connors

2 Camel Hill Rock Chips


Cu (ppm)

3 Coffee

4 Ginger Ridge

5 Connors SE

6 Hendley

7 Provost

8 Geo Hill

9 Bull Snap

10 Lucky Valley

TSX.V : CCCM WWW.C3METALS.COM 23


MINERALIZATION STYLES
High-Quality Porphyry and Epithermal Gold Systems
CONNORS COFFEE CAMEL
Chalcopyrite

Chalcopyrite

PROVOST CHARING CROSS

Chalcopyrite

Tennantite-
Tetrahedrite
Chalcopyrite

TSX.V : CCCM WWW.C3METALS.COM 24


GEOPHYSICS AN IMPORTANT EXPLORATION TOOL
Coincident Magnetic & Chargeability Anomalies

Porphyry
NO.
Prospect
IP-L7
1 Connors
IP-L6

2 Camel Hill IP-L5

IP-L4
3 Coffee
IP-L3
Geophysics
4 Ginger Ridge IP-L2 Line

IP-L1
5 Connors SE

6 Hendley

7 Provost

NEXT
8 Geo Hill SLIDE

9 Bull Snap

10 Lucky Valley

TSX.V : CCCM WWW.C3METALS.COM 25


CONNORS – CAMEL HILL – EPIDOTE RIDGE TREND
Interpreted Concealed Porphyry System

• Epidote Ridge 5km x 2km

• Erosional Windows
 Connors & Camel Hill
EPIDOTE RIDGE
 Porphyry veining & alteration GEOLOGIC MODEL

 High-grade Cu-Au intersections

• Compelling Geophysics Data GEOPHYSICS


SECTION
 Chargeability High - Sulphides

 Magnetic High – Magnetite

• Between Connors & Camel Hill


 Appear to be inherently linked

• TARGET – Vectors indicate a


potential concealed porphyry
below Epidote Ridge

TSX.V : CCCM WWW.C3METALS.COM 26


EVIDENCE OF A CONCEALED PORPHYRY SYSTEM
Porphyry Centre Interpreted Below Epidote Ridge
Porphyry style B-Veins with SCHEMATIC SECTION - EPIDOTE RIDGE GEOLOGIC MODEL Recently discovered zone of
3quartz stockwork veins at
disseminated chalcopyrite, DDH
CH12-07 (239 - 241m) assayed GOLD MINE Gold Mine prospect, >30m
0.70% Cu 0.40g/t Au PROSPECT wide exposure
3
CAMEL HILL CONNORS
Epidote – Magnetite
PORPHYRY Alteration PORPHYRY
1
Phyllic 2
Zone
Sheeted
B-Veins
1

Strong quartz stockwork veining


Potassic Stockwork
in DDH CON-14-003 (99-100m) Veining
assayed 1.1% Cu 0.81gt Au Zone
Andesitic Andesitic
Wall Rocks Wall Rocks

Core
2 3

TSX.V : CCCM WWW.C3METALS.COM 27


LARGE UNTESTED MAGNETIC FEATURE
Epidote Ridge, Compelling Magnetic Anomaly
Geo Hill (8) Connors (1) Bull Snap (9)

Line IP-L2

EPIDOTE RIDGE
GOH-15-001 CON-14-003

Strong
Magnetic
Feature
From To Length Cu Au
HOLE ID
(m) (m) (m) (%) (g/t)
HOLE ID From To Length Cu Au
(m) (m) (m) (%) (g/t) CON-14-003 57.0 141.0 84.0 0.59 0.46
GOH-15-001 63 283 220 0.24 0.07 CON-14-003 279.0 306.0 27.0 0.85 0.32

TSX.V : CCCM WWW.C3METALS.COM 28


COINCIDENT CHARGEABILITY ANOMALY
Interpreted Porphyry Centre to Connors - Camel - Geo Hill
Geo Hill (8) Connors (1) Bull Snap (9)

Line IP-L2

EPIDOTE RIDGE
GOH-15-001 CON-14-003

Coincident
Chargeability
Feature
Interpreted
Porphyry
Centre HOLE ID
From To Length Cu Au
(m) (m) (m) (%) (g/t)
HOLE ID From To Length Cu Au
(m) (m) (m) (%) (g/t) CON-14-003 57.0 141.0 84.0 0.59 0.46
GOH-15-001 63 283 220 0.24 0.07 CON-14-003 279.0 306.0 27.0 0.85 0.32

TSX.V : CCCM WWW.C3METALS.COM 29


POSITIONED FOR GROWTH

TEAM, TIMING & ASSETS


• Highly Experienced Board and Management Team
• Strong Track Record of Value Creation
• High-quality and Advanced Stage Copper-Gold Exploration Projects
• Flagship Jasperoide Project in Peru
• Bellas Gate and Main Ridge in Jamaica
• Jasperoide - A Rare Opportunity, Underexplored Copper-Gold Project
• Surrounded by Giant Deposits, Excellent Infrastructure
• Bellas Gate - At Least 10 Porphyry Targets, Multiple Epithermal Vein Targets
• Significant Potential to Host Large-Scale Porphyry
• Epidote Ridge and Coffee
• Drill Ready, KM-Scale Epithermal Copper-Silver-Gold System at Charing Cross

TSX.V : CCCM WWW.C3METALS.COM 30

You might also like