0% found this document useful (0 votes)
108 views4 pages

Communications Sample Questions

Uploaded by

xuan.zhang920
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views4 pages

Communications Sample Questions

Uploaded by

xuan.zhang920
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Additional

2365-210 knowledge check test


Communications

Sample e-volve MC Test

1 A worker lacks motivation and turns up on site in a bad mood. What is the first method for an employer to
address this situation?

A. Issue a formal letter.

B. Hold an informal discussion.

C. Leave the situation to resolve itself.

D. Provide the worker with simple tasks for the day.

2 A large delivery of electrical materials is expected. The vehicle will block road access and neighbouring
properties for up to an hour while it is unloaded.

What is the most appropriate method of communicating this to the neighbouring properties?

A. No communication is necessary.

B. Verbally inform the neighbours when the vehicle arrives.

C. Post written notes informing the neighbours in advance.

D. Inform the neighbours verbally when they ask what is going on.
3 What method would be the most suitable for monitoring materials expenditure and use for a large housing
development?

A. Written notes.

B. Spreadsheets.

C. Verbal communication.

D. Supplier websites and catalogues.

4 What best describes the process where relevant site representatives meet to discuss and agree a suitable
alternative location of equipment due to an issue?
A. Instruction.
B. Confrontation.

C. Observation.

D. Negotiation.
5 What would be the most suitable way for a company to determine the competence of an electrician with
regards to health and safety awareness?

A. Check their ECS card.

B. Check their Competency Scheme Card.

C. Check with City & Guilds for information.

D. Check for part P registration.

6 What must be taken into consideration when allocating work for the inspection and testing stage of a new
installation in a dwelling?

A. The operatives' level of competence.

B. The presence of other trades on site.

C. The operatives’ familiarity with the site.

D. Test instrument calibration certification.

7 What will be immediately affected if a sub-contractor has failed to meet a planned completion date?

A. Material costs and delivery.

B. Compliance with BS 7671.

C. The existing critical path network.

D. Compliance with Building Regulations.

8 Which document is completed in order to make a formal change to an agreed contract?

A. Defects letters.

B. Variation order.

C. Day worksheets.

D. Daily diary record.

9 What is the main purpose of the visitors’ book?

A. To monitor the performance of visitors.

B. To provide accurate site emergency/evacuation data.

C. To ensure and monitor the support by local building control.

D. To provide car registration details in case delivery vehicles are obstructed.


10 What colour are 110 V BS EN 60309-2 sockets and plugs?

A. Black.

B. Blue.

C. Red.

D. Yellow.

11 What information would be taken from the programme of works?

A. Type of accessories to be fitted.

B. Size of cable to be installed.

C. Rating of protected devices to be used.

D. Length of time temporary supplies are needed.

12 What is the most important consideration when checking the suitability of equipment from the material
schedule, if they are to be installed in a bathroom?

A. Their colour.

B. Their dimensions.

C. Their ingress protection.

D. Their fixing locations and type.

13 What would be checked to see if materials received are correct following an online order?

A. Daywork sheet.

B. Delivery note.

C. Site diary.

D. Variation order.

14 What are the best resources for identifying labour and material requirements for a major contract?

A. Supplier’s catalogues and delivery schedules.

B. Installation specification and programme of works.

C. Manufacturer’s installation instructions and user guides.

D. Building Regulations and local building control guidance.


15 What would be the most efficient delivery location for a large drum of SWA cable to a large factory site?

A. The main site gate.

B. The point of installation.

C. A secure storage container off site.

D. The contractor’s main office off site.

16 What is the most suitable method for storing drums of cable on a large housing development site?

A. Keep in individual contractor’s vans.

B. Keep in each dwelling for use as they are required.

C. Keep in a secure controlled container/building centrally.

D. No storage required as cable should only be ordered as and when required.