Design of Water Treatment Plant .. 100 M 3
Design of Water Treatment Plant .. 100 M 3
Design of Water Treatment Plant .. 100 M 3
Design Assumptions
Pumping time 16 hr/day
Flow rate 100 m3/hr
Clear water (qav) 0.02777777777778 m3/s
Raw water (qav) 0.02777777777778 m3/s
surface loading rate ≤ 0.5m3/m2/hr ̶ 4.5m3/m2/hr
therefore assumed = 0.8m3/m2/hr
number of tanks = 2
Depth of tank = 2 m
total depth = 2 ⁺
= 2.5 m
SEDIMENTATION TANK
Capacity of 1 tank
= design flow X Retention time
= 150 m3/hr
Volume of 1 tank
= area X
150 = π/4D2 X
76.3943727033152 = D2
D = √76.3943727
Diameter = 8.740387445 m
= volume of 1 tank
height of tank
60 m2
= 0.833333333333333 m3/m2/hr
= 4
= flow rate x
= 100 x
= 1600 m3/day
= 1648 m3/day
= 16 hrs
106.322580645161 m3/hr
= 17.7204301075269 m2
= 3.86021505 m
therefore B = √A/3
= √8.860215054/3
= 1.71854735690383 m
L = 5.1556420707115 m
Depth of sand = 6.70233469192495 m
Total Area Req = 17.7204301075269 m2
= 0.00177204301075269 Ha
0.5
height
2.5
OK
0.5 freeboard
Operating time
16
x 1.03
÷ filter loading rate
= on either side
Cross-sectional Area of lateral = 2(area of perforations per lateral. Take dia of holes (13mm)
= π D2
4
= 132.7857
= 0.013279
= 0.026557
range of dia holes
Number of holes = n.π(1,3) 2
0.053161 m2
4 531.6129 cm2
n = 4 x 531.6129
π x (1.3)2
= 400.354
= 405
= 405
42
= 9.642857
= 10
17.26214 cm2
= 0.599082
10
= 0.059908 m
2x 17.26214
34.52429 cm2
= 6.629629 cm 0.066296 m
= 0.814721 m/s
= 0.118136
0.345243
= 0.342183 m/s
WASHWATER GUTTER
Dis
on either side
area
3.142857
1.69