Station Batteries Test Report
Station Batteries Test Report
Station Batteries Test Report
Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 1 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
Panel ref:
Make
Type
AH Rating
Frequency
DATE:
TESTING ENGINEER CSD- Engineer
Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 2 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
3. ELECTRICAL CHECKS :
Remarks
Charging Voltage Charging time
DATE:
TESTING ENGINEER CSD- Engineer
Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 3 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
DATE:
TESTING ENGINEER CSD- Engineer
Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 4 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
Time : Temperature :
Total Terminal Voltage :
Cell Cell Cell Cell Cell Cell
No. Voltage No. Voltage No. Voltage
1. 21. 41.
2. 22. 42.
3. 23. 43.
4. 24. 44.
5. 25. 45.
6. 26. 46.
7. 27. 47.
8. 28. 48.
9. 29. 49.
10. 30. 50.
11. 31. 51.
12. 32. 52.
13. 33. 53.
14. 34. 54.
15. 35. 55.
16. 36. 56.
17. 37. 57.
18. 38. 58.
19. 39. 59.
20. 40. 60.
Note:
Discharge test shall be performed according to clause 6.4 of ANSI /IEEE 450 (1995)
Standards as stated in clause No. 2.2.4 of TCS-P105. Battery Discharging shall be
Stopped when cell voltage is equal to the design cell end voltage
DATE:
TESTING ENGINEER CSD- Engineer
Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 5 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
5. RE-CHARGE TEST:
Time : Temperature :
Total Terminal Voltage :
Cell Cell Specific Cell Cell Specific Cell Cell Specific
No. Voltag Gravity No. Voltag Gravity No. Voltage Gravity
e e
1. 21. 41.
2. 22. 42.
3. 23. 43.
4. 24. 44.
5. 25. 45.
6. 26. 46.
7. 27. 47.
8. 28. 48.
9. 29. 49.
10. 30. 50.
11. 31. 51.
12. 32. 52.
13. 33. 53.
14. 34. 54.
15. 35. 55.
16. 36. 56.
17. 37. 57.
18. 38. 58.
19. 39. 59.
20. 40. 60.
Note : Final set of voltage and special gravity readings shall be recorded after appropriate time on float
Voltage
DATE:
TESTING ENGINEER CSD- Engineer
Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 6 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
B.4. BATTERY KEPT AT_________ (i.e. FLOAT VOLTAGE SPECIFIED BY MANUFACTURER
NOTE:
While battery on float, read and record the voltage of each cell or unit and battery terminals float voltage.
Disconnect the battery charger and any other load on the battery.
Select the discharge rate based upon the battery capacity (ampere-hour) and the time period the test shall be carried out
for 10 hours.
With the variable load bank (dummy load) with an ammeter in series and a voltmeter across the battery terminals,
connect the load while simultaneously starting the timing device.
Maintain the correct current while periodically reading and recording total battery voltage. After 10 hours record the final
unit voltage and compare the test result with the manufacturers recommended voltage chart to confirm the battery end
voltage.
DATE:
TESTING ENGINEER CSD- Engineer