STATION BATTERIES

SITE TEST REPORT

Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 1 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL DATA AND INFORMATION.

Panel ref:
Make
Type
AH Rating
Frequency

2. MECHANICAL AND VISUAL INSPECTION CHECKS :

Item Description Remarks


1. Inspection for physical damage / defects
2. Check name plate information for correctness (type of battery, AH capacity, date of
manufacture.
3. Check tightness of all external wiring and cabling connections.
4. Verify all panel mounted devices (meters, switches, push buttons, indicator lamps,
etc.,)are supplied and installed according to approved drawings.
5. Make sure all battery connections are clean and free from corrosion.
6 Verify system configuration and capacity with contract specification.
7. Check that all cells are properly numbered.
8. Check protective covers installed
9. Check that all battery maintenance tools and accessories (hydrometer, wall mounted
thermometer, insulated torque wrench, rubber gloves, apron, face shield, etc.) have
been provided per specification. Ensure that all maintenance equipment is stored in a
wall mounted lockable cabinet.
10. Check that room ventilation, exhaust fan, etc., are to be specified.
11. Check installation of safety equipment (eye wash, showers, “No Smoking” and
“Warning Caustic / Acid” signs).
12. For Flooded Lead Acid batteries, check for correct specific gravity and liquid level.
13. Check that all battery racks are correctly and securely grounded.
14. Check that the battery bank is provided with an isolation disconnect switch.
15. Check that the Valve Regulated lead Acid ( VRLA) battery bank, has an ammeter
provided for monitoring the float charge current.

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
STATION BATTERIES
SITE TEST REPORT

Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 2 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:

3. ELECTRICAL CHECKS :

Item Description Remarks


1. For Valve Regulated Lead Acid Batteries, check the open circuit voltage of each cell.
2. Perform Initial charging of the battery (equalize voltage, charging rate and charging
time according to the manufacturer’s instructions).
3. Record individual cell voltage electrolyte specific gravity and cell temperatures at the
end of charge cycle
4. Battery Discharge test: Room
a. Battery must not have been discharged within last 7 days before test is temperature
performed. shall between
b. While battery on float, read and record the voltage of each cell or unit and 25 and 30°C
battery terminals float voltage.
c. Disconnect the battery charger and any other load on the battery.
d. Record the individual voltage of each unit and battery terminals.
e. Select the discharge rate based upon the battery capacity (ampere- hour) and
the time period the test shall be carried out for 10 hours.
f. With the variable load bank (dummy load) with an ammeter in series and
voltmeter across the battery terminals, connect the load while simultaneously
starting the time device.
g. Maintain the correct current while periodically reading and recording total
battery voltage. After 10 hrs. record the final unit voltage and compare the test
result with the manufacturer’s recommended voltage chart to confirm the
battery end voltage.
5. Fully recharge the battery according to the manufacturer’s instructions.

1. Open circuit voltage check (for VRLA):

2. INITIAL CHARGING TEST:

Remarks
Charging Voltage Charging time

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
STATION BATTERIES
SITE TEST REPORT

Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 3 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:

3. Record cell voltage electrolyte specific gravity &Temperatures:

DATE : Time : Temperature :


Total Terminal Voltage :
Cell Cell Sp. Cell Cell Sp. Cell Cell Sp.
No. Voltage Gravity No. Voltage Gravity No. Voltage Gravity
1. 21. 41.
2. 22. 42.
3. 23. 43.
4. 24. 44.
5. 25. 45.
6. 26. 46.
7. 27. 47.
8. 28. 48.
9. 29. 49.
10. 30. 50.
11. 31. 51.
12. 32. 52.
13. 33. 53.
14. 34. 54.
15. 35. 55.
16. 36. 56.
17. 37. 57.
18. 38. 58.
19. 39. 59.
20. 40. 60.

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
STATION BATTERIES
SITE TEST REPORT

Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 4 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:

4. HOUR DISCHARGE TEST

Discharge Total Terminal voltage


Time started Time stopped Remarks
Current After Discharge

Time : Temperature :
Total Terminal Voltage :
Cell Cell Cell Cell Cell Cell
No. Voltage No. Voltage No. Voltage
1. 21. 41.
2. 22. 42.
3. 23. 43.
4. 24. 44.
5. 25. 45.
6. 26. 46.
7. 27. 47.
8. 28. 48.
9. 29. 49.
10. 30. 50.
11. 31. 51.
12. 32. 52.
13. 33. 53.
14. 34. 54.
15. 35. 55.
16. 36. 56.
17. 37. 57.
18. 38. 58.
19. 39. 59.
20. 40. 60.

Note:
Discharge test shall be performed according to clause 6.4 of ANSI /IEEE 450 (1995)
Standards as stated in clause No. 2.2.4 of TCS-P105. Battery Discharging shall be
Stopped when cell voltage is equal to the design cell end voltage

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
STATION BATTERIES
SITE TEST REPORT

Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 5 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:

5. RE-CHARGE TEST:

Re-Charging Voltage Re-Charging time Remarks

Time : Temperature :
Total Terminal Voltage :
Cell Cell Specific Cell Cell Specific Cell Cell Specific
No. Voltag Gravity No. Voltag Gravity No. Voltage Gravity
e e
1. 21. 41.
2. 22. 42.
3. 23. 43.
4. 24. 44.
5. 25. 45.
6. 26. 46.
7. 27. 47.
8. 28. 48.
9. 29. 49.
10. 30. 50.
11. 31. 51.
12. 32. 52.
13. 33. 53.
14. 34. 54.
15. 35. 55.
16. 36. 56.
17. 37. 57.
18. 38. 58.
19. 39. 59.
20. 40. 60.

Note : Final set of voltage and special gravity readings shall be recorded after appropriate time on float
Voltage

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
STATION BATTERIES
SITE TEST REPORT

Contract No. :
Name of Substation:
Customer Name: RC/SEC-EOA Page 6 of 6
Panel/Bay No.: Equip. No.: Dwg. Ref.: Record No.:
B.4. BATTERY KEPT AT_________ (i.e. FLOAT VOLTAGE SPECIFIED BY MANUFACTURER

NOTE:

Battery discharge test:


 The battery must not have been discharged within last 7 days before test is performed.

 While battery on float, read and record the voltage of each cell or unit and battery terminals float voltage.

 Disconnect the battery charger and any other load on the battery.

 Record the initial voltage of each unit and battery terminals.

 Select the discharge rate based upon the battery capacity (ampere-hour) and the time period the test shall be carried out
for 10 hours.

 With the variable load bank (dummy load) with an ammeter in series and a voltmeter across the battery terminals,
connect the load while simultaneously starting the timing device.

 Maintain the correct current while periodically reading and recording total battery voltage. After 10 hours record the final
unit voltage and compare the test result with the manufacturers recommended voltage chart to confirm the battery end
voltage.

 Fully recharge the battery according to the manufacturer’s instructions.

DATE:
TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________