Project Name : Response to Drought Crisis in Somalia

Area / Village: Balli x.Diriye village, Odwayne district , Togdheer Region-Somaliland.

BILL OF QUANTITY FOR REHABILITATION OF HAFFIR DAM- 10,000m3


# Description Unit Qty Rate US$ Amount
US$
1 Dam desilting, removing the old craked HDPE
geomembrane sheets,+ siltrap desilting.
1.1 Mobilization and demobilization Lum 1.00
1.2 Romove the silt accumulated (desilting) above Job 1.00
the HDPE geomemebrane sheets in the main
Hafir pan and remove the old geomemebrane
sheets with dimensions of( 80mx50m). keep
the Dam side slopes of the embakments with
ratio of 1:2. maintain the bottom depth hight
of the dam with 2.5m minimum. Maintain a
minimum 5m berm between and the reservoir
and the embankment as directed by by
Supervisor Engineer.
1.3 Desilt the existing silt trap champer with m³ 390.00
dimmensions of 13m*15*2m deep.

1.4 Excavation of the outlet and inlet channels - m³ 150.00


100x3x0.5m
Sub Total 1- Pan desilting and siltrap works
2 HDPE Geo membrane Dam Liner Material
2.1 Supply and instal 1.5mm Thick approved m2 4,000.00
quality Geosynthetic water proof sheets (HDPE
smooth Geomembrane plastic liner) laid over
well compacted soil bed bottom and sides of
entire dam.(80mx50m)

2.2 excavate/dug atrench of (0.4mdeepx0.3 m3 26.00


thick)x 220m, 1m away from the pan pond
edge, to secure the HDPE Membrane from
shrinking edges. After excavation, make sure
to trap the plastic sheet in the trench by
backfilling with rubble stone and sand.

Sub Total 2- Dam Lining with HDPE Geoembranes.


3 INLET/GALLERY, SILT TRAP AND OUTLET/SPILLWAY
3.1 Construct and lay riprap stones with cement m3 40.00
mortar, mix ratio of 1:4, along the bed from
inlet to siltrap, siltrap to water pan, and from
water pan to spillway with thickness of 0.25m,
40m logn and 4m width, as directed by site
engineer.
3.2 Cast 5mm thick plain/lean concrete with mix m³ 8.00
ratio of 1:2:4, over the riprap bed from inlet to
siltrap, siltrap to water pan, and from water
pan to spillway with thickness of 0.05m, 40m
logn and 4m width, as directed by site
engineer.

3.3 Construction of rubbl stone plinth wall along m³ 12.00


the two side of inlet and out let channels with
dimension of ( 0.4m widht, 0.5m high) 60

3.4 desilt and rehabilitate the circular conrete job 1.00


intake water pump champer with diameter of
2.4m and 1.2 high.

Sub-total 3- INLET/GALLERY, SILT TRAP AND


OUTLET/SPILLWAY
4 External Works ( Fencing )
4.1 Rehabilitation and remove the old chain mesh LM 360.00
fencing by replacing new mesh 2.10m high,
and keep the 6mm angle posts to be vertically
eracted by replacing the bended broked ones.
make sure to clippe to 3 line horizontal
straining wire of barbed wire to cranked tops
of posts: Total Perimeter -360m. make sure
during installing chain mesh wire fence to be
20cm below the ground level and
approperiately backfilled.
4.2 Construct new Steel gate size 3000mm wide x item 1.00
2100mm high in two equal leaves: comprising
of 0.3cmx0.3m concrete columns casted titly
to the gate with 0.6*0.6*0.4m concrete
footing.
4.3 Provide and install Trash screen for the inlet Item 1.00
channel 2 m X 1 m. (Heavy Gauge Mesh) as
directed by site engineer.
Sub Total 4 - External works -Fencing.
5 Rehabilitation of Animal troughs ,Watchman room and elevated fiber glassed tank.

5.1 Casting Rcc Concrete for footing around the m3 2.28


animal troughs base foundation with 2m length
in all sides of 3 troughs.( 45m*2*0.05m thick)
with concrete mix ratio 1:2:4, for Y12mm@
20mm C/C. this inluding plastering for cracking
areas and applying cement slarry finish for
beds of the troughs as antiseepage control.
this will be done as directed by engineer.
5.2 supply and instal new cealing sheets of 4mm m2 25.00
thick in the watchman room.
5.3 Apply 2 coats of internal and external m2 120.00
disptempering and painting to entire building
5.4 room.
Apply anti-leage glue inside the fiber glass job 1.00
elevated tanke with dimension
of( 2.6m*2.6m*1.5m high).
5.5 Supply and Erect name board size 1.2m wide x Item 1.00
.90m erected about 2.1 m high above existing
ground level : fixed with concrete class 20 to
ground ( Note: The writing on the Name
board will be provided by Concern Worldwide
and conform to Concern's requirements)

Sub Total 5- Rehabilitation of Animal troughs ,Watchman room and


elevated fiber glassed tank.
GARAND TOTAL - HAFFIR PAN REHABILITATION
Project Name : Response to Drought Crisis in Somalia
Area / Village: Balli x.Diriye village, Odwayne district , Togdheer Region-Somaliland.

Construction of Pump-house (2.5mx3m)and Two Water kiosks (Water Points).


# Description Unit Qty Rate Amount
US$ US$
1 Pump house Construction.
Excavation of foundation trench ( 40cm wide x
1.1 50cm deep) 11m Cu.m 2.2
Construction of rubble stone foundation. All the
joints between stones filled with cement/sand
mortar (1:4) with minimum foundation height
1.2 of 40cm. Cu.m 4.4

Cast 15cm thick and 40cm wide R.C foundation


beam of 1:2:4 mix ratio @12mm bars, 6mm
1.3 stirrups with 200mm c/c. Cu.m 0.7
Sub-total 1.
2 Floor Construction
Back filling, watering and compacting the back
2.1 filled material. Cu.m 5
Laying 10cm thick lean concrete for floor fill
2.2 with ration of 1:2:4 Cu.m 0.8
Over laying Ceramic tiles ( indian 40x40cm)
with Cement Screed mortar with 1:3 mixture
of cement and sand ( cement should made in
2.3 oman) . sqm 7.5
Sub-total 2.
3 Wall Construction
Construction of 20cmx20x40cm hollow bock
walls by joined walls with mortar of 1:4. water
curing should not less than 4 days. This
3.1 including ram step with sloping 1:2. sm 33

Construction of 15cm thick continuous lintels


beam on door and window opening running
through all walls. And ring roof beam 15 cm
thick on external walls only. 1:2:4 mix ratio.
Bars at 12mm dia and stirrups 6mm @200mm
3.2 c/c. Cu.m 0.4
Sub-total 3.
4 Roof Construction.
Roofing with # 28 gauge iron corrugated
sheets and timber roof trusses c/c 2m. All roof
trusses anchored with 6mm dai. Bars casted in
the roof lintel. And all joints of roof trusses and
purloins to be tied to gether with a flat metal
strip. Dimension tie beam 2"x6", rafter 2"x4",
purloins 2"x3", king post 2"x6", Brazing 2"x3".
All timber should be single pieces with no joints
4.1 created by smaller pieces fastened together. sm 7.5

Fixing 4mm laminating ceiling board whole the


4.2 building including verandah. sm 7.5

Fasten 20cm fascia board with paints around


entire building. Joints to be attached by
4.3 wooden joint or metal strap. Including painting. Lm 11
Sub-Total 4
5 Plastering and Painting.
2 coats of minimum 12mm cement/ sand
plastering on all interior wall faces and exterior
5.1 with ratio 1:4 sm 66
2 coats of white wash and distemper on all
faces and ceiling. All interior wall surfaces to be
smoothed. Interior wall should be applied with
5.2 stucko. sm 66
Sub-Total 5.
6 Finishing.
Provide and install paneled regular steel doors
(2.1 highx0.9m width)m with their hinges and
6.1 frames. No 1

Supply and install steel windows size 1mx1 m


having 2 leafs , complete frames. The outer
6.2 frame cover should be steel box 4inch. pcs 1
Sub-total.
Total Cost of pump house.
7 Construction of Two Water points (kiosks).
Excavation of base foundation trench
7.1 (2.4x2.8x0.3m deep) Cu.m 2
Supplying and laying 250 mm approved
hardcore filling spread well rammed and
7.2 compacted Cu.m 1.7
Supplying and laying 50 mm approved lean
concrete above the hardcore, spread well and
7.3 smoothed. Cu.m 0.36
Construct a rubble massonary wall of
1.2m*1.6m and 0.55m high, with mortar mix
7.4 ratio 1:4. Cu.m 1.1
Casting 10cm thick RCC top cap above the
massonary cubicle foundation with mix ration
1:2:4, and Y 12@20cm c/c for both ways.
7.5 (1.2*1.6*0.1m) Cu.m 0.2

Casting of Vertical RCC wall above the base


water point with dimension (1.6m widht*0.7m
high* 0.2m thick), mixing ration 1:2:4,
7.6 Y12mm@20cm c/c with 6mm stirups. Cu.m 0.22
Plumping work, including fixing Gi pipe 1", 6
7.7 peeckoks, elbows, Gi tee and gate valve. job 1
Excavate Soak away pit located 4meters from
the structure. The drainage channel to be
linked with soak away pit with a 2" PVC
drainage pipe. The Soak pit to have 1m
Diameter and 1.5metres deep, filled with
7.8 Construct
Hardcore. two sun-shades roofings for the two job 1
water points. This is consisting, supplying and
eracting 8no Gi pipe post, (4no in each shade
roof) with 3m high and base dimensions of
3m*3m square in each shade. Then install
corrugated iron sheet roof with timber roof
trusses c/c 3m. All roof trusses anchored
directly with Gi posts. And all joints of roof
trusses and purloins to be tied to gether .
Dimension tie beam 2"x6", rafter 2"x4",
7.9 purloins 2"x3", king post 2"x6", Brazing 2"x3". m2 18
Sub-total of One point (kiosk.)

Sub-total of the two point(kiosks). 2

8 Water supply and transmission system.


Excavation and backfill of 180m pipeline trench
- 300mm wide and 400mm deep, from the
storage tank to the new water points (kiosks) in
8.1 village as directed by engineer. M 180
Supplying and laying Rising main 2" dia
HDPE/PPR Pn 10 pipe, including fittings. and
8.2 backfilling appropriately after instalations. m 180
construct Valve chambers measuring 0.5x0.5
m and 0.5m depth., and having lockable steel
cover door (25cm*25cm). champers will be
located on the rising main next to the pump
house, at the water points, and at the junction
of the lines to the animal water troughs, and at
next to the tank, at the outlet pipe to the
distribution lines. and then install 2" gate
8.3 Ckeck and replace if eny dameges on the other pcs 6
valves in each champer to conrol water.
Gi 2" pipe line from Dam to wate tank, from
8.4 tank to animal troughs. job 1

Sub-Total-8- Water supply system

9 Solar power and surface pump system


Grundfos Surface pump (CRIF3-5), 2HP DC &
9.1 AC, up to 100mtrs head, 3500LHP. pcs 1

9.2 Solar power panels, 400W made in UAE. pcs 6

9.3 Solar structure mounting stand. set 1

9.4 Grundfos pump switch/controler. pcs 1

9.5 Cable solar 10mm. meter 40

9.6 Cable submercible 3c-2.5mm meter 150


accessories, connectors JM4CC male and
9.7 female lum 1

Sub-Total-9- Solar power system.


Grand Total of ( pump house, water kiosks, water transmission system and solar
power)
Project Name : Response to Drought Crisis in Somalia
Area / Village: Balli x.Diriye village, Odwayne district , Togdheer Region-Somaliland.

BILL OF QUANTITIES - SUMMARY COSTS


Item Description Unit Qty Rate (USD) Amount (USD)

1 Annex-1 Dam Rehabilitations No. 1


Annex-2 construction of pumphouse,
kiosks, water trasmission lines and solar
2 power system. No. 1
GRAND TOTAL.