Zonal Work Order
Zonal Work Order
Name of work: Petty repairs, color washing, painting etc. of RRI Cabin Howrah, RPF Yard Post
Howrah, Ganghut at Pilgrim Platform, and Strengthening of Bankim setu protection guard etc. at
Howrah Station Old Complex in Zone No-01 under AEN/HQ/Howrah.
(Site) Howrah Station Old Complex
Schedule of Drawings
Survey Sheet
Authority ADRM INFRA
Allocation 04-410-32
The Contractor ARINDAM GHOSH-KOLKATA is/are hereby ordered to carry out the following
works at percentage(s), above/below/At par the Schedule of Rates of Eastern Railway Corrected
upto latest correction slips of Howrah Division under Zone Contract Agreement here-in before
referred to:
The Works herein mentioned are required to be completed on or before 30/06/2024 (Date).The
quantities provided herein are approximinate and subject to variation under Clause 42 of the
Standard General condition of Contract corrected upto latest correction slips.
Railway :Sr.DEN/HQ/HWH
(For President of india)
I agree to complete the works herin set forth on or before the date specified under the Zone
Contract Agreement herin before referred to in conformity with the drawings hereto annexed and
in accordance with the General and Special (if any ) Conditions of Contract Corrected upto latest
Correction Slips and the Standard Specification of Eastern Railway with up-to-date Correction
Slips.
I also agree to maintain such works for the period specified below from the date of
completion:
(a) Repair and maintaince work including white/color washing: three calendar months
from date of completion.
Signature(b)NotAll
Verified
new works except earth work: Six calendar months fromSignature Not Verified
date of completion.
Digitally signed by ARINDAM GHOSH Digitally signed by MUKESH KUMAR
Date: 2024.05.24 18:58:18 IST JHA RAKESH
Reason: For sanction of zonal work Date: 2024.05.30 11:33:33 IST
order Reason: For sanction of zonal work
order