GAS Testing - Fazal

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

GAS Testing PA-HR-09-020-W7451/Rev:2/Page 50

Candidate: Abdul Bari Position: HSE Supervisor Company: (MCCL) Date: 26/11/2022
3. RECORD OF COMPETENCY

General Information
Module: GAS Testing

Assessment Result
Date: 26/11/2022 Competent: Yes / No Not Yet Competent
Cross out whichever does not apply.
Assessors Sign off
This assessment was performed in accordance with the requirements of procedure N0: and its work instructions by the undersigned assessors:
Assessor 1: Khawer Ahmed
(Print Name) (Signature)
Assessor 2:
(Print Name) (Signature)
Candidate Sign off
I, the undersigned, agree that this was an objective fair assessment of my competency and that I was given an opportunity to attempt each requirement.

Signed: Date: 26/11/2022

BHP Billiton Pakistan Production Unit

You might also like