MANUFACTURER OF SCREW FLIGHT FORMING MACHINE.

GSTN: 33DIFPM1432N1Z8
ADDRESS : 33 , MEENATCHI AMMAN NAGAR , THIRUMUDIVAKKAM ,CHENNAI -600044
EMAIL : [email protected] Ph : 9566705340.

DATE: 22-08-2024
Quotation ID:S-Automatic -
MPRA0510- 40T

TO :
MR.MORESHWAR
MH.

PH: 9820295354

Subject: Quotation for Semi-Automatic Screw Auger Forming Machine.

Dear sir,
Ref: Your enquiry for semi-Automatic Screw Auger Forming Machine dated: 16/08/2024.
Thank you for showing interest in our products & contacting us. Please find our exclusive
quotation for your requirement of semi-Automatic Screw Auger Forming Machine.

S.NO DESCRIPTION SPECIFICATION


1 Over all dimension of the press 2400-900-1300 (LWH)
2 Dimension of the control unit 500-400-300 mm
3 Weight of the unit Not more than 2500 kgs
4 Operating pressure in hydraulic system 18 Mpa
5 Maximum pressure in the hydraulic system 24 Mpa
6 Nominal press force 40 Tons
7 Maximum short-term force 50 Tons
8 Power consumption 10 Kw/ 230 v
9 Power pack unit capacity 120 liter & 7.5 hp /1440
motor
10 Hydraulic pump & valve, solenoid coil Dowty , polyhydron,
11 Electrical items Siemens / L &T
12 Outer Diameter of the flight 150- 1000 mm
13 Pipe Diameter / Strip width 50 - 300 mm
14 Pitch of the flange 100 - 1000 mm .

15 Thickness of the flight 2-12 mm


MACHINE COST: 800000.00 (INR)

Press tools: As per your Requirement sizes


(Standard 10 sets).
Forming Materials: Mild Steel (2-12 mm)
Stainless Steel: (2-10 mm ).
Additional Customer requirements:
7500/set. (Press tools).
Press tools: EN08.
Molds: MS.
Control Panel: Yes (Semi-Automatic)
Power Pack unit oil: customer scope (Trail purpose only ours).

MACHINE OPERATING: Pedal & Limit Switch.

TERMS & CONDITION

GST : EXTRA (100 % PAYMENT OF THE DELIVERY)


TRANSPORT : CUSTOMER SCOPE .
DELIVERY : 6-8 WEEKS .
VALITITY : 1 MONTH.
CANCELLATION : ORDER ONCE PLACED CANNOT BE CANCELLED & ANY
REASONS THE ADVANCES PAID ARE NON REFUNDABLE.

PAYMENT: 50 % advance, 35 % after skeleton & Mechanical parts, 15 % after


trail & before dispatch.