0% found this document useful (0 votes)
37 views3 pages

Nov Dec 2023

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views3 pages

Nov Dec 2023

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Total No. of Questions : 8] SEAT No.

8
23
P6669 [Total No. of Pages : 3

ic-
[6181] - 237

tat
B.E. (Mechanical)

2s
INDUSTRIAL ENGINEERING

9:5
02 91
(2019 Pattern) (Semester - VII) (402044 D) (Elective - III)

3:3
0
31
Time : 2 ½ Hours] 7/1 13 [Max. Marks : 70
Instructions to the candidates:
0
2/2
.23 GP

1) Solve Q.1 or Q.2, Q.3 or Q.4, Q.5 or Q.6, Q.7 or Q8.


2) Figures to the right indicate full marks.
E
80

8
3) Use of electronic calculator is allowed
C

23
ic-
4) Assume suitable data if necessary.
16

tat
8.2

2s
.24

9:5
Q1) a) Define Plant Location & explain four factors which affectsplant location
91
49

selection.
3:3
[6]
30
31
01
02

b) Differentiate between Product Layout & Process Layout. [6]


2/2
GP
7/1

c) What are the objectives of material handling? [6]


CE
80

8
23
.23

OR ic-
16

tat
8.2

2s
.24

9:5

Q2) a) Define material handling. List Material Handling equipment and describe
91
49

3:3

any three of them. [9]


30
31
01
02

b) Describe material flow pattern in material handling with suitable sketches?


2/2
GP

[9]
7/1
CE
80

Q3) a) What are the different techniques of production control? [9]


.23
16
8.2
.24

P.T.O.
49
8
b) Explain the need for forecasting. [8]

23
The past data of monthly sell is as given below:

ic-
tat
Month Actual Sells

2s
l 56

9:5
2 76

02 91
3:3
3 58

0
31
4 67
7/1 13
5 75
0
6 76
2/2
.23 GP

7
E

i) If a three month moving average is used to forecast the next month’s


80

8
C

23
demand, compute the forecast of the load on the center in the 7th

ic-
month.
16

tat
ii) Compute by exponential smoothing for the 7th month. Take
8.2

2s
smoothing coefficient ( α = 0.3)
.24

9:5
91
OR
49

3:3
Q4) a) Write short notes on :
30

[8]
31

i) Assembly line balancing technique


01
02

ii) Capacity Planning


2/2
GP
7/1

b) A dealership for Skoda cars sells a particular model of the car in various
CE

months of the year shown in the table below. Estimate the forecast for the
80

8
23
month of October 2022 Using (Take period n =3) [9]
.23

i) Moving average method


ic-
16

tat
ii) Exponential smoothing method (Take exponential smoothing
8.2

2s

constant as 0.2 )
.24

9:5

iii) Comment on the results of above methods.


91
49

3:3

Month Sells of cars


30
31

Jan 2022 80
01
02

Feb 2022 65
2/2
GP

March 2022 90
7/1

April 2022 70
CE

May 2022 80
80

June 2022 100


.23

July 2022 85
16

August 2022 60
8.2

September 2022 75
.24
49

[6181] - 237 2
Q5) a) Enumerate needs of inventories?

8
[9]

23
b) M/s Patil Brother Ltd. are the manufacturers of Lamps. The following

ic-
are the details of their operation during 2022 : [9]

tat
Average monthly market demand 2,000 lamps

2s
Ordering cost` 200 per order

9:5
Inventory carrying cost 20% per annum

02 91
3:3
Cost of lamps` 1000 per lamp

0
Normal usage 100 lamps per week

31
7/1 13
Minimum usage 50 lamps per week
0
Maximum usage 200 lamps per week
2/2
.23 GP

Lead time to supply 4 - 6 weeks


Compute from the above :
E
80

8
i) Economic order quantity.
C

23
ii) Maximum level of stock.

ic-
iii) Minimum level of stock.
16

tat
iv) Re-order level of stock.
8.2

2s
OR
.24

9:5
Q6) a) The annual demand for an item is 3200 parts. The unit cost is Rs. 6 and
91
49

3:3
the inventory carrying charges are estimated as 25% per annum. If the
30
31

cost of one procurement is Rs. 150. Calculate. [9]


i) EOQ
01
02

ii) Number of orders per year


2/2
GP

iii) Time between two consecutive order


7/1

iv) The optimal cost


CE
80

8
b) Write a short note on EPR? Also explain different modules present in

23
.23

ERP. [9]
ic-
16

tat
Q7) a) Write a short note on Value Engineering.
8.2

[5]
2s

b) Enlist the objectives of job evaluation. [6]


.24

9:5

c) Explain the principle of ergonomics.


91

[6]
49

3:3

OR
30
31

Q8) a) What is Performance Appraisal? Explain Performance Appraisal


01

methods.
02

[9]
b) Explain the quantitative & qualitative methods of Job evaluation.
2/2

[8]
GP
7/1
CE


80
.23
16
8.2
.24
49

[6181] - 237 3