Total No. of Questions : 8] SEAT No.

8
23
P6669 [Total No. of Pages : 3

ic-
[6181] - 237

tat
B.E. (Mechanical)

2s
INDUSTRIAL ENGINEERING

9:5
02 91
(2019 Pattern) (Semester - VII) (402044 D) (Elective - III)

3:3
0
31
Time : 2 ½ Hours] 7/1 13 [Max. Marks : 70
Instructions to the candidates:
0
2/2
.23 GP

1) Solve Q.1 or Q.2, Q.3 or Q.4, Q.5 or Q.6, Q.7 or Q8.


2) Figures to the right indicate full marks.
E
80

8
3) Use of electronic calculator is allowed
C

23
ic-
4) Assume suitable data if necessary.
16

tat
8.2

2s
.24

9:5
Q1) a) Define Plant Location & explain four factors which affectsplant location
91
49

selection.
3:3
[6]
30
31
01
02

b) Differentiate between Product Layout & Process Layout. [6]


2/2
GP
7/1

c) What are the objectives of material handling? [6]


CE
80

8
23
.23

OR ic-
16

tat
8.2

2s
.24

9:5

Q2) a) Define material handling. List Material Handling equipment and describe
91
49

3:3

any three of them. [9]


30
31
01
02

b) Describe material flow pattern in material handling with suitable sketches?


2/2
GP

[9]
7/1
CE
80

Q3) a) What are the different techniques of production control? [9]


.23
16
8.2
.24

P.T.O.
49
8
b) Explain the need for forecasting. [8]

23
The past data of monthly sell is as given below:

ic-
tat
Month Actual Sells

2s
l 56

9:5
2 76

02 91
3:3
3 58

0
31
4 67
7/1 13
5 75
0
6 76
2/2
.23 GP

7
E

i) If a three month moving average is used to forecast the next month’s


80

8
C

23
demand, compute the forecast of the load on the center in the 7th

ic-
month.
16

tat
ii) Compute by exponential smoothing for the 7th month. Take
8.2

2s
smoothing coefficient ( α = 0.3)
.24

9:5
91
OR
49

3:3
Q4) a) Write short notes on :
30

[8]
31

i) Assembly line balancing technique


01
02

ii) Capacity Planning


2/2
GP
7/1

b) A dealership for Skoda cars sells a particular model of the car in various
CE

months of the year shown in the table below. Estimate the forecast for the
80

8
23
month of October 2022 Using (Take period n =3) [9]
.23

i) Moving average method


ic-
16

tat
ii) Exponential smoothing method (Take exponential smoothing
8.2

2s

constant as 0.2 )
.24

9:5

iii) Comment on the results of above methods.


91
49

3:3

Month Sells of cars


30
31

Jan 2022 80
01
02

Feb 2022 65
2/2
GP

March 2022 90
7/1

April 2022 70
CE

May 2022 80
80

June 2022 100


.23

July 2022 85
16

August 2022 60
8.2

September 2022 75
.24
49

[6181] - 237 2
Q5) a) Enumerate needs of inventories?

8
[9]

23
b) M/s Patil Brother Ltd. are the manufacturers of Lamps. The following

ic-
are the details of their operation during 2022 : [9]

tat
Average monthly market demand 2,000 lamps

2s
Ordering cost` 200 per order

9:5
Inventory carrying cost 20% per annum

02 91
3:3
Cost of lamps` 1000 per lamp

0
Normal usage 100 lamps per week

31
7/1 13
Minimum usage 50 lamps per week
0
Maximum usage 200 lamps per week
2/2
.23 GP

Lead time to supply 4 - 6 weeks


Compute from the above :
E
80

8
i) Economic order quantity.
C

23
ii) Maximum level of stock.

ic-
iii) Minimum level of stock.
16

tat
iv) Re-order level of stock.
8.2

2s
OR
.24

9:5
Q6) a) The annual demand for an item is 3200 parts. The unit cost is Rs. 6 and
91
49

3:3
the inventory carrying charges are estimated as 25% per annum. If the
30
31

cost of one procurement is Rs. 150. Calculate. [9]


i) EOQ
01
02

ii) Number of orders per year


2/2
GP

iii) Time between two consecutive order


7/1

iv) The optimal cost


CE
80

8
b) Write a short note on EPR? Also explain different modules present in

23
.23

ERP. [9]
ic-
16

tat
Q7) a) Write a short note on Value Engineering.
8.2

[5]
2s

b) Enlist the objectives of job evaluation. [6]


.24

9:5

c) Explain the principle of ergonomics.


91

[6]
49

3:3

OR
30
31

Q8) a) What is Performance Appraisal? Explain Performance Appraisal


01

methods.
02

[9]
b) Explain the quantitative & qualitative methods of Job evaluation.
2/2

[8]
GP
7/1
CE


80
.23
16
8.2
.24
49

[6181] - 237 3