1. As a result of the pandemic, a developer's office building has lost nearly 50% of its tenants. The management hired an
architect to come up with schemes to appeal to a different tenant demographic and increase building occupancy. What
service is the architect rendering?
2. All of the following are part of the scope of the full-time supervision service except for:
4.
SPP Document 203 contains the standards for:
6. The detailed planning and design to control sound transmission for compatibility with the architectural design concept
is
8. The detailed planning and design of the indoor areas of any proposed building, including retrofit, renovation,
rehabilitation or expansion work, including the architectural laying out of all building engineering systems
c) Contractor d) Owner
10. The orderly arrangement within a piece of land on which vertical structures such as buildings, monuments and the
like, as well as horizontal developments such as rights-of-way, open spaces, and activity spaces are to be proposed
11. Which of the following is not part of the scope of services for construction management?
12. Which SPP Document covers services that deal with specific expertise for the further enhancement of the
architectural interior and exterior components of a project?
13. In this service, the architect prescribes space plans, stacking diagrams/sections and computations of areas for the
different activities and spaces to be integrated in a building project.
a) Producing and coordinating the additional activities b) Preparation of the drawings and specifications for
necessary for promotional activities in order to develop acoustic design and treatment, sound control and
and generate financial support for and acceptance of reinforcement, sound absorption, reflectance,
the project from governing agencies or from the insulation, etc.
general public
15. An architect who is also a landscape architect is especially suited for which specialized architectural service?
16. Construction in a building involving changes in the materials used, partitioning, locations/sizes of openings, structural
parts, existing utilities and equipment without increasing the overall area.
c) Alteration d) Redecoration
17. The transfer of buildings or portions thereof from an original location to another, either within the same lot or to a
different one.
a) Moving b) Evacuation
18. Any physical change made on a building/ structure to increase its value, utility and/ or to improve its aesthetic quality
19. This term refers to any new construction which increases the height or area of an existing building.
a) Conversion b) Alteration
c) Addition d) Renovation
25. Upon moving in to your new condominium building, you discovered that your friend who is an RLA works in your
building and collects condo dues from the residents. Your friend is probably rendering
26. The orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments
and the like, as well as horizontal developments like RROWs are going to be built
27. For cases where the client requests an architect to do work that will require his personal time, what is recommended
to be charged to the client?
28. When there is a continuing relationship with the owner involving a series of projects, which method of compensation
is recommended?
29. In the multiple of direct personnel expenses, what is added to the “Fee” to get the total cost charged to the client?
a) 1.5-2.5 b) 1.0-2.0
c) 3.5-5.0 d) 5.0-7.5
31. When construction is suspended for a period of 8 months, what happens to the architect’s fee for the remaining
works?
a) It is withheld by the owner until completion of the b) Nothing. It stays the same
project
a) All of these are not part of the PCC b) Cost of the air-conditioning system
35. This planning service places heavy emphasis on the non-physical and non-engineering components of the master
development plan
10. d) Physical Planning 11. b) Building and Facilities 12. d) SPP Doc 203
administration
13. b) Architectural Interiors 14. a) Producing and coordinating 15. d) Site development planning
the additional activities
necessary for promotional
activities in order to develop
and generate financial support
for and acceptance of the
project from governing
agencies or from the general
public
25. d) Post-Construction Services 26. d) Physical Planning 27. b) All of the Above
31. d) It is doubled 32. c) Net Amount 33. d) Cost of acquiring the lot