SPP DOC 203 205 - Quizizz

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Worksheets Name

SPP DOC 203-205


Class
Total questions: 35
Worksheet time: 18mins
Date
Instructor name: JOHANAH MICAH MARCOS

1. As a result of the pandemic, a developer's office building has lost nearly 50% of its tenants. The management hired an
architect to come up with schemes to appeal to a different tenant demographic and increase building occupancy. What
service is the architect rendering?

a) A specialized architectural service b) Both C and D

c) A specialized allied service d) A post-construction service

2. All of the following are part of the scope of the full-time supervision service except for:

a) Evaluation of construction work b) Cost and time control

c) Preparation of daily inspection reports d) Quality Control

3. SPP Document 205 contains the standards for:

a) Regular design services b) Specialized architectural services

c) Post-construction services d) Specialized allied services

4.
SPP Document 203 contains the standards for:

a) Regular design services b) Specialized architectural services

c) Specialized allied services d) Post-design services

5. The construction management service is covered by which SPP Document?

a) SPP 202 b) SPP 204a

c) SPP 204b d) Both B and C

6. The detailed planning and design to control sound transmission for compatibility with the architectural design concept
is

a) Predesign service b) A specialized architectural services

c) Post-construction service d) A specialized allied service


7. Business development or business management includes billing the tenants for rentals and utilities (electricity, water,
telephone, cable, gas and other/ related dues). Which SPP Document covers this service?

a) SPP DOC 204b b) SPP DOC 203

c) SPP DOC 205 d) SPP DOC 204a

8. The detailed planning and design of the indoor areas of any proposed building, including retrofit, renovation,
rehabilitation or expansion work, including the architectural laying out of all building engineering systems

a) Regular design service b) Space Planning

c) Architectural Interiors d) Space Management studies

9. Who normally recommends the construction supervision group (CSG)?

a) Project Manager b) Architect

c) Contractor d) Owner

10. The orderly arrangement within a piece of land on which vertical structures such as buildings, monuments and the
like, as well as horizontal developments such as rights-of-way, open spaces, and activity spaces are to be proposed

a) Comprehensive Planning b) Site Planning

c) Planned unit development d) Physical Planning

11. Which of the following is not part of the scope of services for construction management?

a) Filing of Documents b) Building and Facilities administration

c) Quality control d) Evaluation of construction work

12. Which SPP Document covers services that deal with specific expertise for the further enhancement of the
architectural interior and exterior components of a project?

a) SPP Doc 202 b) SPP Doc 201

c) SPP 205 d) SPP Doc 203

13. In this service, the architect prescribes space plans, stacking diagrams/sections and computations of areas for the
different activities and spaces to be integrated in a building project.

a) Architectural Programming b) Architectural Interiors

c) Space Planning d) Regular Design Service


14. Which is not a specialized architectural service?

a) Producing and coordinating the additional activities b) Preparation of the drawings and specifications for
necessary for promotional activities in order to develop acoustic design and treatment, sound control and
and generate financial support for and acceptance of reinforcement, sound absorption, reflectance,
the project from governing agencies or from the insulation, etc.
general public

15. An architect who is also a landscape architect is especially suited for which specialized architectural service?

a) Site selection and analysis b) Site and Physical Planning

c) Comprehensive development planning d) Site development planning

16. Construction in a building involving changes in the materials used, partitioning, locations/sizes of openings, structural
parts, existing utilities and equipment without increasing the overall area.

a) Slum Upgrading b) Renovation

c) Alteration d) Redecoration

17. The transfer of buildings or portions thereof from an original location to another, either within the same lot or to a
different one.

a) Moving b) Evacuation

c) Disaster Displacement d) Reassembly

18. Any physical change made on a building/ structure to increase its value, utility and/ or to improve its aesthetic quality

a) Interior Design b) Architectural Interiors

c) Renovation d) Slum upgrading

19. This term refers to any new construction which increases the height or area of an existing building.

a) Conversion b) Alteration

c) Addition d) Renovation

20. Which is not a scope of services on SPP Doc 204 A

a) Filing of Documents b) Quality control

c) Building maintenance d) Preparation of Daily Inspection Reports

21. Which is not a scope of services on SPP Doc 205

a) Grounds and Landscaping Supervision b) Business Development and Management

c) Building Equipment Maintenance d) Evaluation of Construction Work


22. Which is not an architect’s duty when he functions as a construction manager?

a) Keeping of records for the project b) Design Revisions

c) Cost and time control d) Quality control of work (QC)

23. Forensic architecture is a

a) Specialized allied servicesd b) Specialized predesign service

c) Regular design services d) Specialized architectural service

24. Which SPP document covers Construction Management (CM) services?

a) SPP 203 b) SPP 204B

c) SPP 204A d) SPP 205

25. Upon moving in to your new condominium building, you discovered that your friend who is an RLA works in your
building and collects condo dues from the residents. Your friend is probably rendering

a) Specialized Allied Services b) Comprehensive Architectural services

c) Specialized Architectural Services d) Post-Construction Services

26. The orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments
and the like, as well as horizontal developments like RROWs are going to be built

a) Master Development Panning b) Site Planning

c) Comprehensive Planning d) Physical Planning

27. For cases where the client requests an architect to do work that will require his personal time, what is recommended
to be charged to the client?

a) Honorarium b) All of the Above

c) Reimbursible Expenses d) Per Diem

28. When there is a continuing relationship with the owner involving a series of projects, which method of compensation
is recommended?

a) Honorarium b) Professional Fee plus Expenses

c) Lump Sum d) Multiple of Direct personnel expense

29. In the multiple of direct personnel expenses, what is added to the “Fee” to get the total cost charged to the client?

a) Reimbursible b) The consultant's fee

c) Healthcard d) Income taxes


30. For the multiple of direct personnel expense method of compensation, what is the multiplier recommended by the
SPP?

a) 1.5-2.5 b) 1.0-2.0

c) 3.5-5.0 d) 5.0-7.5

31. When construction is suspended for a period of 8 months, what happens to the architect’s fee for the remaining
works?

a) It is withheld by the owner until completion of the b) Nothing. It stays the same
project

c) It is withheld by the owner until the issues on-site are d) It is doubled


resolved

32. The architect’s fee is a

a) Immune to all forms of taxes b) Incomplete amount

c) Net Amount d) Both A and B

33. Which is not part of the PCC?

a) All of these are not part of the PCC b) Cost of the air-conditioning system

c) Cost of electrical fixtures d) Cost of acquiring the lot

34. Which is the largest amount?

a) Both A and B b) PCC

c) The Architect's Fee d) PDC

35. This planning service places heavy emphasis on the non-physical and non-engineering components of the master
development plan

a) Site Planning b) Comprehensive Development Planning

c) Master Planning d) Physical Planning


Answer Keys

1. d) A post-construction service 2. b) Cost and time control 3. c) Post-construction services

4. b) Specialized architectural 5. c) SPP 204b 6. b) A specialized architectural


services services

7. c) SPP DOC 205 8. c) Architectural Interiors 9. b) Architect

10. d) Physical Planning 11. b) Building and Facilities 12. d) SPP Doc 203
administration

13. b) Architectural Interiors 14. a) Producing and coordinating 15. d) Site development planning
the additional activities
necessary for promotional
activities in order to develop
and generate financial support
for and acceptance of the
project from governing
agencies or from the general
public

16. c) Alteration 17. a) Moving 18. c) Renovation

19. c) Addition 20. c) Building maintenance 21. d) Evaluation of Construction


Work

22. b) Design Revisions 23. d) Specialized architectural 24. b) SPP 204B


service

25. d) Post-Construction Services 26. d) Physical Planning 27. b) All of the Above

28. b) Professional Fee plus 29. a) Reimbursible 30. a) 1.5-2.5


Expenses

31. d) It is doubled 32. c) Net Amount 33. d) Cost of acquiring the lot

34. d) PDC 35. b) Comprehensive Development


Planning

You might also like