PROJECT TITLE:
SCHEDULE OF GIRDERS SCHEDULE OF GIRDERS
FLOOR
SIZE LONGITUDINAL REINFORCEMENTS STIRRUPS & HOOPS (SPACING IN MM)
FLOOR
SIZE LONGITUDINAL REINFORCEMENTS STIRRUPS & HOOPS (SPACING IN MM)
EVO CITY RETAIL
A BEAM BAR WEB REMARKS BEAM BAR WEB REMARKS A
LEVEL MARK
WIDTH DEPTH
Ø
LOCATION DISC. CONT. CONT. DISC.
LEFT LEFT MIDSPAN RIGHT RIGHT LEFT MIDSPAN RIGHT
BARS LEVEL MARK
WIDTH DEPTH
Ø
LOCATION DISC. CONT. CONT. DISC.
LEFT LEFT MIDSPAN RIGHT RIGHT LEFT MIDSPAN RIGHT
BARS
PHASE 2
LOCATION: EVO CITY, BRGY. TABON III, CENTENNIAL RD., KAWIT, CAVITE
TOP TOP
OWNER/DEVELOPER:
BOT. BOT.
B TOP TOP B
Ayala Land, Inc.
BOT. BOT. TOWER ONE & EXCHANGE PLAZA, AYALA TRIANGLE
AYALA AVENUE, MAKATI CITY, PHILIPPINES

TOP TOP
CONTRACTOR:
BOT. BOT.
C C
TOP TOP
BOT. BOT.
Makati Development Corporation

TOP TOP MDC CORPORATE CENTER, 54 RADIAN STREET


ARCA SOUTH ESTATE, WESTERN BICUTAN, TAGUIG CITY 1630
BOT. BOT.
D DESIGNERS OF RECORD D
TOP TOP
ARCHITECTURAL:
BOT. BOT.
TOP TOP
PEDRO H. PIMENTEL
BOT. BOT.
E ARCHITECT E
TOP TOP PRC NO.:
T.I.N.:
0004654
101-716-478-000
PTR NO.
PLACE ISSUED:
10073989
MAKATI CITY
DATE ISSUED: 02 JANUARY 2024
BOT. BOT. STRUCTURAL:
TOP TOP

F BOT. BOT. F
REMUND BAQUIRAN
TOP TOP STRUCTURAL ENGINEER
PRC NO.: 119853 PTR NO. 4610682
BOT. BOT. T.I.N.: 272-524-328-000 PLACE ISSUED:
DATE ISSUED:
MUNTINLUPA CITY
23 JANUARY 2024

MECHANICAL:
TOP TOP
G BOT. BOT. G
TOP TOP NESTOR B. SOLIS
PROFESSIONAL MECHANICAL ENGINEER
BOT. BOT. PRC NO.: 0005357 PTR NO. 6170437
T.I.N.: 210-225-859-000 PLACE ISSUED: TAGUIG CITY
TOP TOP DATE ISSUED: 20 JANUARY 2024

ELECTRICAL:
H BOT. BOT. H

TOP TOP
GROUND FLOOR LEVEL (fc'= 6000psi)

GROUND FLOOR LEVEL (fc'= 6000psi)


BOT. BOT. MARK EDWARD G. MENDOZA
PROFESSIONAL ELECTRICAL ENGINEER
TOP TOP PRC NO.: 0003478 PTR NO. 6172447
T.I.N.: 228-316-511-000 PLACE ISSUED: TAGUIG CITY
I DATE ISSUED: 20 JANUARY 2024 I
BOT. BOT. PLUMBING & SANITARY:
TOP TOP
BOT. BOT.
MARK JERSON R. FLORA
TOP TOP SANITARY ENGINEER / MASTER PLUMBER
J PRC NO.: 0002274 PTR NO. 2002620
J
BOT. BOT. T.I.N.: 234-094-943-000 PLACE ISSUED: BINAN CITY, LAGUNA
DATE ISSUED: 02 JANUARY 2024

TOP TOP FIRE PROTECTION:

BOT. BOT.

K TOP TOP WILFREDO N. MADRONIO K


BOT. BOT. PROFESSIONAL MECHANICAL ENGINEER
PRC NO.: 0004882 PTR NO. 00234083
210-674-777 STO. TOMAS, BATANGAS
TOP TOP
T.I.N.: PLACE ISSUED:
DATE ISSUED: 02 JANUARY 2024

ELECTRONICS
BOT. BOT.
L TOP TOP L
BOT. BOT. MICHAEL VINCENT A. ALCANTARA
PROFESSIONAL ELECTRONICS ENGINEER
TOP TOP PRC NO.: 0000964 PTR NO. 9918679
T.I.N.: 308-574-994-000 PLACE ISSUED: CAVITE CITY

BOT. BOT. DATE ISSUED: 02 JANUARY 2024

REVISIONS
M TOP TOP M
NO. DATE DESCRIPTION

BOT. BOT.
TOP TOP
BOT. BOT.
N N
TOP TOP
BOT. BOT. SHEET CONTENTS:
TOP TOP
BOT. BOT.
O SCHEDULE OF GIRDERS O
TOP TOP
BOT. BOT.
TOP TOP PURPOSE OF ISSUANCE:
BOT. BOT. STRUCTURAL CONSTRUCTION BULLETIN 02
P (AUGUST 9, 2024) P
TOP TOP
R.A. 9266 SEC. 33
BOT. BOT. DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED,
STAMPED OR SEALED, AS INTRUMENTS OF SERVICE ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE

TOP TOP MADE IS EXECUTED OR NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE
OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR
OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE,

BOT. BOT.
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHOR OF SAID
Q DOCUMENTS. ALL ARCHITECTS SHALL INCORPORATE THIS PROVISION IN ALL
CONTRACT DOCUMENTS AND OTHER INSTRUMENTS OF SERVICE.
Q
TOP TOP
PROJECT NO: PAPER SIZE:

BOT. BOT. FILENAME: SHEET NO.:

PROJ. MANAGED BY:


TOP TOP
DESIGN DEV'T:
R BOT. BOT. DRAWN BY:
S601G R
DATE DRAWN:
DATE PRINTED: SCALE: AS SHOWN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

You might also like