100% found this document useful (1 vote)
116 views2 pages

Hot Work Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
116 views2 pages

Hot Work Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DODSAL ENGINEERING & CONSTRUCTION FORMAT NO

REV NO. 0
PTE LTD
HOT WORK CHECKLIST DATE
PAGE NO Page 1 of 2

PROJECT NAME TRAIN 3 OF WARA PRESSURE MAINTENANCE PROJECT (NSK) PROJECT-EF/1945


PURPOSE WELDING/CUTTING WORK DATE:
SITE ENGINEER / AREA/ LOCATION:
FOREMEN

GENERAL REQUIREMENTS YES NO N/A NOTES


1. Is there ANY flammable or combustible substance evident
in the containers, piping systems or equipment on which
HOT WORK is being performed?

2. Fire extinguisher placed in the immediate work area.

3. Has all combustible material located within 30 feet of the


hot work area been removed? If possible or a fire resistant
shield employed?

4. Is necessary to deactivate smoke/heat/fire alarm?

5. Security informed that the system is about to be


compromised

6. Proper notification been given to building occupants for


alarm de-activation

7. The work area is properly ventilated

8. Have systems been re-activated (daily, if possible) and


notify Security and the building administrator that the
system is back on line.
9. Inspect the job site for indications of ignition

10. Maintain a fire watch for at least one hour if possible

11. Is work permit available?

12. Is Risk Assessment & control measures are made


available?

OTHER REQUIREMENTS / PRECAUTIONS

FOREMAN / SUPERVISOR NAME & SIGNATURE DATE:


OF

INSPECTED BY NAME & SIGNATURE DATE:


HSE Officer OF DESIGNATION
PERSON
DODSAL ENGINEERING & CONSTRUCTION FORMAT NO
REV NO. 0
PTE LTD
HOT WORK CHECKLIST DATE
PAGE NO Page 2 of 2

FOREMAN / SUPERVISOR NAME & SIGNATURE DATE:


OF

INSPECTED BY NAME & SIGNATURE DATE:


HSE Officer OF DESIGNATION

..
PERSON

You might also like