0% found this document useful (0 votes)
28 views13 pages

Industrial Training Log Book

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views13 pages

Industrial Training Log Book

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Industrial Training Log Book

Week 1: Orientation and Basics of Networking

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Orientation and introduction to


BSNL

TUE Introduction to networking


concepts

WED Practical session on IP addressing


and subnetting

THU Overview of network devices

FRI Initial hands-on network setup

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 2: Network Configuration

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Advanced network configuration

TUE Configuring routers and switches

WED Network testing and validation

THU Documentation of network


configurations

FRI Review and feedback

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 3: Network Devices

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Detailed study of routers

TUE Detailed study of switches

WED Configuring VLANs on switches

THU Implementing security measures


on devices

FRI Review and testing

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 4: Network Troubleshooting

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Common network issues and


troubleshooting methods

TUE Practical troubleshooting scenarios

WED Identifying and resolving


connectivity issues

THU Addressing slow network


performance

FRI Review and testing

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 5: Network Security

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to network


security threats

TUE Configuring firewall rules

WED Setting up secure VPNs

THU Implementing encryption


protocols

FRI Conducting security audits

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 6: Hands-on Projects

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Project planning and task


allocation

TUE Setting up a Local Area Network


(LAN)

WED Configuring routers and switches


for the project

THU Testing and validating project


network

FRI Project documentation and review

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 7: Advanced Network Configurations

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Advanced IP addressing and


subnetting

TUE Configuring advanced routing


protocols

WED Implementing Quality of Service


(QoS) settings

THU Monitoring and managing


network traffic

FRI Reviewing advanced


configurations

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 8: Final Assessments and Evaluations

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Reviewing all configurations and


setups

TUE Conducting final performance


tests

WED Evaluating network security


measures

THU Preparing final project reports

FRI Receiving feedback and


constructive critique

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________Certainly! Let's continue the log book
Week 9: Project Work and Real-Time Applications

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to real-time project

TUE Planning and designing network


solutions

WED Implementation of project


network setup

THU Testing and troubleshooting


project network

FRI Documentation of project findings


and results

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 10: Advanced Troubleshooting and Performance Optimization

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Advanced troubleshooting


techniques

TUE Performance optimization


strategies

WED Hands-on troubleshooting


scenarios

THU Network performance analysis

FRI Review and feedback

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 11: Network Security Implementations

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Advanced network security


measures

TUE Implementing Intrusion Detection


Systems (IDS)

WED Configuring Intrusion Prevention


Systems (IPS)

THU Security policy implementation

FRI Security audits and assessments

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 12: Final Review and Presentation

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Final review of all projects and


configurations

TUE Preparing presentation materials

WED Presenting final project

THU Receiving feedback and


evaluations

FRI Final documentation and report


submission

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 13: Advanced Network Design

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to advanced network


design concepts

TUE Designing scalable network


architectures

WED Implementing redundancy and


failover mechanisms

THU Designing secure network


topologies

FRI Review and feedback on network


designs

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 14: Network Management and Monitoring

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to network


management tools

TUE Setting up network monitoring


systems

WED Configuring SNMP and logging

THU Analyzing network performance


data

FRI Review and optimization of


monitoring setups

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 15: Emerging Technologies in Networking

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to emerging


networking technologies

TUE Exploring software-defined


networking (SDN)

WED Understanding network function


virtualization (NFV)

THU Implementing IoT and network


automation

FRI Review and practical sessions on


emerging tech

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 16: Final Project and Documentation

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Planning and initiating final


project

TUE Implementing final project


network setup

WED Testing and validating final


project

THU Preparing final project


documentation

FRI Final presentation and


evaluation

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 17: Cloud Networking

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to cloud networking

TUE Setting up virtual networks in cloud


environments

WED Managing cloud-based network


services

THU Implementing cloud security


measures

FRI Review and feedback on cloud


network setups

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 18: Automation and Scripting

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to network automation

TUE Writing scripts for automated


network configurations

WED Implementing automation tools

THU Testing and validating automation


scripts

FRI Review and optimization of


automation processes

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 19: Final Integration and Testing

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Integrating all network


components

TUE Comprehensive testing of


network setups

WED Addressing integration issues

THU Finalizing network configurations

FRI Review and documentation

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 20: Reflection and Future Planning

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Reflecting on training experiences

TUE Identifying areas for improvement


and future goals

WED Developing a professional growth


plan

THU Preparing for industry certifications

FRI Final review and feedback session

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 21: Network Documentation and Standards

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to network


documentation standards

TUE Creating network diagrams and


documentation

WED Implementing documentation best


practices

THU Reviewing and updating existing


network documentation

FRI Final review and feedback on


documentation

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 22: Network Integration and Testing

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Integrating various network


components

TUE Testing integrated network setups

WED Troubleshooting integration issues

THU Optimizing network performance


post-integration

FRI Review and documentation

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 23: Network Scalability and Performance

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Understanding network


scalability principles

TUE Designing scalable network


architectures

WED Implementing scalability


measures

THU Performance testing of scalable


networks

FRI Review and optimization for


scalability

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

Week 24: Emerging Network Technologies

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to emerging network


technologies

TUE Exploring blockchain technology in


networking

WED Understanding the impact of 5G on


networking

THU Implementing edge computing and


IoT networks

FRI Review and practical applications of


emerging tech

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________
Week 25: Advanced Security Techniques

DAY DAT SHIFT/HOURS WORK DONE (ACTIVITY) SIGNATURE OF THE


E ENGAGED STUDENT

MON Introduction to advanced security


techniques

TUE Configuring multi-factor


authentication (MFA)

WED Implementing zero trust security


models

THU Advanced threat detection and


response

FRI Review and feedback on security


implementations

SAT

SUN

Checked by: ________________ Counter Signed by: ______________ Name:


____________________ Name of Staff: __________________

You might also like