E N S W: Road Stilt Floor Plan B.U.A-2294 SFT Road Typical Floor Plan B.U.A - 2294 SFT TOTAL B.U.A - 9176 SFT F.A.R. - 2.44
E N S W: Road Stilt Floor Plan B.U.A-2294 SFT Road Typical Floor Plan B.U.A - 2294 SFT TOTAL B.U.A - 9176 SFT F.A.R. - 2.44
50' 50'
6'-6" 6'-6" 37' 6'-6" 6'-6" 37' 6'-6" E W
6'-6"
N
M.BED ROOM
11'0"x13'6"
26'-8"
DRIVE WAY
DRAWING/DINING
11'0"X22'3" AUTHORITY:-
TOILET 3 BHK
7'0"x4'6" B.U.A.-1037 SFT
TOILET
7'0"x4'6"
PROJECT:-
KITCHEN
11'0"x7'
BED ROOM RESIDENTIAL APPARTMENT
12'6"x10'0"
D
C.B.
STAIR CASE
STAIR CASE
TITLE:-
62'
62'
75'
75'
11'X7'
11'X7'
LIFT LIFT LOBBY
5'0"x7'0" 5'0"x7'0" 11'5"X7'0"
FLOOR PLAN
C.B.
D
M.BED ROOM
11'0"x13'6"
DRAWING/DINING
DRIVE WAY
11'0"X22'3"
3 BHK
26'-8" TOILET
7'0"x4'6" B.U.A.-1037 SFT
TOILET
STRUCTURAL CONSULTANT:-
7'0"x4'6"
APS DESIGN INFRA PVT.LTD
DRESS #B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
Pin- 751003, 7 0 0 8 7 7 7 9 1 3
[email protected]
KITCHEN www.apsdesigninfra.com
11'0"x7'
BED ROOM STATUS: ISSUED FOR CONSTRUCTION
W.M.
12'6"x10'6"
SCALE
4' WIDE BALCONY DATE DRAWN BY: DESIGNED BY:
NTS
DS NO.:
6'-6"
6'-6"
AGENCY
ROAD ROAD
S
SPACE FOR STAMPING & SIGNATURE :
6'-6"
N
M.BED ROOM
11'0"x13'6"
26'-8"
DRIVE WAY
DRAWING/DINING
11'0"X22'3" AUTHORITY:-
TOILET 3 BHK
7'0"x4'6" B.U.A.-1037 SFT
TOILET
7'0"x4'6"
PROJECT:-
KITCHEN
11'0"x7'
BED ROOM RESIDENTIAL APPARTMENT
12'6"x10'0"
D
STAIR CASE
STAIR CASE
TITLE:-
62'
62'
75'
75'
11'X7'
11'X7'
LIFT LIFT LOBBY
5'0"x7'0" 5'0"x7'0" 11'5"X7'0"
FLOOR PLAN
D
M.BED ROOM
11'0"x13'6"
DRAWING/DINING
DRIVE WAY
11'0"X22'3"
3 BHK
26'-8" TOILET
7'0"x4'6" B.U.A.-1037 SFT
TOILET
STRUCTURAL CONSULTANT:-
7'0"x4'6"
APS DESIGN INFRA PVT.LTD
DRESS #B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
Pin- 751003, 7 0 0 8 7 7 7 9 1 3
[email protected]
KITCHEN www.apsdesigninfra.com
11'0"x7'
BED ROOM STATUS: ISSUED FOR CONSTRUCTION
W.M.
12'6"x10'6"
SCALE
4' WIDE BALCONY DATE DRAWN BY: DESIGNED BY:
NTS
DS NO.:
6'-6"
6'-6"
AGENCY
ROAD ROAD
S
SPACE FOR STAMPING & SIGNATURE :
A B C D E
D
TIES#8@6"C/C
3 1
1 1 12 2 1
2
3 3
CC
LICE
≥
4 4
1 11 3 1
TIES#8@8"C/C
C3 C3 C3 C2
MANDATORY 135° HOOK DETAIL
IN COLUMN / BEAM STIRRUPS DETAIL OF HOOKS
MAIN REINF..
14
14
TIES#8@6"C/C
1
32
2
BEAM.
1
FLOOR LVL.
NOTE AU ORI Y
D
2 C 2
2 2
2
2D 2D
Y
1
2 32
C4 C3
1
33 112
O
C3 C4 I
3 3 34
TYP DETAILS OF TIES
SPACING IN COLS.
RO EC
1
2
1
RE IDEN IAL BUILDIN
1
C I 4 2
1
4
4
I LE
4 1 1 C3 C4 C3
4 4 4
1
22
22 C1 22 C1 3
A C STANDARD DETAILS of COLUMN PLAN& R/F DETAILS
1
2
4 EN INEER INC AR E
1
C1 C1 1
1 1 C4 22 C3
2 C3 2
COLUMN SCHEDULE ER U AN
COL. NOS.
C1 C2 RUC URAL CON UL AN
1
2
TERRACE/MUMTY LVL.
14
(1) a a (1)
SIZE Baramunda,Bhubaneswar,
a a
(2) (2) Pin- 751003,
FOUNDATION TO
PEDESTAL 16"X21" 16"X24" 7008777913
a a
SIZE a a [email protected]
1
2
www.apsdesigninfra.com
M25 M25
MIX a a a a
1
4
C3 C2 MAIN 6-Ø16(a) 6-Ø16(a)
REINF.
4 C2 C4
STRPS. Ø8-@6"C/C &Ø8-@8"C/C Ø8-@6"C/C &Ø8-@8"C/C
1 SET OF 2 STRPS. 1 SET OF 2 STRPS.
A U I UED OR CON RUC ION
1
2
CALE
COLUMN SCHEDULE N
DA E DRA N BY DE I NED BY
1
D NO
4
COL. NOS.
C3 C4 STR-01
1 1 2 23 ER EENA ER U AN
4 4 C2
COLUMN
A ENCY
10"X18" 10"X18"
TERRACE/MUMTY LVL.
11 C2 3 SIZE
C2 C2 4 a a a (1) (2) b a b (1) (3)
(2)
FOUNDATION TO
A B C D E
BOUNDARY LINE COLUMN CENTER LINE
A B D E LIN BEA
LIN BEA
A O N IN IRRU
DRA IN
2'-0"
8#12
F2 F3 F2 F1
L L
IRRU
L
OLU N
3" 3"
A O N IN
EDE AL
5'-0"
ABLE EEL
2'-0"
AU ORI Y
B DOUBLE ALLY
A ER R
F4 F3
4" 4"
6" 6"
F3 F4 AND
RO E
B
RE IDEN IAL BUILDIN
E ION Y Y
I LE
A ER R
F5 F4 F3
LI I FOUNDATION DETAILS
L L
Y Y
L
OLU N
EN INEER IN AR E
EDE AL
F5 F3 ER U AN
CF1 F4
RU URAL ON UL AN
APS DESIGN INFRA PVT.LTD
#B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
Pin- 751003,
7008777913
B [email protected]
www.apsdesigninfra.com
Y I AL OO IN
F4 F3
F4 F4 OO IN L B BO O REIN EEL O REIN EEL A U I UED OR ON RU ION
ALE
B B DA E DRA N BY DE I NED BY
N
D NO
B B STR-02
ER EENA ER U AN
A EN Y
B B
F1 F2 F2 F1
B B
B B
B B A E OR A IN I NA URE
BOUNDARY LINE
A B D E
FOUNDATION PLAN
FOOTING L B H BOTTOM REIN. STEEL TOP REIN. STEEL
LIFT DETAILS
AUTHORITY:-
GROUND ROOF
RESIDENTIAL BUILDING
10" BRICK
WALL
TITLE:-
STRUCTURAL CONSULTANT:-
CRYSTALLINE
H
10" THK
SAND FILLING
#12mm@6"C/C #12mm@6"C/C
BOTH WAYS R.C.C WALL BOTH WAYS
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
#8mm@6" MM C/C BOTH DWG NO.:
16-10-2023 ER. HEENA ER. P.K. PUHAN
AS PER DETAIL
4"
6" THK P.C.C. 1:2:4
6" THK SAND FILLING
AUTHORITY:-
10"
PROJECT:-
6"
RESIDENTIAL BUILDING
TITLE:-
6"
STAIRCASE DETAIL
6"
3'- ENGINEER INCHARGE:-
6"
#B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
Pin- 751003,
7008777913
[email protected]
"
3'6
www.apsdesigninfra.com
10"
6"
16"
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
DWG NO.:
16-10-2023 ER. HEENA ER. P.K. PUHAN
AGENCY
#12 -2 NOS TOP
8#-@4" C/C
10" 8#-@8" C/C
SPACE FOR STAMPING & SIGNATURE :
4" 3.5"
8#-@4" C/C
#12 -3 NOS BOT
1'-6"
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
13'-6"
15'-5"
PB1(10"X16") PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
11'-6"
9'-7"
BST1
AUTHORITY:-
PB1(10"X16") PB1(10"X16") PB1(10"X16") (S1)1000 S2 (S1)1000 (S1)1000 S2
6'-3"
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
LIFT L1 L2
7'
5'0"x7'0" STAIRCASE
PROJECT:-
PB1(10"X16")
PB1(10"X16") PB1(10"X16")
TYPICAL LONGITUDINAL SECTION OF PLINTH BEAM RESIDENTIAL BUILDING
TITLE:-
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
13'-6"
14'-11"
1'-4"
1'-4"
ENGINEER INCHARGE:-
PB1(10"X16") PB1(10"X16")
PB1(10"X16") 10'-7"
11' ER. P.K. PUHAN
12'-1"
STRUCTURAL CONSULTANT:-
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
PB1(10"X16")
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
DWG NO.:
16-10-2023 ER. HEENA ER. P.K. PUHAN
STR-03
BEAM STEEL
BEAM STIRRUPS REMARK
BEAM NO BEAM SIZE AT BOTTOM AT TOP
SPACE FOR STAMPING & SIGNATURE :
PB1 10"X16" #16-3NOS. #16-3NOS. ------ #8@6"C/C #8@8"C/C LVL. AS PER ARCHITECTURE
10" 10"
B3(10"X18") B3(10"X18") B3(10"X18") 3#16 3#16 10" 10"
12'-1" 11' 10'-7" 3#16+2#12 3#16
3'-2"
1'-4"
1'-4"
1'-4"
1'-4"
B1(10"X16")
10'-1"
B3(10"X18")
B3(10"X18")
#8@6"C/C #8@6"C/C
B3(10"X18")
#8@6"C/C #8@6"C/C
13'-6"
B4(10"X18")
3#16 3#16 3#16 3#16+2#12
9'-6"
B1(10"X16") SECTION NEAR SECTION SECTION NEAR SECTION
6'-7" 4'-8" SUPPORT 10"X16" AT MID SUPPORT 10"X16" AT MID
(10"X16")
B1
(10"X16")
11' 3'-2" 6'-7"
4'-1"
B2(10"X16") 10" 10" 10" 10"
B1
12'-1" 3#16+2#12 3#16+2#12 5#16 3#16
B3(10"X18")
B4(10"X18")
B3(10"X18")
B3(10"X18")
11'-6"
B1(10"X16") PROJECT:-
9'-7"
1'-6"
1'-6"
1'-6"
1'-6"
6'-7"
B3(10"X18")
B3(10"X18")
B3(10"X18")
B4(10"X18")
SECTION SECTION
(10"X16")
10"X18" AT MID
7'
B1 STAIRCASE
(10"X16")
SUPPORT SUPPORT
B4-ROOF BEAM
3'-1"
B3 - ROOF BEAM
B3 ENGINEER INCHARGE:-
B3(10"X18") (10"X18") B3(10"X18") B3(10"X18")
12'-1"
10'-7" ER. P.K. PUHAN
T2 LEFT SUPPORT T3 RIGHT SUPPORT T2 LEFT SUPPORT
(EXTRA) FIRST LAYER (EXTRA) FIRST LAYER (EXTRA) FIRST LAYER
T1 TOP R/F T1 TOP R/F T1 TOP R/F T1 TOP R/F
STRUCTURAL CONSULTANT:-
9'-7"
B3(10"X18")
B4(10"X18")
25Ø MIN 25Ø MIN SPACER BAR APS DESIGN INFRA PVT.LTD
13'-6"
13'-6"
T4 LEFT SUPPORT 25Ø MIN T4 LEFT SUPPORT #B/153, BDA Duplex Colony,
(EXTRA) SECOND LAYER STPS. IN T5 LEFT SUPPORT (EXTRA) SECOND LAYER Baramunda,Bhubaneswar,
MID ZONE (EXTRA) SECOND LAYER Pin- 751003,
D
D
SPACER BAR SPACER BAR
STPS. IN END ZONE STPS. IN END ZONE
(2XDEPTH OF BEAM)
25Ø MIN
STPS. IN END ZONE 25Ø MIN
(2XDEPTH OF BEAM) 7008777913
B1(10"X16") SPACER BAR
(2XDEPTH OF BEAM) [email protected]
B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F
(THRU.) 25Ø MIN (THRU.) (THRU.) www.apsdesigninfra.com
B1 BOTTOM R/F B1 BOTTOM R/F B1 BOTTOM R/F
(10"X16")
B1 BOTTOM R/F
6'-7" 4'-8" (THRU.) (THRU.) (THRU.)
B B B B (THRU.)
4'-6"
B1
[VERTICAL STPS]
B1(10"X16")
7'
D
AGENCY
B2 (THRU) B2 (THRU)
3'-2"
REMARK
THK.:5"
S1
Whichever is more
THK.:5"
0.15LX1
SUNKEN S1
LONGER SPAN
S2 THK.:5"
lvl.-11"
T8@6"C/C
T8@6"C/C
T8@6"C/C
SUNKEN
S2
SUPPORT(As3/As4)
lvl.-11"
AUTHORITY:-
S1
S1 THK.:5"
THK.:5"
SHORTER SPAN
THK.:5" PROJECT:-
T8@5"C/C
T8@6"C/C
T8@6"C/C
S1
REINFORCEMENT
TITLE:-
THK.:5"
LIFT S1
5'0"x7'0" THK.:5" STAIRCASE STILT FLOOR SLAB PLAN
S1
LONGER SPAN
THK.:5"
T8@6"C/C
T8@6"C/C
T8@6"C/C
ENGINEER INCHARGE:-
Whichever is more
0.3 LX2 or 2'-0"
SPAN(As1/As2)
STRUCTURAL CONSULTANT:-
S1 APS DESIGN INFRA PVT.LTD
0.15LX1
#B/153, BDA Duplex Colony,
THK.:5" Baramunda,Bhubaneswar,
S1 S1 Pin- 751003,
SHORTER SPAN
www.apsdesigninfra.com
T8@5"C/C
T8@6"C/C
T8@6"C/C
Whichever is more
0.3 LX2 or 2'-0"
SUNKEN S1 STATUS: ISSUED FOR CONSTRUCTION
S2
0.15LX2
THK.:5"
lvl.-11" SCALE
DESIGNED BY:
DATE DRAWN BY:
NTS
5"
5"
5"
S1 lvl.-11" AGENCY
THK.:5"
S1
THK.:5"
SLAB
NO.
S1
S1
S2
S3
THK.:5" STR-04
SPACE FOR STAMPING & SIGNATURE :
SUNKEN
S3 lvl.-6" D
3'-2"
1'-4"
1'-4"
1'-4"
1'-4"
B1(10"X16")
10'-1"
B3(10"X18")
B3(10"X18")
#8@6"C/C #8@6"C/C
B3(10"X18")
#8@6"C/C #8@6"C/C
13'-6"
B4(10"X18")
3#16 3#16 3#16 3#16+2#12
9'-6"
B1(10"X16") SECTION NEAR SECTION SECTION NEAR SECTION
6'-7" 4'-8" SUPPORT 10"X16" AT MID SUPPORT 10"X16" AT MID
(10"X16")
B1
(10"X16")
11' 3'-2" 6'-7"
4'-1"
B2(10"X16") 10" 10" 10" 10"
B1
12'-1" 3#16+2#12 3#16+2#12 5#16 3#16
B3(10"X18")
B4(10"X18")
B3(10"X18")
B3(10"X18")
11'-6"
B1(10"X16") PROJECT:-
9'-7"
1'-6"
1'-6"
1'-6"
1'-6"
6'-7"
B3(10"X18")
B3(10"X18")
B3(10"X18")
B4(10"X18")
SECTION SECTION
(10"X16")
10"X18" AT MID
7'
B1 STAIRCASE
(10"X16")
SUPPORT SUPPORT
B4-ROOF BEAM
3'-1"
B3 - ROOF BEAM
B3 ENGINEER INCHARGE:-
B3(10"X18") (10"X18") B3(10"X18") B3(10"X18")
12'-1"
10'-7" ER. P.K. PUHAN
T2 LEFT SUPPORT T3 RIGHT SUPPORT T2 LEFT SUPPORT
(EXTRA) FIRST LAYER (EXTRA) FIRST LAYER (EXTRA) FIRST LAYER
T1 TOP R/F T1 TOP R/F T1 TOP R/F T1 TOP R/F
STRUCTURAL CONSULTANT:-
9'-7"
B3(10"X18")
B4(10"X18")
25Ø MIN 25Ø MIN SPACER BAR APS DESIGN INFRA PVT.LTD
13'-6"
13'-6"
T4 LEFT SUPPORT 25Ø MIN T4 LEFT SUPPORT #B/153, BDA Duplex Colony,
(EXTRA) SECOND LAYER STPS. IN T5 LEFT SUPPORT (EXTRA) SECOND LAYER Baramunda,Bhubaneswar,
MID ZONE (EXTRA) SECOND LAYER Pin- 751003,
D
D
SPACER BAR SPACER BAR
STPS. IN END ZONE STPS. IN END ZONE
(2XDEPTH OF BEAM)
25Ø MIN
STPS. IN END ZONE 25Ø MIN
(2XDEPTH OF BEAM) 7008777913
B1(10"X16") SPACER BAR
(2XDEPTH OF BEAM) [email protected]
B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F
(THRU.) 25Ø MIN (THRU.) (THRU.) www.apsdesigninfra.com
B1 BOTTOM R/F B1 BOTTOM R/F B1 BOTTOM R/F
(10"X16")
B1 BOTTOM R/F
6'-7" 4'-8" (THRU.) (THRU.) (THRU.)
B B B B (THRU.)
4'-6"
B1
[VERTICAL STPS]
B1(10"X16")
7'
D
AGENCY
B2 (THRU) B2 (THRU)
3'-2"
REMARK
THK.:5"
S1
Whichever is more
THK.:5"
0.15LX1
SUNKEN S1
LONGER SPAN
S2 THK.:5"
lvl.-11"
T8@6"C/C
T8@6"C/C
T8@6"C/C
SUNKEN
S2
SUPPORT(As3/As4)
lvl.-11"
AUTHORITY:-
S1
S1 THK.:5"
THK.:5"
SHORTER SPAN
THK.:5" PROJECT:-
T8@5"C/C
T8@6"C/C
T8@6"C/C
S1
REINFORCEMENT
TITLE:-
THK.:5"
LIFT S1
5'0"x7'0" THK.:5" STAIRCASE FIRST FLOOR SLAB PLAN
S1
LONGER SPAN
THK.:5"
T8@6"C/C
T8@6"C/C
T8@6"C/C
ENGINEER INCHARGE:-
Whichever is more
0.3 LX2 or 2'-0"
SPAN(As1/As2)
STRUCTURAL CONSULTANT:-
S1 APS DESIGN INFRA PVT.LTD
0.15LX1
#B/153, BDA Duplex Colony,
THK.:5" Baramunda,Bhubaneswar,
S1 S1 Pin- 751003,
SHORTER SPAN
www.apsdesigninfra.com
T8@5"C/C
T8@6"C/C
T8@6"C/C
Whichever is more
0.3 LX2 or 2'-0"
SUNKEN S1 STATUS: ISSUED FOR CONSTRUCTION
S2
0.15LX2
THK.:5"
lvl.-11" SCALE
DESIGNED BY:
DATE DRAWN BY:
NTS
5"
5"
5"
S1 lvl.-11" AGENCY
THK.:5"
S1
THK.:5"
SLAB
NO.
S1
S1
S2
S3
THK.:5" STR-04
SPACE FOR STAMPING & SIGNATURE :
SUNKEN
S3 lvl.-6" D
3'-2"
1'-4"
1'-4"
1'-4"
1'-4"
B1(10"X16")
10'-1"
B3(10"X18")
B3(10"X18")
#8@6"C/C #8@6"C/C
B3(10"X18")
#8@6"C/C #8@6"C/C
13'-6"
B4(10"X18")
3#16 3#16 3#16 3#16+2#12
9'-6"
B1(10"X16") SECTION NEAR SECTION SECTION NEAR SECTION
6'-7" 4'-8" SUPPORT 10"X16" AT MID SUPPORT 10"X16" AT MID
(10"X16")
B1
(10"X16")
11' 3'-2" 6'-7"
4'-1"
B2(10"X16") 10" 10" 10" 10"
B1
12'-1" 3#16+2#12 3#16+2#12 5#16 3#16
B3(10"X18")
B4(10"X18")
B3(10"X18")
B3(10"X18")
11'-6"
B1(10"X16") PROJECT:-
9'-7"
1'-6"
1'-6"
1'-6"
1'-6"
6'-7"
B3(10"X18")
B3(10"X18")
B3(10"X18")
B4(10"X18")
SECTION SECTION
(10"X16")
10"X18" AT MID
7'
B1 STAIRCASE
(10"X16")
SUPPORT SUPPORT
B4-ROOF BEAM
3'-1"
B3 - ROOF BEAM
B3 ENGINEER INCHARGE:-
B3(10"X18") (10"X18") B3(10"X18") B3(10"X18")
12'-1"
10'-7" ER. P.K. PUHAN
T2 LEFT SUPPORT T3 RIGHT SUPPORT T2 LEFT SUPPORT
(EXTRA) FIRST LAYER (EXTRA) FIRST LAYER (EXTRA) FIRST LAYER
T1 TOP R/F T1 TOP R/F T1 TOP R/F T1 TOP R/F
STRUCTURAL CONSULTANT:-
9'-7"
B3(10"X18")
B4(10"X18")
25Ø MIN 25Ø MIN SPACER BAR APS DESIGN INFRA PVT.LTD
13'-6"
13'-6"
T4 LEFT SUPPORT 25Ø MIN T4 LEFT SUPPORT #B/153, BDA Duplex Colony,
(EXTRA) SECOND LAYER STPS. IN T5 LEFT SUPPORT (EXTRA) SECOND LAYER Baramunda,Bhubaneswar,
MID ZONE (EXTRA) SECOND LAYER Pin- 751003,
D
D
SPACER BAR SPACER BAR
STPS. IN END ZONE STPS. IN END ZONE
(2XDEPTH OF BEAM)
25Ø MIN
STPS. IN END ZONE 25Ø MIN
(2XDEPTH OF BEAM) 7008777913
B1(10"X16") SPACER BAR
(2XDEPTH OF BEAM) [email protected]
B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F
(THRU.) 25Ø MIN (THRU.) (THRU.) www.apsdesigninfra.com
B1 BOTTOM R/F B1 BOTTOM R/F B1 BOTTOM R/F
(10"X16")
B1 BOTTOM R/F
6'-7" 4'-8" (THRU.) (THRU.) (THRU.)
B B B B (THRU.)
4'-6"
B1
[VERTICAL STPS]
B1(10"X16")
7'
D
AGENCY
B2 (THRU) B2 (THRU)
3'-2"
REMARK
THK.:5"
S1
Whichever is more
THK.:5"
0.15LX1
SUNKEN S1
LONGER SPAN
S2 THK.:5"
lvl.-11"
T8@6"C/C
T8@6"C/C
T8@6"C/C
SUNKEN
S2
SUPPORT(As3/As4)
lvl.-11"
AUTHORITY:-
S1
S1 THK.:5"
THK.:5"
SHORTER SPAN
THK.:5" PROJECT:-
T8@5"C/C
T8@6"C/C
T8@6"C/C
S1
REINFORCEMENT
TITLE:-
THK.:5"
LIFT S1
5'0"x7'0" THK.:5" STAIRCASE SECOND FLOOR SLAB PLAN
S1
LONGER SPAN
THK.:5"
T8@6"C/C
T8@6"C/C
T8@6"C/C
ENGINEER INCHARGE:-
Whichever is more
0.3 LX2 or 2'-0"
SPAN(As1/As2)
STRUCTURAL CONSULTANT:-
S1 APS DESIGN INFRA PVT.LTD
0.15LX1
#B/153, BDA Duplex Colony,
THK.:5" Baramunda,Bhubaneswar,
S1 S1 Pin- 751003,
SHORTER SPAN
www.apsdesigninfra.com
T8@5"C/C
T8@6"C/C
T8@6"C/C
Whichever is more
0.3 LX2 or 2'-0"
SUNKEN S1 STATUS: ISSUED FOR CONSTRUCTION
S2
0.15LX2
THK.:5"
lvl.-11" SCALE
DESIGNED BY:
DATE DRAWN BY:
NTS
5"
5"
5"
S1 lvl.-11" AGENCY
THK.:5"
S1
THK.:5"
SLAB
NO.
S1
S1
S2
S3
THK.:5" STR-04
SPACE FOR STAMPING & SIGNATURE :
SUNKEN
S3 lvl.-6" D
3'-2"
1'-4"
1'-4"
1'-4"
1'-4"
B1(10"X16")
10'-1"
B3(10"X18")
B3(10"X18")
#8@6"C/C #8@6"C/C
B3(10"X18")
#8@6"C/C #8@6"C/C
13'-6"
B4(10"X18")
3#16 3#16 3#16 3#16+2#12
9'-6"
B1(10"X16") SECTION NEAR SECTION SECTION NEAR SECTION
6'-7" 4'-8" SUPPORT 10"X16" AT MID SUPPORT 10"X16" AT MID
(10"X16")
B1
(10"X16")
11' 3'-2" 6'-7"
4'-1"
B2(10"X16") 10" 10" 10" 10"
B1
12'-1" 3#16+2#12 3#16+2#12 5#16 3#16
B3(10"X18")
B4(10"X18")
B3(10"X18")
B3(10"X18")
11'-6"
B1(10"X16") PROJECT:-
9'-7"
1'-6"
1'-6"
1'-6"
1'-6"
6'-7"
B3(10"X18")
B3(10"X18")
B3(10"X18")
B4(10"X18")
SECTION SECTION
(10"X16")
10"X18" AT MID
7'
B1 STAIRCASE
(10"X16")
SUPPORT SUPPORT
B4-ROOF BEAM
3'-1"
B3 - ROOF BEAM
B3 ENGINEER INCHARGE:-
B3(10"X18") (10"X18") B3(10"X18") B3(10"X18")
12'-1"
10'-7" ER. P.K. PUHAN
T2 LEFT SUPPORT T3 RIGHT SUPPORT T2 LEFT SUPPORT
(EXTRA) FIRST LAYER (EXTRA) FIRST LAYER (EXTRA) FIRST LAYER
T1 TOP R/F T1 TOP R/F T1 TOP R/F T1 TOP R/F
STRUCTURAL CONSULTANT:-
9'-7"
B3(10"X18")
B4(10"X18")
25Ø MIN 25Ø MIN SPACER BAR APS DESIGN INFRA PVT.LTD
13'-6"
13'-6"
T4 LEFT SUPPORT 25Ø MIN T4 LEFT SUPPORT #B/153, BDA Duplex Colony,
(EXTRA) SECOND LAYER STPS. IN T5 LEFT SUPPORT (EXTRA) SECOND LAYER Baramunda,Bhubaneswar,
MID ZONE (EXTRA) SECOND LAYER Pin- 751003,
D
D
SPACER BAR SPACER BAR
STPS. IN END ZONE STPS. IN END ZONE
(2XDEPTH OF BEAM)
25Ø MIN
STPS. IN END ZONE 25Ø MIN
(2XDEPTH OF BEAM) 7008777913
B1(10"X16") SPACER BAR
(2XDEPTH OF BEAM) [email protected]
B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F
(THRU.) 25Ø MIN (THRU.) (THRU.) www.apsdesigninfra.com
B1 BOTTOM R/F B1 BOTTOM R/F B1 BOTTOM R/F
(10"X16")
B1 BOTTOM R/F
6'-7" 4'-8" (THRU.) (THRU.) (THRU.)
B B B B (THRU.)
4'-6"
B1
[VERTICAL STPS]
B1(10"X16")
7'
D
AGENCY
B2 (THRU) B2 (THRU)
3'-2"
REMARK
THK.:5"
S1
Whichever is more
THK.:5"
0.15LX1
SUNKEN S1
LONGER SPAN
S2 THK.:5"
lvl.-11"
T8@6"C/C
T8@6"C/C
T8@6"C/C
SUNKEN
S2
SUPPORT(As3/As4)
lvl.-11"
AUTHORITY:-
S1
S1 THK.:5"
THK.:5"
SHORTER SPAN
THK.:5" PROJECT:-
T8@5"C/C
T8@6"C/C
T8@6"C/C
S1
REINFORCEMENT
TITLE:-
THK.:5"
LIFT S1
5'0"x7'0" THK.:5" STAIRCASE THIRD FLOOR SLAB PLAN
S1
LONGER SPAN
THK.:5"
T8@6"C/C
T8@6"C/C
T8@6"C/C
ENGINEER INCHARGE:-
Whichever is more
0.3 LX2 or 2'-0"
SPAN(As1/As2)
STRUCTURAL CONSULTANT:-
S1 APS DESIGN INFRA PVT.LTD
0.15LX1
#B/153, BDA Duplex Colony,
THK.:5" Baramunda,Bhubaneswar,
S1 S1 Pin- 751003,
SHORTER SPAN
www.apsdesigninfra.com
T8@5"C/C
T8@6"C/C
T8@6"C/C
Whichever is more
0.3 LX2 or 2'-0"
SUNKEN S1 STATUS: ISSUED FOR CONSTRUCTION
S2
0.15LX2
THK.:5"
lvl.-11" SCALE
DESIGNED BY:
DATE DRAWN BY:
NTS
5"
5"
5"
S1 lvl.-11" AGENCY
THK.:5"
S1
THK.:5"
SLAB
NO.
S1
S1
S2
S3
THK.:5" STR-04
SPACE FOR STAMPING & SIGNATURE :
SUNKEN
S3 lvl.-6" D
3'-2"
1'-4"
1'-4"
1'-4"
1'-4"
B1(10"X16")
10'-1"
B3(10"X18")
B3(10"X18")
#8@6"C/C #8@6"C/C
B3(10"X18")
#8@6"C/C #8@6"C/C
13'-6"
B4(10"X18")
3#16 3#16 3#16 3#16+2#12
9'-6"
B1(10"X16") SECTION NEAR SECTION SECTION NEAR SECTION
6'-7" 4'-8" SUPPORT 10"X16" AT MID SUPPORT 10"X16" AT MID
(10"X16")
B1
(10"X16")
11' 3'-2" 6'-7"
4'-1"
B2(10"X16")
B1
12'-1" 10" 10" 10" 10"
3#16 3#16
B3(10"X18")
3#16+2#12 3#16
B4(10"X18")
B3(10"X18")
B3(10"X18")
11'-6"
B1(10"X16") PROJECT:-
9'-7"
1'-6"
1'-6"
1'-6"
1'-6"
6'-7"
RESIDENTIAL BUILDING
#8@6"C/C #8@6"C/C #8@6"C/C
B3 #8@6"C/C
B3(10"X18") (10"X18") B3(10"X18") B3(10"X18")
6'-3" TITLE:-
5' 11' 10'-7" 3#16 3#16+2#12
3'-1"
3#16 3#16
B3(10"X18")
B3(10"X18")
B3(10"X18")
B4(10"X18")
(10"X16")
7'
B1 STAIRCASE 10"X18" AT MID
(10"X16") SUPPORT SUPPORT 10"X18" AT MID PLAN
3'-1"
B3(10"X18")
B4(10"X18")
25Ø MIN 25Ø MIN SPACER BAR APS DESIGN INFRA PVT.LTD
13'-6"
13'-6"
T4 LEFT SUPPORT 25Ø MIN T4 LEFT SUPPORT #B/153, BDA Duplex Colony,
(EXTRA) SECOND LAYER STPS. IN T5 LEFT SUPPORT (EXTRA) SECOND LAYER Baramunda,Bhubaneswar,
MID ZONE (EXTRA) SECOND LAYER Pin- 751003,
D
D
SPACER BAR SPACER BAR
STPS. IN END ZONE STPS. IN END ZONE
(2XDEPTH OF BEAM)
25Ø MIN
STPS. IN END ZONE 25Ø MIN
(2XDEPTH OF BEAM) 7008777913
B1(10"X16") SPACER BAR
(2XDEPTH OF BEAM) [email protected]
B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F B2 BOTTOM EXTRA R/F
(THRU.) 25Ø MIN (THRU.) (THRU.) www.apsdesigninfra.com
B1 BOTTOM R/F B1 BOTTOM R/F B1 BOTTOM R/F
(10"X16")
B1 BOTTOM R/F
6'-7" 4'-8" (THRU.) (THRU.) (THRU.)
B B B B (THRU.)
4'-6"
B1
[VERTICAL STPS]
B1(10"X16")
7'
D
AGENCY
B2 (THRU) B2 (THRU)
3'-2"
REMARK
THK.:5"
S1
Whichever is more
THK.:5"
0.15LX1
LONGER SPAN
S3
THK.:5"
T8@6"C/C
T8@6"C/C
T8@6"C/C
S3
THK.:5"
SUPPORT(As3/As4)
AUTHORITY:-
S1
S1 THK.:5"
THK.:5"
SHORTER SPAN
THK.:5" PROJECT:-
T8@5"C/C
T8@6"C/C
T8@6"C/C
S1
REINFORCEMENT
TITLE:-
THK.:5"
LIFT S1
5'0"x7'0" THK.:5" STAIRCASE TERRACE FLOOR SLAB
S1 PLAN
LONGER SPAN
THK.:5"
T8@6"C/C
T8@6"C/C
T8@6"C/C
ENGINEER INCHARGE:-
Whichever is more
0.3 LX2 or 2'-0"
SPAN(As1/As2)
STRUCTURAL CONSULTANT:-
S1 APS DESIGN INFRA PVT.LTD
0.15LX1
#B/153, BDA Duplex Colony,
THK.:5" Baramunda,Bhubaneswar,
S1 S1 Pin- 751003,
SHORTER SPAN
www.apsdesigninfra.com
T8@5"C/C
T8@6"C/C
T8@6"C/C
Whichever is more
0.3 LX2 or 2'-0"
S3
STATUS: ISSUED FOR CONSTRUCTION
THK.:5"
0.15LX2
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
S3 DWG NO.:
THK.:5" DEPTH 16-10-2023 ER. HEENA ER. P.K. PUHAN
5"
5"
5"
S1 AGENCY
THK.:5"
S1
THK.:5"
SLAB
NO.
S1
S1
S2
S3
THK.:5" STR-04
SPACE FOR STAMPING & SIGNATURE :
S3
THK.:5" D
MB1 10"X16"
MB1 10"X16"
MB1 10"X16"
MB1 10"X16"
S1 S1 S1
7'
THK.:5" THK.:5" THK.:5"
AUTHORITY:-
1'-4"
DETAILS
#8@6"C/C
#8@6"C/C ENGINEER INCHARGE:-
10"X16" www.apsdesigninfra.com
DWG NO.:
REMARK STR-09
16-10-2023 ER. HEENA ER. P.K. PUHAN
S1 5" T8@5"C/C T8@6"C/C T8@5"C/C T8@6"C/C SPACE FOR STAMPING & SIGNATURE :
2'-6"
5' 2' 3'
1'
9'-10"
9'-7"
BED ROOM
12'-10"
12'6"x10'6" M.BED ROOM
7'-4"
11'0"x13'6"
DRAWING/DINING
26'-8"
11'0"X22'3"
1'-4"
DRIVE WAY
3'-3"
7' 1'-10" 3'-3"
2'
TOILET
1'-3" 2'
2'-6"
7'0"x4'6"
2'-6" 2'-6" 3'-10"
10"
TOILET
1'-3" 2'
8'-10" 3'-3" 7'0"x4'6"
AUTHORITY:-
3' 7" 7'
3'-6"
8'-11"
4'
BED ROOM KITCHEN PROJECT:-
12'6"x10'0" 11'0"x7'
5'
3'
9'-3" 1' RESIDENTIAL BUILDING
5"
6' 4' 9'-3"
D
1'-6"
1'-6"
4'-4" 4'-4"
2'
2'
STAIR CASE
STAIR CASE
2'-11"
TITLE:-
11'X7'
11'X7'
LIFT LIFT LOBBY
6'-2"
6'-2"
62'
62'
3'-8"
3'-8"
4'
4'
5'0"x7'0" 6'-3"
5'0"x7'0" 11'5"X7'0"
BRICKWORK PLAN
2'-11"
1'-6"
1'-6"
1'-4"
1'-4"
5' 9'-11" 5'
D ENGINEER INCHARGE:-
4' 7' 9'-11"
2'-8"
11'
ER. P.K. PUHAN
6'-4"
BED ROOM
12'6"x10'6"
STRUCTURAL CONSULTANT:-
9'-7"
9'-9"
5'
M.BED ROOM APS DESIGN INFRA PVT.LTD
DRAWING/DINING 11'0"x13'6" #B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
11'0"X22'3" Pin- 751003,
1'-3" 2'-3"
5'
7008777913
9'-3" 3'-3" [email protected]
www.apsdesigninfra.com
DRIVE WAY
2'
3'-3"
2'-2"
STR-04 TOILET
1'-4" 2'
26'-8"
7'0"x4'6" 7'-5"
2'-6"
2'-6"
2' 5"
4'-1"
8'-2" 3'-3" TOILET
DRESS STATUS: ISSUED FOR CONSTRUCTION
7'0"x4'6"
2'
3'-7" 7'
1'
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
DWG NO.:
10'-1"
3'
ER. P.K. PUHAN
9'-5"
BED ROOM
4'
1' 5' 2' 3'
KITCHEN
12'6"x10'6" 11'0"x7' AGENCY
3'-4"
3'
3'-6" 4' 3'-3" 4' WIDE BALCONY 9'-11"
13'-9" 11'-10"
4' WIDE BALCONY
W D2
BED ROOM
12'6"x10'6" M.BED ROOM
11'0"x13'6"
DRAWING/DINING
26'-8"
11'0"X22'3"
D1
DRIVE WAY
D1
V TOILET 3 BHK D3
7'0"x4'6" D3
B.U.A.-1037 SFT
D1 TOILET V
7'0"x4'6"
D2
W1 AUTHORITY:-
BED ROOM KITCHEN
W 12'6"x10'0" 11'0"x7'
D
PROJECT:-
STAIR CASE
STAIR CASE
11'X7'
11'X7'
LIFT LIFT LOBBY
62'
62'
5'0"x7'0" W1 5'0"x7'0" 11'5"X7'0" W1 RESIDENTIAL BUILDING
D TITLE:-
11'
BED ROOM DOOR & WINDOW SCHEDULE PLAN
12'6"x10'6"
W
M.BED ROOM
DRAWING/DINING 11'0"x13'6" ENGINEER INCHARGE:-
11'0"X22'3"
W
ER. P.K. PUHAN
D1
DRIVE WAY
D1
TOILET 3 BHK
STRUCTURAL CONSULTANT:-
26'-8"
V 7'0"x4'6"
D3 APS DESIGN INFRA PVT.LTD
B.U.A.-1037 SFT D3
#B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
D1 D3
TOILET
Pin- 751003,
DRESS 7'0"x4'6"
V 7008777913
[email protected]
www.apsdesigninfra.com
D2
BED ROOM KITCHEN W1
W
12'6"x10'6" D2
11'0"x7'
SCALE
DATE DRAWN BY: DESIGNED BY:
W1 NTS
DWG NO.:
16-10-2023 ER. HEENA
TYPICAL FLOOR PLAN ER. P.K. PUHAN
AGENCY
STILT FLOOR PLAN (1ST,2ND,3RD & 4TH)
3'
4'-6"
10'
10'
10'
7'
7'
7'
7'
7'
7'
7'
7'
2'
5'
4'
2'-6"
5'
2'-6"
D D1 D2 D3
W W1 V
A
KITCHEN
11'0"x7'0"
10'
10'
B B'
AUTHORITY:-
PROJECT:-
A'
ELEVATION - A-A' RESIDENTIAL BUILDING
ELEVATION - B-B'
TITLE:-
KITCHEN DETAILS
STRUCTURAL CONSULTANT:-
APS DESIGN INFRA PVT.LTD
#B/153, BDA Duplex Colony,
Baramunda,Bhubaneswar,
Pin- 751003,
7008777913
[email protected]
www.apsdesigninfra.com
FRIDGE
STATUS: ISSUED FOR CONSTRUCTION
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
DWG NO.:
16-10-2023 ER. HEENA ER. P.K. PUHAN
AGENCY
KITCHEN DETAILS
TOILET
7'0"x4'6"
AUTHORITY:-
PROJECT:-
350
700 460 RESIDENTIAL BUILDING
TITLE:-
20
460
790
ENGINEER INCHARGE:-
380
710 110 STRUCTURAL CONSULTANT:-
APS DESIGN INFRA PVT.LTD
#B/153, BDA Duplex Colony,
370
370
Pin- 751003,
7008777913
[email protected]
www.apsdesigninfra.com
610 530
70 STATUS: ISSUED FOR CONSTRUCTION
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
DWG NO.:
16-10-2023 ER. HEENA ER. P.K. PUHAN
800
510
AGENCY
615
315
SPACE FOR STAMPING & SIGNATURE :
610
W.M.
SLOPE
50mmØ GI
M.BED ROOM SL distribution
BED ROOM O
PE Pipe on terrace.
11'0"X13'6"
12'6"X10'6" 1:
25
0
GI
DRAWING/DINING
TOILET
7'0"X4'6" 11'0"X22'3"
TOILET AUTHORITY:-
7'0"X4'6"
GI
UP TITLE:-
STAIR CASE
STAIR CASE
C.B.
11'0"X7'0"
11'0"X7'0"
LIFT LIFT
5'0"X7'0" LOBBY 5'0"X7'0" LOBBY
11'5"X7'0" 11'5"X7'0" COLD WATER SUPPLY PLAN
DN
C.B.
D D
ENGINEER INCHARGE:-
TOILET
7'0"X4'6"
DRESS
GI
SL STATUS: ISSUED FOR CONSTRUCTION
O
PE
BED ROOM 1:
2 SCALE
12'6"x10'6" KITCHEN 50mmØ GI 50 DATE DRAWN BY: DESIGNED BY:
NTS
11'0"X7'0" distribution
Pipe on terrace. DWG NO.:
SLOPE 16-10-2023 ER. HEENA ER. P.K. PUHAN
W.M.
6'-6"
6'-6"
W
W
6'-6" 6'-6"
M.BED ROOM
BED ROOM
11'0"X13'6"
12'6"X10'6"
DRIVE WAY
WALL FOR TOILET AUTHORITY:-
PIPE LINE DRAWING/DINING
W
7'0"X4'6"
11'0"X22'3"
S
S
W
TOILET
7'0"X4'6"
S
W
WALL FOR
W
S
PIPE LINE
PROJECT:-
BED ROOM KITCHEN
12'6"X10'0" 11'0"X7'0" RESIDENTIAL BUILDING
D
TITLE:-
W
UP
UP
STAIR CASE
STAIR CASE
C.B. STP PLAN
11'0"X7'0"
11'0"X7'0"
LIFT LIFT
75'
S
S
W
W
S
STATUS: ISSUED FOR CONSTRUCTION
S
DRESS
SCALE
DATE DRAWN BY: DESIGNED BY:
NTS
STP BED ROOM DWG NO.:
10'7"X25'0" 12'6"x10'6" KITCHEN 16-10-2023 ER. HEENA ER. P.K. PUHAN
11'0"X7'0"
AGENCY
W.M.
W
W
W
6'-6"
6'-6"
SOAK PIT
S SPACE FOR STAMPING & SIGNATURE :
E W
50' 50' LEGEND OF ELECTRICAL FITTINGS
SL. SYMBOL SPECIFICATION N
6'-6" 37' 6'-6" 6'-6" 37' 6'-6" 01 1400mm(56") Sweep Ceiling Fan
6'-6"
02
5A
BED ROOM W.M.
12'6"x10'6" 06 TV TV Point
32IS
AC
5Amps Switch + Plug Socket Outlet
07
C 32
15 TV
5A Only On Independent Board
15 TV
12'-10"
15
15Amps Switch + Plug Socket Outlet
14'-9"
08
15 Only On Independent Board
M.BED ROOM 09 ELECTRICAL
Electrical Panel
26'-8"
PANEL
11'0"x13'6"
AUTHORITY:-
DRIVE WAY
GI 5A
DRAWING/DINING Branch Distribution Board Light
10 BDB(L)
11'0"X22'3"
5A
TOILET 3 BHK
9'-3" 7'0"x4'6"
11 BDB(L/P) Branch Distribution Board Power
B.U.A.-1037 SFT
TOILET
7'0"x4'6" Branch Distribution Board Power
15 IS
5A
12'-1" 12
15
BDB(UPS)
(UPS)
15
GI
FZ 13 AC 32A Industrial Switch
AC
11'-6" PROJECT:-
8'-11"
15 TV
BDB(UPS)
BED ROOM 15 18 watt LED Circular
AQ
BDB(L/P)
C 32
12'6"x10'0" FTTH
RESIDENTIAL APPARTMENT
32IS
AC
MCB TV D 15 5A 16 Ceiling Rose
11'
C.B. 17 Split AC Indoor Unit
STAIR CASE
STAIR CASE
23 C
62'
62'
75'
75'
11'X7'
11'X7'
LIFT LIFT LOBBY AC Outdoor Unit
5'0"x7'0" 5'0"x7'0" 11'5"X7'0"
18
TITLE:-
19 Geyser Point
C.B. GI
MCB
D TV 15 5A 20 Telephone Point ELECTRICAL LAYOUT
BDB(UPS)
21 15 IS 15A Industrial Socket
32IS
AC
BDB(L/P)
BED ROOM FTTH
TV
12'6"x10'6"
22 15 watt CFL Bulb (Wall Mounted)
15 TV
12'-10"
32IS
AC
23 Switch Board
14'-3"
C 32
C 32
M.BED ROOM
11'0"x13'6" 24 Mirror Light
GI 5A DRAWING/DINING
DRIVE WAY
5A
15 3 BHK
15 IS TOILET
11'-5" 9'-11" 7'0"x4'6" B.U.A.-1037 SFT 26
FZ Fridge
TOILET
7'0"x4'6" 27 Calling Bell Switch
5A
15
DRESS
GI 28 B Calling Bell
10'-10"
FZ
15 TV
29 Bullet Camera STRUCTURAL CONSULTANT:-
9'-5"
23 C
KITCHEN
AC
32IS 11'0"x7'
BED ROOM 30 20W Led Tube Light Ceiling Mounted APS DESIGN INFRA PVT.LTD
AQ
W.M. #B/153, BDA Duplex Colony,
5A
12'6"x10'6"
Baramunda,Bhubaneswar,
23 C
6'-6"
www.apsdesigninfra.com
33 Switch Board with UPS Powered
STATUS: ISSUED FOR CONSTRUCTION
34 solar
Inverter Solar Inverter
SCALE
35 Battery Lead Acid Battery DATE DRAWN BY: DESIGNED BY:
NTS
36 DS NO.:
Weather Proof Outdoor light/ Facade Light 24-08-2023 AR. D.D.RAO ER. P.K. PUHAN
ELECTRICAL LAYOUT
S
E W
50' 50' LEGEND OF ELECTRICAL FITTINGS
SL. SYMBOL SPECIFICATION N
6'-6" 37' 6'-6" 6'-6" 37' 6'-6" 01 1400mm(56") Sweep Ceiling Fan
6'-6"
02
2'-0"
12'-11"
5A
4' WIDE BALCONY
32IS 32IS
11'-10" 05 380mm Sweep Exhaust Fan
2'-0"
2'-0"
AC AC
C 32
3'-8" C 32
5A
BED ROOM W.M. 2'
5'-3"
12'6"x10'6" 06 TV TV Point
32IS
AC
5Amps Switch + Plug Socket Outlet
6'-021"
07
C 32
15 TV
6'-3" 5A
4'-921"
5'-6" Only On Independent Board
15 TV
12'-10"
9'-6"
15
15Amps Switch + Plug Socket Outlet
14'-9"
08
15 Only On Independent Board
2'-0" 8'-6"
6'-1"
5'-8"
2'-6"
M.BED ROOM 09 ELECTRICAL
Electrical Panel
6'-9"
26'-8"
PANEL
11'0"x13'6"
AUTHORITY:-
DRIVE WAY
GI 5A
DRAWING/DINING Branch Distribution Board Light
7'-0" 7'-0" 10 BDB(L)
2'-0"
11'0"X22'3"
5A
TOILET 3 BHK
9'-3" 11 Branch Distribution Board Power
6'-1"
7'0"x4'6" BDB(L/P)
B.U.A.-1037 SFT
TOILET
7'0"x4'6" Branch Distribution Board Power
15 IS
5A
12'-1" 12
15
BDB(UPS)
(UPS)
8'-6" 7'-0"
15
5'-0"
GI
FZ 13 AC 32A Industrial Switch
AC
11'-6" 5'-6" PROJECT:-
5'-1121"
6'-1"
8'-11"
5'-9"
15 TV
BDB(UPS)
BED ROOM 15 18 watt LED Circular
AQ
BDB(L/P)
2'-0" 2'-0"
C 32
12'6"x10'0" FTTH
RESIDENTIAL APPARTMENT
32IS
2'-0"
2'-0"
AC
MCB TV D 15 5A 16 Ceiling Rose
11'
C.B. 17 Split AC Indoor Unit
STAIR CASE
STAIR CASE
3'-6"
23 C
62'
62'
75'
75'
11'X7'
11'X7'
LIFT LIFT LOBBY AC Outdoor Unit
5'0"x7'0" 5'0"x7'0" 11'5"X7'0"
18
TITLE:-
4'-0" 19 Geyser Point
C.B. GI
2'-0"
2'-0"
MCB
4'-9"
2'-0" 8'-6" BDB(UPS)
2'-0" 7'-0" 21 15 IS 15A Industrial Socket
32IS
AC
BDB(L/P)
BED ROOM FTTH
TV
12'6"x10'6"
5'-1121"
22 15 watt CFL Bulb (Wall Mounted)
5'-7"
6'-3" 5'-8"
15 TV
12'-10"
9'-0"
32IS
AC
5'-6" 23 Switch Board
14'-3"
5'-0"
C 32
C 32
M.BED ROOM
11'0"x13'6" 24 Mirror Light
6'-9"
GI 5A DRAWING/DINING
DRIVE WAY
7'-7"
25 AQ
5A
15 3 BHK
15 IS TOILET
11'-5" 9'-11" 7'0"x4'6" B.U.A.-1037 SFT 26
FZ Fridge
7'-0" TOILET
7'0"x4'6" 27 Calling Bell Switch
5A
8'-6"
4'-7"
15
DRESS
5'-6" GI 28 B Calling Bell
10'-10"
FZ
15 TV
4'-4"
STRUCTURAL CONSULTANT:-
6'-021"
29 Bullet Camera
9'-5"
6'-3" 23 C
KITCHEN
AC
32IS 11'0"x7'
30 20W Led Tube Light Ceiling Mounted APS DESIGN INFRA PVT.LTD
5'-3"
BED ROOM
2'-0"
AQ
W.M. #B/153, BDA Duplex Colony,
5A
12'6"x10'6"
AC
23 C
6'-6"
www.apsdesigninfra.com
33 Switch Board with UPS Powered
STATUS: ISSUED FOR CONSTRUCTION
34 solar
Inverter Solar Inverter
SCALE
35 Battery Lead Acid Battery DATE DRAWN BY: DESIGNED BY:
NTS
36 DS NO.:
Weather Proof Outdoor light/ Facade Light 24-08-2023 AR. D.D.RAO ER. P.K. PUHAN
E W
50' 50' LEGEND OF ELECTRICAL FITTINGS
SL. SYMBOL SPECIFICATION N
6'-6" 37' 6'-6" 6'-6" 37' 6'-6" 01 1400mm(56") Sweep Ceiling Fan
6'-6"
02
5A
BED ROOM W.M.
12'6"x10'6" 06 TV TV Point
32IS
AC
5Amps Switch + Plug Socket Outlet
07
C 32
15 TV
5A Only On Independent Board
15 TV
12'-10"
15
15Amps Switch + Plug Socket Outlet
14'-9"
08
15 Only On Independent Board
M.BED ROOM 09 ELECTRICAL
Electrical Panel
26'-8"
PANEL
11'0"x13'6"
AUTHORITY:-
DRIVE WAY
GI 5A
DRAWING/DINING Branch Distribution Board Light
10 BDB(L)
11'0"X22'3"
5A
TOILET 3 BHK
9'-3" 7'0"x4'6"
11 BDB(L/P) Branch Distribution Board Power
B.U.A.-1037 SFT
TOILET
7'0"x4'6" Branch Distribution Board Power
15 IS
5A
12'-1" 12
15
BDB(UPS)
(UPS)
15
GI
FZ 13 AC 32A Industrial Switch
AC
11'-6" PROJECT:-
8'-11"
15 TV
BDB(UPS)
BED ROOM 15 18 watt LED Circular
AQ
BDB(L/P)
C 32
12'6"x10'0" FTTH
RESIDENTIAL APPARTMENT
32IS
AC
MCB TV D 15 5A 16 Ceiling Rose
11'
C.B. 17 Split AC Indoor Unit
STAIR CASE
STAIR CASE
23 C
62'
62'
75'
75'
11'X7'
11'X7'
LIFT LIFT LOBBY AC Outdoor Unit
5'0"x7'0" 5'0"x7'0" 11'5"X7'0"
18
TITLE:-
19 Geyser Point
C.B. GI
MCB
D TV 15 5A 20 Telephone Point ELECTRICAL LAYOUT
BDB(UPS)
21 15 IS 15A Industrial Socket
32IS
AC
BDB(L/P)
BED ROOM FTTH
TV
12'6"x10'6"
22 15 watt CFL Bulb (Wall Mounted)
15 TV
12'-10"
32IS
AC
23 Switch Board
14'-3"
C 32
C 32
M.BED ROOM
11'0"x13'6" 24 Mirror Light
GI 5A DRAWING/DINING
DRIVE WAY
5A
15 3 BHK
15 IS TOILET
11'-5" 9'-11" 7'0"x4'6" B.U.A.-1037 SFT 26
FZ Fridge
TOILET
7'0"x4'6" 27 Calling Bell Switch
5A
15
DRESS
GI 28 B Calling Bell
10'-10"
FZ
15 TV
29 Bullet Camera STRUCTURAL CONSULTANT:-
9'-5"
23 C
KITCHEN
AC
32IS 11'0"x7'
BED ROOM 30 20W Led Tube Light Ceiling Mounted APS DESIGN INFRA PVT.LTD
AQ
W.M. #B/153, BDA Duplex Colony,
5A
12'6"x10'6"
Baramunda,Bhubaneswar,
23 C
6'-6"
www.apsdesigninfra.com
33 Switch Board with UPS Powered
STATUS: ISSUED FOR CONSTRUCTION
34 solar
Inverter Solar Inverter
SCALE
35 Battery Lead Acid Battery DATE DRAWN BY: DESIGNED BY:
NTS
36 DS NO.:
Weather Proof Outdoor light/ Facade Light 24-08-2023 AR. D.D.RAO ER. P.K. PUHAN